Corrected TS Page 3/4 3-13,reflecting Deletion of Steam/Fw Flow Mismatch
ML20069J977
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/09/1994
From:
SOUTHERN NUCLEAR OPERATING CO.
To:
Shared Package
ML20069J971 List:
References
NUDOCS 9406150200
Download: ML20069J977 (1)


Text

.

TABLE 4.3-1 (Continued)

REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REOUIREMENTS

  • CHANNEL MODES IN WHICH ,

y CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE o FUNTIONAL UNIT CHECK CALIBRATION TEST REOUIRED n ~

'TT4< 13. Steam Generator Water S R Q 1, 2 l

@$ Level--Low-Low 3G l 14. Steam /Feedwater Flow S P Q 1, 2 l Coo Mismatch and Low Steam OS Generator Water Level

  • XO om 15. Undervoltage -_ Reactor N.A. R Q l l gg Coolant Pumps 1 om

. y$$ 16. Underfrequency - Reactor N.A. R Q l l x& Coolant Pumps 4

17. Turbine Trip A. Low Auto Stop Oil Pressure N.A R S/U ( 9 ) (10 ) N.A.

B. Turbine Throttle Valve N.A R S/U(9)(10) N.A.

w Closure s

, 18. Safety Injection Input from ESF N.A. N.A. R(4) 1, 2 l w

w

19. Reactor Coolant Pump Breaker N.A. N.A. R 1 Position Trip
20. Reactor Trip System Interlocks N.A. R S/U(8) 1
21. Reactor Trip Breaker N.A. N.A. M (5 ) (14 ) (15) , 1, 2, S /U (1) (14 ) (15 ) 3*, 4*, 5*
22. Automatic Trip Logic N.A. N.A. M(5) 1, 2,

$ 3*, 4*, 5*

E g 23. Reactor Trip Bypass Breaker N.A. N.A. (13),R(11) 1, 2, p 3*, 4*, 5*

-4

  • g Deletion of this functional trip shall be implemented prior to o

startup from refueling outage 12.