Monthly Operating Repts for Jan 1983
ML20071F106
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 02/01/1983
From: Schmitendorf G
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20071F099 List:
References
NUDOCS 8303150441
Download: ML20071F106 (9)


Text

._

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH January YEAR 1983 APPROVED:

/

/ N STATfDN MANAGER -L/

8303150441 830215 DR ADOCK 05000

OPERATING DATA REPORT DOCKET NO. 50-338 DATE 02-01-83 COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 OPERATING STATUS Notes

1. Unit Name: North Anna 1 4 2. Reporting Period: January 1983
3. Licensed Thermal Power (MWt): 2775
4. Nameplate Rating (Gross MWe): 947
5. Design Electrical Rating (Net MWe): 907
6. Maximum Dependable Capacity (Grocs NWe): 918
7. Maximum Dependable Capacity (Net NWe): 865
8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:

NA

9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 744 744 40,825
12. Number of Hours Reactor Was Critical 0 0 27,123
13. Reactor Reserve Shutdown Hours 744 744 1,998.1
14. Hours Generator On-Line 0 0 26,382.2
15. Unit Reserve Shutdown Hours 0 0 __ 0
16. Gross Thermal Energy Generated (MWH) 0 0 68,259,354
17. Gross Electrical Energy Generated (MWH) 0 0 21,784,532
18. Net Electrical Energy Generated (MWH) 0 0 20,520,733
19. Unit Service Factor 0 0 64.6
20. Unit Availability Factor 0 0 64.6-
21. Unit Capacity Factor (Using MDC Net) 0 0 58.1
22. Unit Capacity Factor (Using DER Net) 0 0 55.4
23. Unit Forced Outage Rate 100.0 100.0 9.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25. If Shut Down At End Of Report Period, Estimated Date of Startup: 03-10-83
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. 50-338 UNIT NAME North Anna 1 DATE 02-01-83 REPORT HONTH Janua ry COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 l 2 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (Hours) Shutting 3

  • 4 Code 5

Action to Down Reactor Report # Prevent Recurrence 82-12 821205 F 744 A 3 82-85 SF INSTRU The transformer failure of the previous month caused extensive damage to the main generator.

The main generator and the three main transformers are being replaced.

I 2 3 4 F: Forced Reason: Method: Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-C161)

E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other 5 G-Operational Error (Explain)

H-Other (Explain) Exhibit H - Same Source

m AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-338 UNIT NA-1 DATE 02-01-83

. COMPLETED BY G. Schmitendor TELEPHONE 703-894-5151X2502 MONTH January DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

a Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO. 50-338 REPORT MONTH January UNIT NAME NA-1 YEAR 1983 DATE 02-01-83 COMPLETED BY G. D. Schmitendorf _

NO ENTRIES THIS MONTH 4

l l

l l

l

OPERATING DATA REPORT DOCKET NO. 50-339 DATE 02-01-83 COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 OPERATING STATUS Notes

1. Unit Name: North Anna 2
2. Reporting Period: January 1983
3. Licensed Thermal Power (MWt): 2775
4. Nameplate Rating (Gross MWe): 947
5. Design Electrical Rating (Net NWe): 907
6. Maximum Dependable Capacity (Gross MWe): 939
7. Maximum Dependable Capacity (Net NWe): 890
8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:

NA

9. Power Level To Which Restricted, If Any (Net NWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 744 744 18,696
12. Number of Hours Reactor Was Critical 693.3 693.3 13,196.4
13. Reactor Reserve Shutdown Hours 95.9 95.9 2,117.7
14. Hours Generator On-Line 648.1 648.1 13,100.8
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1,547,712 1,547,712 33,273,732
17. Gross Electrical Energy Generated (MWH) 508,021 508,021 11,097,317
18. Net Electrical Energy Generated (MWH) 479,398 479,398 10,529,016
19. Unit Service Factor 87.1 87.1 70.0
20. Unit Availability Factor 87.1 87.1 70.0
21. Unit Capacity Factor (Using MDC Net) 72.4 72.4 63.3
22. Unit Capacity Factor (Using DER Net) 71.0 71.0 62.1
23. Unit Forced Outage Rate 12.9 12.9 19.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage 04-01-83 thru 05-13-83

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-339 UNIT NAME North Anna 2 i

DATE 02-01-83 REPORT MONTH Janua ry COMPLETED BY G. D. Schmitendorf I

TELEPHONE- (703) 894-5151 X2502 l

No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (Hours) Shutting 3

vent de 4

Code Action to Down Reactor Report # 5 Prevent Recurrence 1

83-01 830104 95.9 A 1 NA NA NA Hydrogen leak in Main Generator.

Leaks located, repaired, and unit returned to power.

83-02 830114 0 A 5 NA NA NA Load Reduction in order to reduce High Cation Conductivity of the S/G Chemistry. Condenser tube leaks were found and repairs were made.

83-03 830118 0 A 5 NA NA NA Load Reduction in order to reduce High Cation Conductivity of the S/G Chemistry. Condenser tube leaks were found and repairs were made.

83-04 830120 0 A 5 NA NA NA Load Reduction in order to reduce High Cation Conductivity of the S/G Chemistry. Condenser tube leaks were found and repairs were made.

i 1 2 3 4 F: Forced Reason: Method: Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)

E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error (Explain) 5 H-Other (Explain) Exhibit H - Same Source

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-339 UNIT NA-2 DATE 02-01-83

. COMPLETED BY G. Schmitendor ,

TELEPHONE 703-894-5151X2502 MONTH January DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 858 17 863 2 864 18 327 3 836 19 798 4 28 20 858 5 0 21 249 6 0 22 792 7 0 23 864 8 294 24 865  ;

9 857 25 869 10 855 26 870 11 856 27 870 12 857 28 870 13 859 29 862 14 383 30 869 15 237 31 869 16 497 f

j INSTRUCTIONS 1

! On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO. 50-339 REPORT MONTH January UNIT NAME NA-2 YEAR 1983 DATE 02-01-83 COMPLETED BY G. D. Schmitendorf f

83-01 (A) (1) At 2115 on January 3, 1983 with the Unit at 100% power a unit rampdown to off-line was commenced due to Hydrogen leaks at the Main Generator. The generator was taken off-line at 0305 on January 4,1983, with the reactor maintained critical. At 1044 on January 5, 1983, a Reactor Trip due to Steam Generator Low-Low level occurred. The unit was stabilized in Mode 3 (Hot Standby) while awaiting completion of repairs to the Main Generator. Repairs to the Main Generator Hydrogen system were completed and the reactor reached criticality at 1325 January 7, 1983. The unit was placed on-line at 0257 and reached 100%

power at 2300 January 8, 1983.