ML20069G138

From kanterella
Jump to navigation Jump to search
Amend 27 to Application for Licenses for McGuire Nuclear Station,Under Construction Per Construction Permits CPPR-83 & CPPR-84.Purpose of Amend to Revise ER-OLS to Provide Listed Info
ML20069G138
Person / Time
Site: McGuire, Mcguire  
Issue date: 12/22/1975
From: Parker W
DUKE POWER CO.
To: Rusche B
Office of Nuclear Reactor Regulation
Shared Package
ML20069G141 List:
References
NUDOCS 9406090232
Download: ML20069G138 (2)


Text

'.

['

w; 3.,

.g y,

m..

---"~-x.-

,,m

.y

[

eq,,%&'pML.,w

~~~~

i,[ *

-U'"

k l

' Dunr POWER COMPANY

^%

y Powitte Busimwo 4e2 Sourn Cucucn STurt.T. CuruwrTi:, N. C. aca

/

y-- ' # ; WILLIAM O. PARM CfL J R.

bCCember 22,.1575

,~l,'

g;

~f

- v.cc Putsiot=1 Trtemons: Anta 704 Stra Peooutvion 373-4083 F

j$

Mr. Benard C. Rusche, Director y

f.

Office of Nuclear Reactor Regulation f/

[,

l t

q bL J i i !,, fi \\-

U. S. Nuclear Regulatory Commission Washington, D.~C.

20555 s DE0291975 > b Re:

McGulre' Nuclear Station C5 *gy3;;;pm b m *.

G Units 1 and 2

'c

[i y

Docket Nos. 50-369, 50-370 g

~

Dear Mr. Rusche:

W

- Duke Power Company is filing herewith Amendment No. 27 to its Application for Licenses for'tha McGuire Nuclear Station, which is under construction pursuant to Constr iction Permits CPPR-83 and -84 This filing includes three signed original copies of the amendment with attachment entitled Revision 5 to the Environmental Report - Operating License Stage for

'McGuire Nuclear Station. This filing also includes 25. conformed copies b'

"of-the amendment cnd an additional 172 c6ples of Revision 5 to the.Envi-y ronmental Report.-

VR,g

.The purpose of Amendment 27 is to revise the ER-OLS to provide the K

following information:

4 (V

.1.-

Revised load forecasts for the Duke servi e area and the VACAR sub-

.reDion of the Southeastern Electric Reliabil.ity Council.

~

5~

2.. Location and structural details for thc discharge point for the' I

Lie Conventional Waste Water Treatment' System as requested in the

(

Draf t Envi ronmental Sta'tement.

3 Revised thermal analyses to evaluate the effect of,the operation of McGuire on Lake Norman. This material is submitted in lieu of

~

the detailed contingency plan requested in thc Draft Environmental Statement.

t

4. 'REvlsed information concerning the proposed preoperational and postoperational environmental monitoring: programs.

F

5. Hiscellaneous revisions ' to the. ER-OLS.

i 5

As required by Section 2.101 of the Commission's regulations, a copy of

,, I, this Amendment 27 is being served on Mr. Glenn'C..Blaisdell, County

)

Manager of Mecklenburg County, North Carolina, the county in which the facil t'y 1s" located

R /g$

]

R pectfully submit.ed,

[.

\\

1 n

C 6 L, w,.,,.

14311

}bioyud f ac*o"c9 Q 2a

. William 0. Parker, Jr.

369 A

-