|
---|
Category:CONSTRUCTION PERMITS-APPLICATION & AMENDMENTS TO APP
MONTHYEARML19310A2391980-05-22022 May 1980 Amend 64 to CPPR-83 & CPPR-84 Updating Electrical Schematics, Vols 1-3.Schematic Drawings Available in Central Files Only ML20028D9841976-07-0101 July 1976 Application to Amend CPPR-83 & CPPR-84,extending Time for Const Completion Until 780801 & 790801,respectively,due to Increased Delivery Time of Matls & Components ML20028D9821975-12-30030 December 1975 Application to Amend CPPR-83 & CPPR-84,extending Time for Const Completion to 760201 & 0301,respectively,due to Increased Delivery Time of Matls & Components ML20069G1381975-12-22022 December 1975 Amend 27 to Application for Licenses for McGuire Nuclear Station,Under Construction Per Construction Permits CPPR-83 & CPPR-84.Purpose of Amend to Revise ER-OLS to Provide Listed Info ML20069G1701975-06-23023 June 1975 Amend 22 to Application for Licenses for McGuire Nuclear Station,Under Construction Per Construction Permits CPPR-83 & CPPR-84.Purpose of Amend Listed ML20069G1771975-03-0707 March 1975 Amend 19 to Application for Licenses for McGuire Nuclear Station,Under Construction Per Construction Permits CPPR-83 & CPPR-84 ML20069G7601974-08-15015 August 1974 Amend 17 to Application for Licenses for McGuire Nuclear Station,Under Construction Per Construction Permits CPPR-83 & CPPR-84.Amend 17 Responds to 740520 a Giambusso Ltr 1980-05-22
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217F3431999-10-15015 October 1999 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,to Change TS Re Requirements for Insp of RCP flywheels.Marked-up & Reprinted Ts,Encl ML20216E6531999-09-13013 September 1999 Application for Amends to Licenses NPF-9 & NPF-17,revising TS Making Permanent One Time Only Changes Incorporated Into TS 3.7.9,allowing Up to 24 Hours to Restore Control Room Pressure Boundary to Operable Status.With marked-up TS ML20211G6631999-08-27027 August 1999 Application for Amend to License NPF-9,revising Tech Specs 3.1.4, Rod Group Alignment Limits ML20196H7471999-06-24024 June 1999 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,revising TS 2.0, Safety Limits, TS 3.3.1, Reactor Trip Sys Instrumentation & TS 3.4.1, RCS Pressure,Temp & Flow Departure from Nucleate Boiling (DNB) Limits ML20195F2871999-06-10010 June 1999 Application for Amends to Licenses NPF-9 & NPF-17, Facilitating one-time Addition of Condition G & Administrative Controls Note to TS 3.7.9, Cravs ML20206M9251999-05-0606 May 1999 Supplement to LARs & 1022,for Amends to Licenses NPF-9,NPF-17,NPF-52,respectively & NPF-62,revising List of Ref Documents Contained in TS 5.6.5b Re COLR Requirements ML20206B0691999-04-0606 April 1999 Application for Amends to Licenses NPF-9 & NPF-17,expanding Allowable Values for Interlocks P-6 (Intermediate Range Neutron Flux) & P-10 (Power Range Neutron Flux) in TS 3.3.1, Table 3.3.1-1,Function 16 ML20205L2091999-04-0505 April 1999 Application for Amends to Licenses NPF-9 & NPF-17,changing TS to Provide Revised SFP Storage Configurations,Revised SFP Storage Criteria & Revised Fuel Enrichment & Burnup Requirements.Analysis & Tss,Encl ML20237B6161998-08-14014 August 1998 Application for Amends to Licenses NPF-9,NPF-17,NPF-52 & NPF-52,revising TS Related to Ice Condenser Ice Bed ML20247E3831998-05-0808 May 1998 Application for Amends to Licenses NPF-9 & NPF-17,revising Power Range Neutron Flux High Trip Setpoints in Event of Inoperable MSSVs & Deleting References to 3-loop Operation in Current TS 3.7.1.1(b) & Table 3.7-2 ML20217N9181998-03-0303 March 1998 Application for Amends to Licenses NPF-9 & NPF-17,locating New Meteorological Tower to Be Installed at Plant ML20197G4261997-12-17017 December 1997 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,respectively,ref Updated or Recently Approved Methodologies Used to Calculate cycle-specific Limits Contained in COLR ML20217H5451997-10-13013 October 1997 