ML20070V434

From kanterella
Jump to navigation Jump to search
Forwards List of Deficiencies Determined to Have No Adverse Impact on Safe Operations of Plants & Were Removed from 10CFR50.55(e) Status
ML20070V434
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 02/10/1983
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8302170342
Download: ML20070V434 (2)


Text

T W

TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 374ot 400 Chestnut Street Tower II c.;

9 February 10, 1983

']

2 s

U.S. Nuclear Regulatory Comission 7

Region II

3 Attn

Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 3100 en Atlanta, Georgia 30303 cc

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - REMOVAL OF ITEMS FROM 10 CFR 50.55(e)

STATUS Sc. u3fs Go *l3]

Enclosed for your information and use is a list of items that should be removed from 10 CFR 50.55(e) status in your Bellefonte Nuclear Plant records. These deficiencies have been determined to have no adverse impact on the safety of operations of the plant and were so reported in TVA's final reports for each one. Therefore, they will be removed from our list of open 10 CFR 50.55(e) items.

If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Licensing Enclosure cc:

Mr. Richard C. DeYoung, Director (Enclosure) >

Office of Inspection and Enforcement l

U.S. Nuclear Regulatory Comission Washington, D.C.

20555 8302170342 830210 OFFICI AL COPI PDR ADOCK 05000438 5

PDR TG & f An Ecual Oppor%nity Employer

h ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 LIST OF ITEMS TO BE REMOVED FROM 10 CFR 50.55(e) STATUS NCR No.

BLRD No.

OIE No.

Title CEB 79-3 N/A 438/79-01-02 Piping Embedded in Structural 439/79-01-02 Concrete 1005 N/A 438/79-13-03 Water in Rock Anchor Tendons 439/79-13-03 ELNBLP8004 N/A 438/81-25-29 Air Handling Units in Communica-439/81-25-29 tion Room BLNCEB8104 50-438/81-49 438/81-20-05 Lock Off Pressure on Post-439/81-20-05 tensioning System BLNBLP8129 50-438/82-01 438/81-33-06 Incorrect Design Temperature 50-439/82-01 439/81-33-06 for RB Cooler Valves BLNBLP8127 50-438/81-75 438/81-33-04 Overpressure Protection in the 50-439/81-74 439/81-33-04 Decay Heat Removal System BLNEEB8201 50-438/82-17 438/82-06-06 Improper Use of Circuit Breakers 50-439/82-16 439/82-06-06 to Shed Non-IE Loads e

e e

e M