, . _

OPERATING DATA REPORT l

DOCKET NO 50-369 DATE June 15. 1994 OPERATING STATUS COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346

1. Unit Nase: McGuire 1
2. Reporting Period: flay 1,1994-May 31,1994
3. Licensed Thereal Power (MWt): 3411
4. Naseplate Rating (Gross MWe): 1305+ Notes +Naseplate Rating
5. Design Electrical Rating (Net MWe): 1180 (Bross MWel calculated as
6. Maxisus Dependable Capacity (Bross MWe): 1171 1450.000 MA v .90 power
7. Marisue Dependable Capacity (Net NWe h 1129 fatter per Page iii,
8. If Changes Occur in Capacity Ratings (! tens Nueber 3 Through 7) Since Last NUEES-0020.

Report. Give Reasons:

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason For Restrictions, if any:

l l

l This Month Yr.-to-Date Cutulative l

l l 11. Hours in Reporting Period 744.0 3623.0 109559.0

12. Nusber Of Hours Reactor Was Critical 730.3 2823.1 76B43.6 i 13. Reactor Reserve Shutdown Hours --0-- --0-- --0-- l
14. Hours Generator On-Line 727.2 2817.0 76036.5
15. Unit Reserve Shutdown Hours --0-- --0-- --0-- )
16. Sross Thermal Energy Generated (MWH) 2454102 9411982 236136818
17. Gross Electrical Energy Generated (MWH1 836094 3231573 81193728
18. Net Electrical Energy Generated (MWH) 803347 3093170 77527320
19. Unit Service Factor 97.7 77.8 69.4
20. Unit Availability factor 97.7 77.8 69.4
21. Unit Capacity Factor (Using MDC Net) 95.6 75.6 61.6
22. Unit Capacity factor (Using DER Net) 91.5 72.3 60.0
23. Unit Forced Dutage Rate 2.3 22.3. 14.6
24. Shutdown Schedules Over Next 6 Months (Type, Date, and Duration of Each):

Refueling - August 19, 1994 - 62 days

25. If Shut Down At End Of Repert Period. Estiented Date of Startup:
26. Units In Test Status (Prior to Coseercial Operation): Forecast Achieved INITIAL CRITICAL!iY INITIAL ELECTRICITY COMMERCIAL OPERATION I

I I 9406210363 940615 PDR ADOCK 05000369 R PDR

_ , _ _ ..,,. . . _ . _.~. _ _ - _ _

~

CFERATING DATA REFORT DOCKET NO 50-369 UNIT McGuire 1 DATE June 15,1994 l COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 MONTH May, 1994

[Al AVERAGE DAILY F0WER LEVEL t_A1 AVERAGE DAILY F0WER LEVEL (MWe-Net) (MWe-Net) 1 1128 17  !!09 2  !!20 18 1108 3 1121 19 1108

[

4 1119 20 1108 5 1123 21 1109 6  !!26 22  !!Il 7  !!29 23 1111 1 0  !!25 24  !!!3 l

7 1123 25 _ 1115 _

l ,

10 1124 26 1120 l

11  !!20 27 1113 12 634 28 1109

l. 13 466 29 1114 l

14 1114 I 30 1112 l

15  !!20 31  !!O7 16 1114 I

. -_ _ _ ..___-.-._...__.-...,-.._..~.___.........--.--....-m--. -

- ... - ~ .-,- .---

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 UNIT NAME nw uix1, 1 DATE u6/13/94 REPORT MONTH May 1994 COMPLETED BY x. A. w1LL1And -

TELEPHONE (/ug)-auz-oa46 (1) 2) g_ (4) (5)

E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO ~

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 2 94- 5-12 F 16.83 A 3 EE INSTRU REACTOR / TURBINE TRIP DUE TO MAIN POWER CONTROL RELAY TRIP SIGNAL -

3-P 94- 5-13 S --

B --

HG XXXXXX SECONDARY CHEMISTRY 4-P 94- 5-13 S --

B --

IA INSTRU CALIBRATION OF NUCLEAR INSTRUMENTATION SYSTEM 5-P 94- 5-13 S --

B --

IA INSTRU CALIBRATION OF NUCLEAR INSTRUMENTATION SYSTEM (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory Restriction , ,

4-Other (Explain) File (NUREG-0161))

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)

j

\l DOCKET: 50-369 1

UNIT: McGuire 1 Date: 06/15/94 1

I NARRATIVE

SUMMARY

J MONIH: May 1994 l McGuire Unit 1 began the month of May operating at 100% full power. On 05/12/94 at 1353 the unit experienced a reactor / turbine trip due to main power control relay trip signal. 'Ihe turbine / generator was placed on-line 05/13/94 at 0643. 'Ihe unit held at 27% power on 05/13/94 from 0854 to 0907 due to secondary chemistry. During 1 power escalation, the unit held from 1153 to 1304 and from 1636 to 1655 for j calibration of nuclear instnmentation system. The unit returned to full power on ,

05/14/94 at 0214 and operated at or near 100% full power the remainder of the month. l 1

l i

1 l

.d Prepared by: R. A. Williams Telephone: (704)-382-5346

I MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: McGuire. Unit 1
2. Scheduled next refueling shutdown: August 1994
3. Scheduled restart following refueling: October 1994 l THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 i THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

l i l

4. Will refueling or resumption of operation thereafter require a '

technical specification change or other licence amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? i l

S. Scheduled date(s) for submitting proposed licensing action and l supporting information. I

6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 193 l (b) in the spent fuel pool: 583
3. Present licensed fuel pool capacity: 1463 l Size of requested or planned increase: ---

l

9. Projected date of last refueling which can be accommodated by '

present licensed capacity: March 2006 DUKE POWER COMPANY DATE: June 15, 1994 l Name of

Contact:

R. A. Williams Phone: (704)-382-5346 i

t j-l f CPERATING DATA FEPCRT l

I DOCFET NO 50-370 l DATE June 15c 1994

! OPERATING STATUS COMPLETED BY R.A. Williams TELEPHONE 704-382-5346

1. Unit Nase: McSuite 2 1 2. Reporting Period: May 1, 1994-May 31, 1994 i
3. Licensed Thereal Power (MWt): 3411 i 4. Naseplate Rating (Gross MWe): 1305* Notes
  • Nameplate Rating
5. Design Electrical Rating lNet MWe): 1180 (Gross MWe) calculated as 1
6. Maxisue Dependable Capacity (Bross NWe):  !!71 1450.000 MVA x .90 power

, 7. Marlaus Dependable Capacity (Net MWe): 1129 factor per Page 111,

8. If Changes Occur in Capacity Ratings (! tees Nusber 3 Through 7) Since Last NUREG-0020.

Report. Give Reasonst

9. Power Level To Which Restricted, If Any (Net MWelt
10. Reason For Restrictions, if any:

This Month Yr.-to-Date Cueulative

!!. Hours in Reporting Period 744.0 3623.0 89855.0

12. Number Of Hou:s Reactor Was Critical 744.0 3480.4 69322.4
13. Reactar Reserve Shutdown Hot:rs --0-- --0-- --0--
14. Hours Generator On-Line 744.0 3478.1 68354.3
15. Unit Reserve Shutdown Hours --0-- --0-- --0--
16. Gross Thersal Energy Generated (MWH) 2529621  !!811762 223693749
17. Gross Electrical Energy Generated (MWH) 879304 4136927 78185962
18. Net Electrical Energy Generated (MWH) 846240 3986192 74952312
19. Unit Service factor 100.0 96.0 76.1
20. Unit Availability Factor 100.0 96.0 76.1
21. Unit Capacity Factor (Using MDC Net) 100.8 97.5 73.0
22. Unit Capacity Factor (Using DER Net) 96.4 93.2 70.7
23. Unit Forced Outage Rate 0.0 4.0 7.0
24. Shutdewn Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refuelinz - November 24. 1994 - 65 days

25. If Shut Down At End Of Report Period. Estiaated Date of Startup:
26. Units In Test Status (Prior to Cossercial Operationi: Forecast Achieved INITIAL CRiilCALITY INiilALELECTRICITY COMMERCIAL OPERAil0N

__ ~ . - _ _ _ _ ~ . , _ - , - . - . , .- _ _ ,. -.._ -- _

- _ . . . _ . _ - . _ - _ . ~ . . _ . _ _._.__ _ __

OPERATING EATA RE?0RT DOCKET NO 50-370 LtNIT McGuire 2 DATE June 15. 1994 COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 fiONTH Mn.1994 EQ AVERAGEDAILYFOWERLEVEL [A1 AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1147 17 1136 i

2 1139 18 1134 l 3 1139 19 1133 4 1133 _

20 1082 5 1142 21 1133 6 1145 22  !!35 7 1149 23 _

!!36 i

8 1145 24 1137 9  !!43 25 1138 10 1144 26 1140 l

11  !!42 27 113/

12 1142 28 1132 13 1139 29 1137 14 1142 30 1137 15 1144 31 1135 16  !!40

4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 -

UNIT NAME ricaulut. z

> DATE ve/13/94 REPORT MONTH May 1994 COMPLETED BY x. a. w1LLlaris TELEPHONE t/us)-auz-3346 (1) (2 (3) (4) (5)

A)

E MEi-HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO '

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S .

(2) (3) (4)

(1)_

F Forced Reason

  • Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Report H.ER D-Regulatory Restrictiory E-Operator Training & License Examination 4-Other (Explain) File (NUREG-0161))

F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)

DOCKET: 50-370 UNIT: McGuire 2 Date: 06/15/94 l

4 ,

NARRATIVE

SUMMARY

I 1

, l Mormi: May 1994 J l McGuire Unit 2 began the month of May operating at 100% full power. The unit 1 operated at or near 100% full power for the entire month.

l l

i 1

t I

4 Prepared by: R. A. Williams Telephone: (704)-382-5346

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: McGuire. Unit 2
2. Scheduled next refueling shutdown: November 1994 l
3. Scheduled restart following refueling: January 1995 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

l

4. Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment? ,

l If yes, what will these be? l If no, has reload design and core configuration been reviewed by Safet;r Review Committee regarding unreviewed-safety questions?

l S. Scheduled date(s) for submitting proposed licensing action and supporting information.

6. Important licensing considerations (new or different design or l supplier, unreviewed design or performance analysis methods, I significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 817 ,

l

8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: ---
9. Projected date of last refueling which can be accommodated by present licensed capacity: December 2003 DUKE POWER COMPANY DATE: June 15, 1994 Name of

Contact:

R. A. Williams Phone: (704)-382-5346