Application for Amends to Licenses NPF-9 & NPF-17,requesting Replacement of Three Safety Related Narrow Range Refueling Water Storage Tank Level Instruments W/Three Safety Related Wide Range Level Instruments ML20212A2421997-10-0606 October 1997 Application for Amends to Licenses NPF-9 & NPF-17,deleting All References to Steam Line Low Pressure Safety Injection Function ML20148F4691997-05-27027 May 1997 Application for Amends to Licenses NPF-9 & NPF-17,converting Current TS to Be Consistent W/Improved Std Ts,Per NUREG-1431 ML20133D3901997-01-0606 January 1997 Application for Amends to Licenses NPF-9 & NPF-17,requesting Rev to Allow Operation of Containment Purge Ventilation Sys During Modes 3 & 4 During Startup from Steam Generator Replacement Outage ML20135B0191996-11-26026 November 1996 Application for Amends to Licenses NPF-9 & NPF-17,requesting Change to TS 3.8.2 Re DC Sources ML20134M1461996-11-0101 November 1996 Application for Amends to Exigent Licenses NPF-9 & NPF-17, Allowing Use of Low Specific Gravity Cells in Vital 125 Volt Dc Sys When Desired ML20129F7461996-10-22022 October 1996 Application for Amends to Licenses NPF-9 & NPF-17,requesting to Allow Continued Unit Operation at Elevated Containment Lower Compartment Temps for Period Not to Exceed 72 Cumulative Hours ML20113C7061996-06-21021 June 1996 Application for Amends to Licenses NPF-9,NPF-17,NPF-35, NPF-52,revising Term Lifting Loads Used in Manipulator Crane TS 3.9.6b.2 to Lifting Force. in Addition Redefining Auxiliary Hoist Min Capacities ML20100Q3111996-03-0404 March 1996 Application for Amends to Licenses NPF-9 & NPF-17,deleting Seismic Qualification Requirement for Containment Atmosphere Particulate Radiation Monitors ML20100R4511996-03-0404 March 1996 Application for Amends to Licenses NPF-9 & NPF-17,deleting Flow Monitoring Sys from TS 3.4.6.1 & Associated SRs ML20095E9261995-12-14014 December 1995 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,revising TS for DGs by Incorporating Guidance & Recommendations in NUREG-1366,GL 93-05,GL 94-01 & NUREG-1431 ML20095E8031995-12-12012 December 1995 Application for Amend to Licenses NPF-9 & NPF-17,making McGuire Afd Limit Equations Identical to Previously Approved by NRC for Catawba Nuclear Station ML20098A4461995-09-18018 September 1995 Supplemental Application for Amend to License NPF-35, Revising Table 2.2-1, Reactor Trip Sys Instrumentation Trip Setpoints ML20092K4381995-09-18018 September 1995 Application for Amends to Licenses NPF-9 & NPF-17,revising Table 2.2-1, Reactor Trip Sys Instrumentation Trip Setpoints ML20092B1371995-09-0101 September 1995 Application for Amends to Licenses NPF-9 & NPF-17,revising TS 3/4.6.5 to Reduce Require Ice Weight in Containment Ice Condenser of Each Unit from 2,099,790 Lbs to 1,516,800 Lbs ML20082M7921995-04-12012 April 1995 Application for Amends to Licenses NPF-35,NPF-52,NPF-9 & NPF-17,respectively to Relocate Requirements for Turbine Overspeed Protection Instrumentation from TS to Selected Licensee Commitment Manual ML20082B3871995-03-29029 March 1995 Application for Amends to Licenses NPF-9 & NPF-17 Re Heat Up & Cool Down Curves LTOP ML20078E4731995-01-18018 January 1995 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,respectively.Amends Relocate Requirements for Seismic Instrumentation,Meteorological Instrumentation & loose-part Detection Sys from TS to SLC Manual for Station ML20080F7901995-01-18018 January 1995 Application for Amends to Licenses NPF-9 & NPF-17 to TS Re Amends That Allow Analog Channel Operational Test Interval for Radiation Monitoring Instrumentation to Be Increased from Monthly to Quarterly ML20080C7371994-12-0707 December 1994 Application for Amends to Licenses NPF-9 & NPF-17,revising TS Table 3.3-6 Action Statment Re Control Room Air Intake at Times When Radiation Monitors (EMF-43A & 43B) Inoperable ML20076M6881994-11-0202 November 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,deleting App B,Environ Protection Plan & Modifying Portion of License Condition 2.C.(2) So as to Delete Portion Which Refers to Environ Protection Plan ML20073L0711994-10-0404 October 1994 Application for Amends to Licenses NPF-9 & NPF-17,correcting Technical Deficiency Existing in TS Caused Difficulty to Plant Operations Re Number of Centrifugal Charging Pumps in Modes 4,5 & 6 ML20073J8981994-09-30030 September 1994 Application for Amends to Licenses NPF-9 & NPF-17,proposing Rev Related to Replacment of Steam Generators ML20073H2811994-09-28028 September 1994 Application for Amends to Licenses NPF-9 & NPF-17,updating Loss of Power Functional Unit of ESFAS Instrumentation TS Tables 3.3-3,3.3-4,3.3-5 & 4.3-2 ML20073E9071994-09-15015 September 1994 Application for Amends to Licenses NPF-9 & NPF-17,revising TS Bases 3/4.9.2, Refueling Operations;Instrumentation, Allowing Use of Newly Installed Wide Range Neutron Flux Monitors ML20072Q8171994-08-25025 August 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,increasing AFW Pump & Sys Testing Interval from Monthly to Quarterly & Adopting Clarification Note from Revised STS for Westinghouse Plants,Per NUREG-1366 ML20070H5781994-07-18018 July 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,separating TS Into Two (2) Vols for Each Station ML20070F3341994-07-13013 July 1994 Application for Amends to Licenses NPF-35,NPF-52,NPF-9 & NPF-17,revising TS 4.6.2d,by Increasing Surveillance Interval of Containment Spray Sys Header Air or Smoke Test from Five to Ten Years ML20069Q4021994-06-13013 June 1994 Application for Amends to Licenses NPF-9 & NPF-17,proposing Ts,By Increasing Initial Fuel Enrichment Limit from Current Maximum of 4.0 Weight % to 4.75 Weight % & Establish New Loading Patterns for New & Irradiated Fuel in SPF ML20069D1971994-05-24024 May 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,proposing Changes to TS by Relocating Specific Boron Concentration Values to Core Operating Limits Rept ML20065B4241994-03-25025 March 1994 Application to Amend to Licenses NPF-9 & NPF-17,requesting Revision of TS 3/4.7.13 Re Description of Groundwater Monitors ML20064C9171994-02-25025 February 1994 Application for Amends to Licenses NPF-9 & NPF-17,adding Four Instruments to TS 3.3.3.6 Tables 3.3-10 & 4.3-7 as Part of Accident Monitoring Instrumentation (Ami) & Deleting Five Instruments from Subj Tables That Are Not Part of Ami ML20059G6911994-01-10010 January 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,revising TS 4.2.5.3 to Change Method for Measuring RCS Flow Rate During 18-month Surveillance ML20058A5451993-11-11011 November 1993 Application for Amends to Licenses NPF-9 & NPF-17,proposing Changes by Revising Certain Surveillance Requirements for ECCS Subsystems ML20059H6811993-11-0404 November 1993 Application for Amends to Licenses NPF-9 & NPF-17,changing One Time Allowed Outage Time Extension for Train of Control Area Ventilation Sys in Order to Facilitate Maint on Sys Needed to Improve Sys Reliability ML20059C3841993-10-25025 October 1993 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,changing TS to Reduce Required Min Measured RCS Flow from 385,000 Gpm to 382,000 Gpm,Per Std B&W TS Presented in NUREG-1430 ML20057A0351993-08-26026 August 1993 Amends 138 & 120 to Licenses NPF-9 & NPF-17,respectively, Revising Boron Concentration Limits within Refueling Water Storage Tank ML20056F1021993-08-0909 August 1993 Corrected Amends 135 and 117 to Licenses NPF-9 & NPF-17, Respectively 1999-09-13
[Table view] |
Text
{{#Wiki_filter:- - - - - - - - _ _ _ _ _ _ _
,1 . , ,
S 5 Yf "$fL
,'i, l.I R E OW E R COhil'sWY 4 ' '
,p
. . . . -m l'OW l'lf )ll' j l t)lMI
/
422 bo1*111 Clll'HCil fit H ) li,CilAlilOTl1:, N. C en2.PJ /
Tr L t t .4ce.t ; A s<r 4 7C4 Wit t.l At4 O. f % D s' E R . J M 3 7 3 4 0 b ')
%ct P8 L L Of 's1 Li t Ase 6 'F * 's a c1 O+a June 23, 1975 : : - . ~, ; ~; ,.
p.f. p*7:
. , ; .1 .
