Revised Monthly Operating Rept for Dec 1982
ML20071C742
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/03/1983
From: Bogart D
FLORIDA POWER CORP.
To:
Shared Package
ML20071C732 List:
References
NUDOCS 8303080045
Download: ML20071C742 (4)


Text

OPERATING DATA REPORT DOCKET NO.

50-102 DATE 1/1/R1 COMPLETED BY D. Bonart TELEPHONE (904) 795-6486 OPERATING STA7US

1. Unit Name:

Crystal River Unit #3 Notes (2/1/83) Revise 3"

2. R*POstinE eriod:

12/1/82 - 12/31/82 average daily power levels P

(29th, 30th, and 31st) due to 2544

3. Licensed Thermal Power (MWt):

hs h

r

4. Nameplate Rating (Gross MWe):

890 readings. Changes circled on 825

5. Design Electrical Rating (Net MWe):

attached page.

6. Maximum Dependable Capacity (Gross MWe):

845 806

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A 2475 MW thermal

9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions.If Any:

Pump Power Monitors in bypass.

This Month Yr to-Date Cumulative

11. Hours in Reporting Period 744 8760 50880 251.3 6757.8 32207.2
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0

71.1 1280.3 243.2 6654.7 31466.9

14. Hours Generator On.Line l
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 561306 15158014 70524955
17. Gross Electrical Energy Generated (MWH) 194455 5167026 23966617 185224 4915582 22744880
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 32.7%

76.0%

61.8%.

20. Unit Availability Factor 12.7!

76.0%

61.8%

21. Unit Capacity Factor (Using MDC Net) 30.9%

69.6%

56.9%

30.2%

68.0%

54.2%

22. Unit Capacity Factor (Using DER Net) 67.3%

24.0%

26.1%

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each):

Refuel outage beginning 3/19/83, scheduled to last 16 weeks.

y-

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achiesed I/14/77.

INITIA L CRITICA LITY I/30/77 INITIA L ELECTRICITY COilNIERCIAL OPERATION 1/11/77 P303080045 830215 6/77)

PDR ADOCK 05000302 R

PDR

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-302 FLCRP-3 UNIT DATE 1/3/83 COMPLETED BY D. Bogart TELEPHONE (904) 795-6486 MONTH December 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(gwe. Net) o-0 37 l

1 0

o l

2 y,

3 19 0

0 0

20 4

0 156 5

21 t

6 22 650 802 0

23 7

0 8

24 n?A 9

25 821

)

822 0

26 10 I

O II 27 821 819 l

12 28 0

13 29 14 30 0

3y 15 0

16 INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

l 19/77)

n, (f

D DOCKET NO. 50-102 UNITSHUTDOWNS AND POWER REDUC 110NS UNIT NAME FTN

't DATE 1/10/83 COMPLETED BY M. W. Culver REPORT MONTH 12/82 l

TELEPHONE (904) 795-6486 j

w a

.! E 3

y.E 5 Licensee Eg Cause & Corrective l

No.

Date i

E8 5

2s&

Event 3,3 AI"" ' "

$E 5

.5 5 c Report #

mu

,E u Prevent Recurrence 1

H R

u e

6 82-31 821201 F

492.8 A

1 No LER # yet.

PC HTEXCH Continuation of outage for replacing See NCOR 82-letdown coolers.

322 l

82-32 821230 F

8.0 H

3 h/A EA ZZZZZZ Experienced a system grid upset due to i

losing St. Lucie Nuclear Plant. This l

caused a turbine trip, which in turn caused a reactor trip.

l 1

l

\\

l l

i I

2 3

4 F: Forced Reason:

Method:

Exhibit G. instructions S: Scheduled A-Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 016I)

E4perator Training & Ucense Examination F-Adadnistrative 5

i G Operational Error (Explain)

Exhibit I - Same Source (9/77)

Il-Other (Explain)

MONTHLY OPERATIONAL

SUMMARY

STATEMENT

[:

DOCKET NO. 50-107 UNIT FLCRP-3 DATE 1/10/83 COMPLETED BY M.W. Culver TELEPHONE (904) 795-6486 MONTH December 1982 e

SUMMARY

STATEMENT:

The unit began the month with the continuation of an outage from last month. After returning to power on 12/23/82, it experienced an additional trip on 12/30/82, from which it recovered and returned to power on the same day.