ML20071F131

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Nov 1982
ML20071F131
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/01/1982
From: Schmitendorf G
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20071F099 List:
References
NUDOCS 8303150447
Download: ML20071F131 (1)


Text

. -

Corrected Copy OPERATING DATA REPORT DOCKET NO. 50-339 DATE 12-01-82 COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 8'94-5151 X2502 OPERATING STATUS Notes

1. Unit Name: North Anna 2
2. Reporting Period: November 1982
3. Licensed Thermal Power (MWt): 2775
4. Nameplate Rating (Gross MWe): 947
5. Design Electrical Rating (Net NWe): 907
6. Maximum Dependable Capacity (Gross MWe): 939
7. Maximum Dependable Capacity (Net MWe): 890
8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons: <

NA

9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 720 8,016 17,208
12. Number of Hours Reactor Was Critical 713.3 4,344.3 11,759.1
13. Reactor Reserve Shutdown Hours 0 388.6 2,021.8
14. Hours Generator On-Line 705.6 4,249.3 11,708.7
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1,901 t368 10,950,658 29,733,499
17. Gross Electrical Energy Generated (MWH) 625,900 3,629,710 9,938,942
18. Net Electrical Energy Generated (MWH) 592,375 3,431,563 9,433,979
19. Unit Service Factor 98.0 53.0 , 68.0
20. Unit Availability Factor 98.0 53.0 68.0
21. Unit Capacity Factor (Using MDC Net) 92.4 48.1 61.6
22. Unit Capacity Factor (Using DER Net) 90.7 47.2 60.4
23. Unit Forced Outage Rate 2.0 25.4 21.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage 04-01-83 thru 05-15-83

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8303150447 830215 PDR ADOCK 05000338 R PDR

Corrected Copy OPERATING DATA REPORT DOCKET NO. 50-339 DATE 12-01-82 COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 OPERATING STATUS Notes

1. Unit Name: North Anna 2
2. Reporting Period: November 1982
3. Licsased Thermal Power (MWt): 2775
4. Nameplate Rating (Gross MWe): 947
5. Design Electrical Rating (Net MWe): 907
6. Maximum Dependable Capacity (Gross MWe): 939
7. Maximum Dependable Capacity (Net MWe): 890
8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:

NA

9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 720 8,016 17,208
12. Number of Hours Reactor Was Critical 713.3 4,344.3 11,759.1
13. Reactor Reserve Shutdown Hours 0 388.6 2,021.8
14. Hours Generator On-Line 705.6 4,249.3 11,708.7
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1,901,368 10,950,65tt___ 29,733,499 9,938,942
17. Gross Electrical Energy Generated (MWH) 625,900 3,629,710 l 9,433,979
18. Net Electrical Energy Generated (NWH) 592,375 3,431,563 l 19. Unit Service Factor 98.0 53.0 , 68.0
20. Unit Availability Factor 98.0 53.0 68.0
21. Unit Capacity Factor (Using MDC Net) 92.4 48.1 61.6
22. Unit Capacity Factor (Using DER Net) 90.7 47.2 60.4
23. Unit Forced Outage Rate 2.0 25.4 21.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage 04-01-83 thru 05-15-83 l 25. If Shut Down At End Of Report Period, Estimated Date of Startup:

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION