ML20070B627
| ML20070B627 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 01/25/1991 |
| From: | Stols R COMMONWEALTH EDISON CO. |
| To: | Murley T Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20070B630 | List: |
| References | |
| NUDOCS 9102010089 | |
| Download: ML20070B627 (3) | |
Text
- _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _
Comi.1onwealth Edison
,n r 1400 Opus Place v
f eners Grove, Mnots 00515
\\
January 25, 1991 Dr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attn:
Document Control Desk
Subject:
Quad Cities Nuclear Power Station Units 1 and 2 Supplement to Application for Amendment to facility Operating Licenses DPR-29 and DPR-30 Appendix A, Technical Specifications tiRC.fotLe1JiosJ0-25Amidl0-155
Reference:
R. Stols t'
'.E. Murley letter dated May 25, 1989 Dr, Murley:
The reference letter transmitted a proposed amendment to Appendix A, Technical Specifications to facility Operating Licenses DPR-29 and DPR-30, The proposed amendment revises the requirements associated with the High Pressure Coolant injection (HPCI) and Reactor Core Isolatton Cooling (RCIC)
Systems.
Through discussions with the NRR Project Manager for Quad Cities Station, it was determined that an additional surveillance requirement should be added to the proposed amendment.
The new surveillance requires the venting of the HPCI and RCIC systems discharge piping at a frequency of once per mnth to prevent water hammer in the systems.
This surveillance requirement consistent with the Standard Technical Specification.
Attachment A provides a summary of the changes to the Technical Specification and Attachment B provides a copy of the marked-up changes.
The additional change is within the scope of the No Significant Hazards Consideration Evaluation, which was provided in the referenced letter.
The proposed amendment has been reviewed and approved by Commonwealth Edison's On-site and Off-site Reviews in accordance with Company procedures.
9102010089 910125 PDR ADOCK 05000254 P
PDR t
n,w
(.
dr.T.E.Hurley January 25, 1991 Commonwealth Edison is notifying the State of Illinois of the supplement to the referenced application by transmitting a npy of this letter and its attachments to the designated State officials.
Very truly yours, i
R. Stols Nuclear Licensing Administrator Attachments: A)
Summary of Changes B)
Marked-up Technical Specification : ages cc:
A.B. Davis, Administrator - Region III L.N. 01shan, Project Manager - NRR T. Taylor, Senior Resident Inspector Illinois Department of Nuclear Safety RS:Imw ZNLD702/111
b AUACHMENLA
SUMMARY
Of CHANGES Page 3.5/4.5-10 (DPR-29) 3.5/4.5-7 (DPR-30)
Specification 4.5.G.1 should now read:
"Every month, the LPCI Hode of RHR, core spray ECCS, HPCI and RCIC discharge piping shall be vented from the high point and water flow observed."
EHI M 02 /112
_