@-0 M g 26 1982 DISTRIBUTION (AccketFile RBallard NRC PDR OParr L PDR WHazelton NSIC FCongel Docket flo. 50-266 ORB #3 Rdg WHaass DEisenhut JHeltemes OELD Mr. C. II. Fay ELJordan Assistant Vice President JMTaylor Wisconsin Electric Power Company PMKreutzer-3 231 llest flichigan Street RAClark Milwaukee, Wisconsin 53201 TColburn Gray File
Dear Mr. Fay:
ACRS-10 In conducting our review of your May 27, 1982 request, as supplemented by letters dated July 22, 1982 and Augut.t 10,1982, relating to Steam Generator replacement at Point Beach Nuclear Plant, Unit 1, we have determined that we will need. additional information identified in the enclosure to continue our review.
In order for us to maintain our review schedule, your response is requested by ?!ovember 12, 1982.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not re-quired under P.L.96-511.
Please contact us if you have any questions concerning this request.
Sincerely, Original signed by Robert A, Clark Robert A. Clark, Chia" Operating Reactors Branch #3 Division of Licensing
Enclosure:
Request for Additional Information cc w/ enclosure:
See next page C211160005 821026 FDR ADOCK 05000266 P
D.
0 QRP "J,;,Q(,,,,,,,f cmer >
RAC, ark /1,
.oRmd.P M,(,,,,,,,,,e,p,,,,
T,,C,g,1,,b u,r,n,/,,9 n, 1,0[ff,8.2,,,,,,,10/$d,S2,,,,,,, 1.
.aa.,,,,,,
., _, _.. _. ~.,..
enep OFFIClAL RECORD COPY uso m ises em NRC FORM 318 (10-80) NRCM 024
Wisconsin Electr'ic Power Company cc:
Mr. Bruce Churchill, Esquire Shaw, Pittman, Potts and Trowbridge USNRC Resident Inspectors Office 1800 M Street, N. W.
6612 Nuclear Road Washington, D. C.
20036 Two Rivers, Wisconsin 54241 Joseph Mann Library 1516 Sixteenth Street Two Rivers, Wisconsin 54241 Mr. Glenn A. Reed, Manager Nuclear Operations Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Gordon Blaha Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 Ms. Kathleen M. Falk s
General Counsel Wisconsin's Environmental Decade 114 N. Carroll Street Madison, Wisconsin 53703 U. S. Environmental Protection Agency Federal Activities Branch Region V Office ATTN: Regional Radiation Representative 230 S. Dearborn Street Chicago, Illinois 60604 Chairman Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 Regional Administrator Nuclear Regulatory Commission, Region III Office of Executive Director for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137
Enclosure REQUEST FOR ADDITIONAL INFORMATION POINT BEACH UNIT 1 STEAM GENERATOR REPLACEMENT 1.
With regard to heavy load handling during the proposed steam generator replacement, we.will need the following commitment in accordance with ANSI B30.2.0 " Overhead and Gantry Cranes" as referenced in NUREG-0612,
" Control of Heavy Loads at Nuclear Power Plants":
a.
Maintain complete records on the polar crane of all heavy loads handling operations during the repair phase.
b.
Perform the indicated inspections and load tests on the polar crane after completion of the repair phase and prior to returning the crane to its normal service.
2.
Verify that the steam generator repair program will not introduce a new feedring design creating the potential for steam generator water hammer or commit to performance of a water hammer test as part of the return-to-service testing program by automatically initiating auxiliary feedwater in accordance with the guidance in Branch Technical Position ASB 10-2.
3.
Loose parts and foreign objects left inside steam generators have been identified as the cause of at least two steam generator tube rupture events. Recent inspections have found a variety of foreign objects in the secondary side of steam generators. Please describe the precautions and programs that will be implemented to preclude the incorporation of foreign objects into the steam. generators during the current repair procedures as well as future surveillance methods to be implemented.
4.
Tha licensee should provide information demonstrating that decontamina-tion of the steam generators would result in no significant dose reduc-tion to plant personnel, as stated in Table 6-1, page 14 of 42, Item 4.
5.
The licensee should provide a commitment to train repairpersonnel in accordance with Regulatory Guides 8.13, 8.27, and 8.29 or submit acceptable alternatives.
6.
Section 2.1.4 should include a commitment to the following Regulatory Guides or the licensee should justify their exclusion:
a.
Regulatory Guide 1.39, " Housekeeping Requirements for Water-Cooled Nuclear Power Plants (endorses N45.2.3), Rev. 2, Sept. 1977.
b.
Regulatory Guide 1.58, " Qualification of Nuclear Power Plant Inspection, Examination, and Testing Personnel" (endorses N45.2.6), Rev.1, Sept. 1980.
, \\
c.
Regulatory Guide 1.88, " Collection, Storage, and Maintenance of Nuclear Power Plant Quality Assurance Records" (endorses N45.2.9),
Rev. 2, Oct. 1976.
d.
Regulatory Guide 1.94, " Quality Assurance Requirements for Installa-tion, Inspection, and Testing of Structural Concrete and Structural Steel During the Construction Phase of Nuclear Power Plants" (endorses N45.2.5), Rev. 1, April 1976.
e.
Regulatory Guide 1.144, " Auditing of Quality Assurance Programs for Nuclear Power Plants" (endorses N45.2.12), Rev. 1 Sept. 1983.
f.
Regulatory Guide 1.146, " Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants" (endorses N45.2.23),
Aug. 1980.
7.
As principal contractor to WE for the steam generator repair.. Westing-house should have its QA program description (s) submitted to and found acceptable by the NRC. WCAP 8370, #hich describes the QA program for the Westinghouse Nuclear Technology and Nuclear Components Divisions, has been so processed.
It should be referenced in Section 3.6.4 of the WE report as it is already referenced in Section 3.6.3.
WCAP 9245, which describes the QA program for the Westinghouse Nuclear Service Division, should be submitted for NRC staff review.
8.
Will there be any change in the amount of demineralizer waste discharged to Lake Michigan as a result of replacing the steam generators?
9.
Are any changes to the WPDES permit anticipated as a result of this action?
- 10. Will the parking lot and layout areas be on previous;y disturbed areas?
- 11. Will reconstruction of the barge slip involve a Corp of Engineers permit?
If so please provide a copy.