ML20004C327

From kanterella
Jump to navigation Jump to search

Informs That NEDE-24342, GE Evaluation in Response to NRC Request Re BWR Scram Sys Pipe Breaks & Forwarding Ltr Respond to NRC 810410 Request for Generic Evaluation of Applicability of Postulated Breaks
ML20004C327
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 05/28/1981
From: Beckham J
GEORGIA POWER CO.
To:
Office of Nuclear Reactor Regulation
References
TAC-43733, TAC-43738, NUDOCS 8106030178
Download: ML20004C327 (1)


Text

e-4 Georgia Power Company '

  • 333 Pedmont Avenue Atlanta. Georg a 30308 Telepnone 404 526-6526 Vaihng Address.

Post of' ice Bor :545 May 28, 1981 Atlanta. Georgia 30302 GeorgiaPower the southem erectic system Power Generation Department b

U. S. Nuclear'Regulatcry Commission to QN Office of MJclear Raactor Regulation O

fy[

3 g{

'tchington, D. C.

20555 E

JUN 0 2198I 5. 6 WC DOCKETS 50-32., 50-366 OPERATING LICENSES DPR-57, WF-5 EDWIN I. HATCH NUCLEAR PL4NT UNITS 1, 2

(

M 7, [

SAFETY C0 FERNS ASSOCIATED WITH PIPE BREAKS IN THE BWR SCRAM SYSTEM m @' )'

GentJemen:

Your Otter of April 10, 1981, requested Georgia Power Company to perfcrm a) a generic evaluation of the applicability of postulated breaks in the BWR scram system, an estimate of tne probability of occurrence of the postulated sequences of events, and the bases for our conclusions; b) a generic evaluation of the applicability of the AE00 report relative to BWR plant construction,. design, and operation with the basis for our conclusions; and c) a generic evaluation of the AE00 recommendations.

Georgia Porser Company requested General Electric Company, as NSSS supplier, to perform the evaluations requested by your April 10, 1981, letter.

Their letter to you, dated April 30, 1981, transmitted the results of the GE evaluation-in Topical Report NEDE-24342, "GE Evaluation in Response to NRC Request Regarding BWR Scram System Pipe Breaks".

The referenced GE Topical Report and letter provi% Georgia Power Company's reponse to the items requested within 45 days of receipt of your April 10, 1981, letter.

t l

J. T. Beckham, Jr. states that he is Vice President of Georgia Power Cc,mpany and is authorized to execute this cath on behalf of Georgia Power Company, and that to the best of his knowledge and belief the facts set forth in this letter are true.

1 GEORGIA POWER COMPANY By:

[A

-h i

I

/J.T.Beckham,Jf.

Sworn to and subscribed. efore my this 28th day of May,1981.

jjf Notary Pubhc, Georgia. State at Large g

h My Co". mission Expires Sept. 20,1983 Notary Puolic t

~

MN ROB /mb h xc:

M. Manry

~~

~

A R. F. Rogers, III gg g 8106030 %

~

.