OPERATING DATA REPORT DOCKET NO.
50-102 DATE 1/1/R1 COMPLETED BY D. Bonart TELEPHONE (904) 795-6486 OPERATING STA7US
- 1. Unit Name:
Crystal River Unit #3 Notes (2/1/83) Revise 3"
- 2. R*POstinE eriod:
12/1/82 - 12/31/82 average daily power levels P
(29th, 30th, and 31st) due to 2544
- 3. Licensed Thermal Power (MWt):
hs h
r
- 4. Nameplate Rating (Gross MWe):
890 readings. Changes circled on 825
- 5. Design Electrical Rating (Net MWe):
attached page.
- 6. Maximum Dependable Capacity (Gross MWe):
845 806
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A 2475 MW thermal
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
Pump Power Monitors in bypass.
This Month Yr to-Date Cumulative
- 11. Hours in Reporting Period 744 8760 50880 251.3 6757.8 32207.2
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0
71.1 1280.3 243.2 6654.7 31466.9
- 14. Hours Generator On.Line l
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 561306 15158014 70524955
- 17. Gross Electrical Energy Generated (MWH) 194455 5167026 23966617 185224 4915582 22744880
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 32.7%
76.0%
61.8%.
- 20. Unit Availability Factor 12.7!
76.0%
61.8%
- 21. Unit Capacity Factor (Using MDC Net) 30.9%
69.6%
56.9%
30.2%
68.0%
54.2%
- 22. Unit Capacity Factor (Using DER Net) 67.3%
24.0%
26.1%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each):
Refuel outage beginning 3/19/83, scheduled to last 16 weeks.
y-
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achiesed I/14/77.
INITIA L CRITICA LITY I/30/77 INITIA L ELECTRICITY COilNIERCIAL OPERATION 1/11/77 P303080045 830215 6/77)
PDR ADOCK 05000302 R
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-302 FLCRP-3 UNIT DATE 1/3/83 COMPLETED BY D. Bogart TELEPHONE (904) 795-6486 MONTH December 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(gwe. Net) o-0 37 l
1 0
o l
2 y,
3 19 0
0 0
20 4
0 156 5
21 t
6 22 650 802 0
23 7
0 8
24 n?A 9
25 821
)
822 0
26 10 I
O II 27 821 819 l
12 28 0
13 29 14 30 0
3y 15 0
16 INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
l 19/77)
n, (f
D DOCKET NO. 50-102 UNITSHUTDOWNS AND POWER REDUC 110NS UNIT NAME FTN
't DATE 1/10/83 COMPLETED BY M. W. Culver REPORT MONTH 12/82 l
TELEPHONE (904) 795-6486 j
w a
.! E 3
y.E 5 Licensee Eg Cause & Corrective l
No.
Date i
E8 5
2s&
Event 3,3 AI"" ' "
$E 5
.5 5 c Report #
mu
,E u Prevent Recurrence 1
H R
u e
6 82-31 821201 F
492.8 A
1 No LER # yet.
PC HTEXCH Continuation of outage for replacing See NCOR 82-letdown coolers.
322 l
82-32 821230 F
8.0 H
3 h/A EA ZZZZZZ Experienced a system grid upset due to i
losing St. Lucie Nuclear Plant. This l
caused a turbine trip, which in turn caused a reactor trip.
l 1
l
\\
l l
i I
2 3
4 F: Forced Reason:
Method:
Exhibit G. instructions S: Scheduled A-Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 016I)
E4perator Training & Ucense Examination F-Adadnistrative 5
i G Operational Error (Explain)
Exhibit I - Same Source (9/77)
Il-Other (Explain)
MONTHLY OPERATIONAL
SUMMARY
STATEMENT
[:
DOCKET NO. 50-107 UNIT FLCRP-3 DATE 1/10/83 COMPLETED BY M.W. Culver TELEPHONE (904) 795-6486 MONTH December 1982 e
SUMMARY
STATEMENT:
The unit began the month with the continuation of an outage from last month. After returning to power on 12/23/82, it experienced an additional trip on 12/30/82, from which it recovered and returned to power on the same day.