Advises That Updating Inservice Insp Program Will Be Delayed Until Aug 1983.Commitment to Examine Control Rod Drive Scram Discharge Vol Piping Welds Will Be Met & Unaffected by Delay in Update of Inservice Insp Program
ML20071J760
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 05/19/1983
From: Gucwa L
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0803, RTR-NUREG-803 NED-83-256, TAC-43733, TAC-43738, NUDOCS 8305270128
Download: ML20071J760 (1)


Text

Geo:g.a Pcw Compny 333 Petment Avenue Attanta. Georga 30308 Telephone 404 526 6526 Meng Address:

Post Off.ce Box 4545 At a"ta. Georgia 30302 Georgia Power L. T. Guewa uv weNm van,c sovm Uf$NINa,tmen' May 19, 1983 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, tPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 CRD SCRAM DISCHARGE VOLU E PIPING INSERVICE INSPECTION Gentlemen:

By letter dated March 5,

1982, Georgia Power Company committed to include weld examination of the CRD Scram Discharge Volume headers in the inservice inspection (ISI) program when it was to be updated in January, 1983.

This commitment was made in response to NRC concerns expressed in NUREG-0803, " Generic Safety Evaluation Report Regarding Integrity of BWR Scram System Piping."

As a result of extensive nondestructive examination and engineering support required from the Southern Company Services ISI Group, as discussed in our January 7, 1983, letter to NRC, the voluntary updating of the ISI program has been delayed until August, 1983, for both Hatch units.

A point of clarification to our January 7, 1983, letter is provided herein.

Although the program has not been updated, several CRD Scram Discharge Volume piping welds are scheduled to be examined during the current Unit 2 refueling outage.

Such examinations will be conducted in accordance with ASE code Section XI, 1980 Edition, including Addenda through Winter 1980.

This code requires surface examinations of the subject welds.

Therefore, our commitment to examine these welds will be met and is unaffected by the delay in the update of the ISI program.

Should you have any questions in this regard, please contact this office.

Sincerely yours, 8305270128 830519

{DRADDCK 05000321 IY**

PDR L. T. Gucwa JAE/mb xc:

H. C. Nix, Jr.

J. P. O'Reilly (NRC-Region II)

Senior Resident Inspector