CPfat c.a.3
--4C
" Vj, Carolina Power & Light Company c
tra.sc.:Emn, cisar_ncu Ej Q
P. O. Box 101, New Hill, N. C.
27562 j{
May 26, 1983 3
2,9
~
0
- 0. y,
Mr. James P. O'Reilly NRC-76 O 9;.;
United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 3100)
Atlanta, Georgia 30303 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 900,000 KW - UNITS 1 & 2 AUXILIARY RELAY CABINETS, PURCHASE ORDER NY-435246, ITEM 105
Dear Mr. O'Reilly:
Attached is an interim report on the subject item which was deemed reportable per the provisions of 10CFR50.55(e) on April 28, 1983. CP&L is pursuing this matter, and it is currently projected that corrective action and sub-mission of the final report will be accomplished by July 29, 1983.
Thank you for your consideration in this matter.
Yours very truly, R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/sh Attachment cc:
Mr. G. Maxwell (NRC-SHNPP)
Mr. R. Prevatte (NRC-SHNPP)
Mr. V. Stello (NRC)
,OFF7CIAL Mh/
&^ A f F306070217 830526 PDR ADOCK 05000400 S
CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 INTERIM REPORT AUXILIARY RELAY CABINETS ITEM 105 MAY 25, 1983 REPORTABLE UNDER 10CFR50.55(e)
SUBJECT:
Shearon Harris Nuclear Power Plant, Unit 1,10CFR50.55(e) reportable deficiency in auxiliary relay cabinets supplied under Purchase order NY-435246.
ITEM:
Structural Welding SUPPLIED BY:
. Systems Control Corporation, Iron Mountain, Michigan NATURE OF DEFICIENCY:
The subject-Unit 1 equipment has been received at the site.
Weld deficiencies were noted when compared to the vendor's welding criteria.
DATE PROBLEM OCCURRED:
The problem was identified during a CP&L, vendor,.and Ebasco meeting / inspection at the site on October 21, 1982.
DATE PROBLEM REPORTED:
On November 1, 1982, CP&L (N. J. Chiangi) notified the p
NRC (A. Hardin) that this item was potentially reportable under 10CFR50.55(e) but not 10CFR Part 21.
On November 30, j.
1982, CP&L (R. M. Parsons) notified the NRC (J. P. O'Reilly) that this item was, after further evaluation, potentially reportable under 10CFR21 also. More recent evaluation i
has determined that since CP&L QA did not accept the equipment through our QA program, it is potentially 4
l reportable only under 10CFR50.55(e). On April 28, 1983 CP&L (N. J. Chiangi) notified the NRC (A. Hardin) that this item is reportable.
6 I
SCOPE OF PROBLEM:
The deficiency involves the following relay cabinets supplied under this purchase order:
1A-SA, 1B-SB, 2A-SA, 2B-SB, 3A-SA, 3B-SB, 4A-SA, 4B-SB, 19A-SA, 19B-SB.
SAFETY IMPLICATIONS:
Seismic qualification of the cabinets is required to assure structural integrity during a seismic event.
Safety-related components are located in the cabinets; thus, structural failure would jeopardize operation of l
safety-related equipment.
REASONS DEFICIENCY IS REPORTABLE:
The cabinets were inspected on site. HPES evaluated these defects and identified 16 as being potentially significant to the structural integrity of the equip-ment pertaining to seismic qualification.
l i
CORRECTIVE ACTION:
1.
The vendor has supplied revised drawings with critical welds identified.
2.
The vendor has done a seismic analysis (shake test) to determine structural integrity of the cabinets 1&4A-SA and 1&4B-SB as built.
The report of this analysis has been received and reviewed. Based on this report and testing and HPES evaluation of apparent weld deficiencies the cabinets are judged acceptable and seismically qualified.
3.
HPES has issued FCR-AS-2919 to correct apparent deficiencies identified by HPES.
4.
HPES has requested the vendor to evaluate the deficiencies as identified by the DDR and the HPES analysis. HPES letter to the vendor is H0-83165.
FINAL REPORT:
A follow up report will be issued by July 29, 1983, regarding vendor analysis. If the vendor analysis concurs with HPES evaluation, the report will be final.
l i
l l