\
< g . ~-
//( ' f y'\
r)' ,
'/..' ., .Q.~ . . .,s s 1 gb/ Oky! ',
Mr. Benard C. Rusche, Director ! ,
- s. <.
Df fice of t!uclear Reactor Regulat ion '. 1 +,l U. S. !!uclear Regulatory Cocmission
\' #. ^' '
Vashington, D. C. 20555 , ,
t o. s .
u -
l'"- l' - r
t ' + i = 4. < / o ' ;
x D' 3' Re: McG ui r e N ..
Units 1 raid 2 Docket Mos. 50-369, 50-370
Dear Mr. Rusche:
No. 22 to itc Application Dukc Po'..::r Company is filir.g herewi th tendoentwhich is under construction for Liccnses for the l'cGuire Nuclear Station, This filing includes puiruant to Construction Permits CPFP43 2nd 44.
andment wi th 't he follcaing altarn-thre< signed original copics of the c:
( ments:
- 1. Revised generdi inforretion requi red by 10 Cf n 50.33 e
for McGui re !!ucitar
- 2. Revision 5 to th'c Final Safety T.nalysis Report Station.
w A'
3 Revision h to t he Envi ronm2nt al Report--Operat i ng License Stage for
< McGuirc Huclear Station.
i ?
Ls filing air.o includcs'25 additio:ml conforr;d copies of 1bc amendment the Final wi t h all at t achn:ots , an additional h5 copies of he"isicn 5 to Safety Analynit R ;nrt, an coditional 172 copiertuo of sets Revision of oversized 4 to the flow Environmental Report--Grerating License Stage, C. OcYcun:'a letter of April lh, 19/5 and diagrarn rcquestc! by Mr. R report, "T he 1.oue r Cat a>. bri six copies of the environ antal study progren Lakes; Characterization of Phyto-and 7eaplankton Cor:aunities H. Regan's and Their Reintionships to Environe:ntal factors," requested by Mr. W. ,
letter of Februaiy 10, 1975 ,
The purpose of Ar ndmant 20 is the folio.ing:
16 ko eV be heINia n of!Urit oII bI ] ns i1y buhm k t Cd Ni kh AYndNnt e
Parker, Jr as thc respr.nsi ble coI porate designate Mr. Villiam O. duly not hor ized of ficer for ik Cui t e Nut l e a r S t a
officer to whom all coa;.unications concerning the application should
; be sent.
O 9406090238 751222 DR ADOCK 05000369
[ N b 2*"E[ \
PDR
Mr. Benard C. Rusche Page 2 June 23, 1975 '
2.
mation O
6, 1975. attached to Mr. D. B. Vassallo's letters of April 2 n or-May ,
1975 and 3
Revise the ER-OLS to submit nation, item Nos. responses to requests for additional infor-of Apri l 3, 1975 and i t em i:os.105 and 106, attached to Mr. W. H. Regan, Jr.'s lette k
Regan, Jr. 's letter of June 5,1975.107 through 112 attached to Mr. W. H.
As requi red by Sect ion 2.101 of the Commiss ion's regula tions 11:i3 Amendment 22 is being served on Mr. , a copy of of Mecklenburg County, North Carolina, the county in which located. ty is the faciliGlenn Re pect. fully submitted, -
,0-u. s O / ru Ja W i l l i a m O. Pa r ke r , J r.l) .
of Duke roaer Company,UlLLIAM that he 0. PARVsER, JR.,cebeing duly sworn, states t President sign and file with the Nuclear Regulatory Commission this Amendm
~
its arplicat mat;4rs set ion and documents appended thereto; and that all o statements and '
forth therc~n are true and correct to the bestge.of his knowled
,. at ,__ d ru u N. -
William O. Farker, Jr., Vice President ~
ATTEST:
h l/' , , )
f
. ][,1t ., (',k ,, ) ,
~ <
Lewis F. Camp, Assistant Secretary Subscribed and sworn to before me this 23rd day of June , 1975
_ _/ ffY ~*
Notary ablic J! W&
(/., lQ UJ q) {
} My Commission Expires:
fl,y d 2f (97/ ~
a
, . . Y gg 3 41/76/76 ,f ~& 1 f, ,' "_[in Duxu Pown Co>muy W
]
vowcu neswwo .
