Monthly Operating Rept for Nov 1982
ML20070D757
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 12/09/1982
From: Burger F
VERMONT YANKEE NUCLEAR POWER CORP.
To:
Shared Package
ML20070D756 List:
References
NUDOCS 8212150176
Download: ML20070D757 (6)


Text

.

VERMONT YANKEE NUCLEAR POWER STATION MONTiiLY STATISTICAL REPORT 82-11 FOR Tile MONTil 0F NOVEMBER, 1982 f

a t

I I

l 8212150176 821209 PDR ADOCK 05000271 R

pop i

I OPERAT7NG DATA REPORT DOCKET NO.

50-271 DATE 821209 COMPLETED BY F.J. Burger TELEPHONE (802) 257-7711 Ext. 136 OPERATING STATUS

1. Unit Name:

Vermont Yankee

2. Reporting Period:

November

3. Licensed Thermal Power (We):

1593

4. Nameplate Rating (Gross We):

540

5. Design Electrical Rating (Net We): 514(oc) 504(cc)
6. Maximum Dependable Capacity (Gross MWe):

535

7. Maximum Dependable Capacity (Net We):

504

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:

N/A

9. Power Level to Which Restricted,If Any(Net MWe):

N/A N/A

10. Reasons For Restrictions, If Any:

This Month Tr-to-Date Cumulative

11. Hours In Reporting Period 720.00 8016.00
12. Number Of Hours Reactor Was Critical 720.00 7720.84 79 7on oo
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line 720.00 7664.50 70.675.69
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MWH) 1,132,033.00 11,973,181.50 101,888.942.00
17. Gross Electrical Energy Generated (MWH) 386,048.00 3,997,455.00 33,869,426.00
18. Net Electrical Energy Generated (MWH) 369,985.00 3,798,459.00 32,114,745.00
19. Unit Service Factor 100.00 95.62 79.09 100.00 95.62 79.09
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net) 101.96 94.02 71.31
22. Unit Capacity Factor (Using DER Net) 99.97 92.19 69.99
23. Unit Forced Outage Rate 0.00 3.20 6.49
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

An eight week refueling outage is scheduled to start March 5, 1983.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY I

COMMERCIAL OPERATION

1 AVERAGE DAILY UNIT POWER LEVEL 50-271 DOCKET NO.

UNIT Vermont Yankee DATE 821209 f

COMPLETED BY F. J. Burger TELEPHONE (802) 257-7711 Ext. 136 MONTH November DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1.

519 17.

520 2.

519 18.

520 3.

519 19.

520 4

519 20.

520 5.

519 21.

470 6.

487 22.

520 7.

520 23.

520 8.

520 24.

520 9.

520 25.

521 4

10.

520 26.

521 524 2 7.,

520 11.

520 28.

-470 12.

13.

521 29, 521 14, 521 30.

522 15.

466 31.

16.

520 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-271 UNIT NAME Vermont Yanki.a DATE 821209 REPORT MONTil November COMPLETED BY F. J. Burger TELEPilONE (802) 257-7711 Ext. I36 I

~

H cm v w%

u ause & Conective 00 "a dO License

@c No.

Date c

Action to E.

NS E

3UN Event u4 84 t

h N

$b d.5 $

Report #

EO

$" O 4

M em m

g i

g U

O 82-19 821115 S

N/A B

4,(powe N/A RB CONROD Power reduction for control rod pattern reduction adjustment and turbine surveillance, 82-20 821121 S

N/A B

4 (powe r N/A RB CONROD Power reduction for control rod and reduction turbine generator surveillance.

82-21 l 821128 S

N/A -

B 4 (Power reduction N/A RB CONROD Power reduction for control rod pattern adjustment and turbine surveillance.

F: Forced Reason:

Method:

Exhibit C-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)

(NUREG 0161)

E-Operator Training & License Examination 5

F-Administrative Exhibit I - Same Source G-Operational Error (Explain) li-Other (Explain) 7/80

=... - _

DOCKET NO.

50-271 UNIT Vermont Yankee DATE 821209 COMPLETED BY F. J. Burger TELEP110NE (802) 257-7711 Ext. 136 SAFETY RELATED MAINTENANCE NATURE OF MALFUNCTION ER OR OUTAGE EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION UPS-1A, Logic Power Supply Corrective N/A Unknown Control Battery Replaced Logic Power MR 82-1348 Discharge Alarm Supply (UPS-1A Operatior al)

UPS-1A, Bus ACB Corrective N/A Improper ACB ACB Would Not Correctly Installed MR 82-1356 Installation Close (UPS-1A ACB Following on Fbint. tie)

Maintenance MSIV, V2-86A, Test Switch Corrective N/A Failed Parts Valve Would Not Replaced Switch MR 82-1363 Test Contact Plate Main Steam Line liigh Corrective N/A Failed Parts Relay Tripped Replaced Coil and Radiation Relay 16A-K7C MR 82-1372 Contact Plate Test Valve for ItPCI Corrective N/A Worn Parts Valve Very liard Replaced Valve PS23-68C MR 82-1376 to Operate RCIC Valve V13-32 Power Preventive N/A Improper Conduit and Rerouted Conduit and Conduit and Air Tubing MR 82-1419 Installation rubing Too Tubing Close To Steam Lines RCIC Relief Valve, V13-26, Corrective N/A Wear / Corrosion Jalve Stuck Rebuilt Valve For The RCIC Skid Lube Oil MR 82-1432

@ pen (RCIC Cooler Water Supply 3perational)

I T

t DOCKET NO.

50-271 UNIT Vermont Yankee DATE 821209 COMPLETED BY F. J. Burger TELEPHONE (802) 257-7711 Ext. 136 REPORT MONTH November

SUMMARY

OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at98.69% of rated thermal power for the month.

Gross electrical generation was 386,048 MWH, or 99.29%of design electrical capacity.

Operating Summary The following is a chronological description of plant operations including other pertinent itema of interest for the month:

At the beginning of the reporting period the plant was operating at 99.8% of rated thermal power.

821115 At 0015 hrs. a power reduction was initiated for a control rod pattern adjustment and turbine surveillance.

821115 At 0230 hrs a return to full power started.

821121 At 0030 hrs. a power reduction was initiated for a control rod and turbine generator surveillance.

821121 At 0105 hrs. a return to full power was started.

821128 At 0030 hrs. a power reduction was initiated for a control rod pattern adjustment and turbine surveillance.

821128 At 0140 hrs, a return to full power was started.

i At the end of the reporting period the plant was generating at 99.9% of rated thermal power.

.