Southern Nuclear Operarng Company
,,k Post Cnce Box 1295 B;rmingham. A:abama 35201 Te;ephone (205) 868-5131 L
Southern Nudear Operating Company o,
umy
$iefe$
the southem e'ectnc system June 9,1994 10 CFR 50.90 Docket No.: 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Joseph M. Farley Nuclear Plant Unit 2 Amendment No. 99 Technical Specifications Page Correction Ladies and Gentlemen:
Amendment Nos.104 and 97 to the Farley Unit I and Unit 2 Technical Specifications were issued December 29,1994. These amendments changed the Technical Specifications to allow elimination of the steam /feedwater flow mismatch reactor trip (Table 4.3-1, Functional Unit No.14). The amendments were to be implemented upon completion of necessary design modifications following each unit's next refueling outage. Subsequently, Amendment Nos.106 and 99 (Units 1 and 2, respectively,) were issued May 16,1994.
These Technical Specifications amendments changed the surveillance test intervals and allowed outage times for the Reactor Trip System and Engineered Safety Features Actuation System which afTected Table 4.3-1. At the time Amendment Nos.106 and 99 were issued, the plant modification to eliminate the steam /feedwater flow mismatch reactor trip had been completed on Unit 1, but had not been completed for Unit 2. (The Unit 2 modification is scheduled for the spring 1995 refueling outage.) Due to the timing of the design change modifications and the issuance of the two amendments for each unit, Page 3/4 3-13 must be corrected to reflect deletion of the steam /feedwater flow mismatch on Amendment Nos.106 and 99. The updated page for the Unit 2 Technical j
Specifications is attached to this letter. The updated Unit I page was provided by i
Southern Nuclear to the NRC by letter dated June 3,1994.
The updated page provided with this letter is purely an editorial change not subject to 10 CFR 50.90 since Unit 2 Amendment Nos. 97 and 99 have both been approved under this process.
a/
9406150197 940609 i
PDR ADOCK 05000364 I
p PDR
U. S. Nuclear Regulatory Commission Page 2 If you have any questions, please advise.