~ V'Q j
- y. m .' ace Sorrn Cucuen Srneri. Gr:Anwm:. N. C. ena.in p V. g -:
Wit L.t A,4 O, PA R s( C R. .m.
, [
%C g. P5 ts ptist Tnts woe.t. Ant A 7Cd I
~
sit Ah8 PD9D#1 CJ'8 373 8003
.i June 23, 1975 1 c
.g@.I Sw
'*^
f.\ 3 ' t p r.y% l,
, M ,Wh %r / . C ~
. / ., g D :
Mr. Benard C. Rusche, Director -{ k,' ,,,
r 9N
- Office of !!uclear Reactor Regulation l .
}{.;} '4 ,gy~
O. S. !!uclear Regulatory Comnission .
L, j Vashington, D. C. 20555 \' e ..
, 'v.
. nN .1 . ;
Re: McGui re t'"- D
U.h(/]}7 N p9 Units 1 and 2 , .. l Docket tios. 50-369, 50-370 % s' l
Dear Mr. Rusche:
A
. Duke Power Company is filing herewith Amendment t!o. 22 to its. Application- !
N ..N for Licenses for the McGuire Huclear station, which is under construction !
pursuant to Construction Perrai ts LPPn-83 cod -Et. Thi filing includes ;
three signed original coples of the amendment with 'the following attach-
) ments': .
p- 1. Revised generdi information requi red by 10 CFR 50.33 [,
- 2. Revision 5 to th'e Final Safety Analysis. Report for McGuire !!aclear Statlon.
j It ? . . l 3 Revision h to the Environmental Report--Operating License stage for ;
- 1. McGuire Nuclear Station. _j This filing also includes'25 additional conformed copics of _the amentfm:nt i
.with all attachments, an additional 45 copics of Revision 5~to'the. Final j i . Safety Analysis Report, an additional 172 copics of Rev.ision 4 to the j p Environmental Report- Operating License Stage, two sets of oversized flow ,
d diagrams rcquested by Mr. R. C. DeYcung's letter of April 14, 1975 and <
h' six copies of the environmental study program report , "The. Lower Catawba l T - Lakes; Characterization of Phyto-and Zonplankton Communitics and Their 'j Reintionships to Environmental factors," requested by Mr. W. H. Regan's
~
l letter of February 10, 1975 a
'f ')
LThe purpose of Amendment 20 is the following:
~
- 1. I;cvise general informa tion or iginally subraitted wi th Amendment 16 to .
-. designate Mr. Willia:a 0. Parker, Jr. as the responsible corporate 1
'j
(>- -
Lof ficer for'McGuire Nuclear Stat ion and as the ' duly authorized officer to whom all communications concerning the application should- :j i be sent. .
9406090238 75122 G3C2P4 !
gon Aoocn o g ,2 36 , g .
i Mr. Benard C. Rusche
O
- 2. Revise the FSAR to include responses to requests for additional infor-mation attached to Mr. D. B. Vassallo's letters of April 2, 1975 and .
May 6, 1975 3 Revise the ER-OLS to submit responses to requests for additional infor-mation, i t em Nos. 105 and 106, attached to M,r. W. H. Regan, Jr.'s letter of April ~i, 1975 and item Nos. 107 through 112 attached to Mr. W. H.
Regan, Jr. 's letter of June 5,1975 As requi red b / Section 2.101 of the Commission's regulations, a copy of thir, Amendment 22 is being served on Mr. Glenn C. Blaisdell, County Manager of Meck1coburg County, North Carolina, the county in which the facility is located.
Rc,pectfully sub.. tted, -
b-v . J_ /_h / u. J4 William O. ' Parker, Jr.
D-WILLIAM 0. PARKER, JR., being duly sworn, states that he is Vice President of Duke Poaer Company, that he is authorized on the part of said Comp:ny to .
A sign and file with the Nuclear Regulatory Commission this Amendment 22 to its ajrplication and documents appended thereto; and that all statements and 7' matters set forth there'n are truc and correct to the best of his knowledge. ;
/
t j ta u_ 0 c Lut il ~
William O. Farker, Jr.,Viccjresident ATTEST:
g/ ~ ,
7 -,
h -, fu;~) .- .
Lewis F. Camp, Assistant Secretary
~
Subscribed and sworn to before me this 23rd day of June, 1975 (Y ^
NYW merypoc uny 3 y My Commission Expires: D i .
w ~
g g (9,,,
~-}}