Notifies of Intention to Revise Schedule for Implementation of NUREG-0737,Items I.C.1, Revise Emergency Procedures & III.A.2.2, Meteorological Data, in Response to Generic Ltr 82-33
ML20028C826
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 01/07/1983
From: Gucwa L
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.C.1, TASK-3.A.2.2, TASK-TM GL-82-10, GL-82-33, NED-83-025, NED-83-25, TAC-43627, TAC-43628, TAC-48505, TAC-48506, NUDOCS 8301140184
Download: ML20028C826 (1)


Text

~ Georg;a P&er Company 333 Pw-:af Avenw Atlanta Georg>a 30308 TeMphve 404 526-6526 Masng Address Post Othce Box 4545 Atta.ita. Gearg a 30302 Georgia Power Power Ganeration Department NED-83-025 January 7, 1983 Director of Nuclear Reactor Regulation Attention: Mr._ John Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Caumission Washington, D. C. 20555 NBC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HA'ICH NUCLEAR PLANT UNITS 1, 2 POST TMI REQUIREMENTS, NUREG-0737 ITEMS I.C.1 AND III.A'.2.2 Gentlemen:

Our June 4, 1982 response to Generic Letter 82-10 provided inplementation schedules for selecued 'IMI Action Plan items. Generic Letter 82-33, " Requirements for Emergency Response Capability" dated December 17, 1982, requires that elements of emergency response capability be "...

integrated with respect to the overall enhancement of operator ability to comprehend plant conditions and cope with emergencies." The letter also states that its requirements "... replace the corresponding requirements in the affected NUREG-0737 items and should be used by you in meeting the goals of these action plan items".

Georgia Power Company concurs with the requirement to coordinate implementation of enhancements required as a result of 'INI. Accordingly, we intend to revise our schedule for inplementation of items I.C.1 (Revise I emergency procedures) and III.A.2.2 (Meteorological data) to allcw '

coor.'.inated inplementation of related requirements. We will propose new inplementation dates for these two items in our response to Generic Letter 1 82-33. Other dates provided in the June 4 letter will not be affected.

Please contact this office if you need any additional information.

Yours very truly, I