ML20065T516

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1981.Narrative Summary Encl
ML20065T516
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 01/01/1982
From: Auterino L
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20065T507 List:
References
NUDOCS 8211020555
Download: ML20065T516 (6)


Text

.

OPERATLNG DATA REPORT

~

DOCKET NO. 50-286 DATE 1-1-82 COMPLETED BY L. Auterino -

TELEPHONE (914) 739--8200 OPERATING STATUS

~-

Notes

1. Unit Name: Indian Dnine Nn.1 Nnn1 ,,,. vno,e p13.,e December 1981
2. Reporting Period:
3. Licensed Thermal Power (MWt): inM
4. Nameplate Rating (Gross MWe): 1013 ,
5. Design Electrical Rating (Net MWe): 965 .
6. Maximum Dependable Capacity (Gross MWe): 926
7. Maximum Dependable Capacity (Net MWe): 891
8. If Changes Oc. ur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To which Restricted. If Any (Net MWe):
10. Reasons For Restrictions. lf Any:

This Month Yr..to.Date Cumulative 744 8,760 '46.801

11. H:urs In Reporting Period - ,

704.9 5,356.2 32,106.2

12. Number Of Hours Reactor Was Critical '
13. Reactor Reserve Shutdown Hours 0 0 ' #

69n o 5,240.6 30,443.7

14. Heurs Generator On.Line 0 0 0
15. Unit Reserve Shutdown Hours 1,960,672 11,396,292 79,027,562
16. Grass Thermal Energy Generated (MWH) 586,230 3,204,630 24.796,131
17. Gr:ss Electrical Energy Generated (MWH) 562,144 3,033,247 23,747.407
18. Nat Electrical Energy Generated (MWH)
19. Unit Service Factor 92.9 59.8 66.1
20. Unit Availability Factor 92.9 59.R 66.1 R4.8 38.9 56.9
21. Unit Capacity Factor (Using MDC Net) 78.3 35.9 52, d.
22. Unit Capacity Factor (Using DER Net) __
23. Unit Forced Outage Rate 7.1 36.9 15.0
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1: .

Pefnelina outace - March 19R2

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operationi: Forecast Ac'hieve'd '

INITIA L CRITICALLTY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIA L OPER ATION N/A -

N/A t

8211020555 ggg,,5 gnj77)

DRADOCK050aoggg PDR -

AVI:It AGl: D AILY UNil I^0Wl:lt 1.EVEL DOCKET NO. Sn-78r.

Indi.ut Point UNIT No.3 DATE 1-1-82 COh!PLETED BY L. Autorino_

TELEPilONE 914-739-8200 A!ONTil D cmb r DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (b1We Net) (AfWe-NetJ

~ ~

0 37 m 3

102 33 833

. 2

'26 39 838 3 -

752 20 836 4 _

828 21 837 5

825 22 83' 6

825 23 836 7

g . 812 24 836 809 25 916 9

827 26 837 10 829 27 837 11 830 R35 12 ,

, 28 830 29 835 13 830 30 839 34 830 837 IS 33 16 830 INS 1110CTIONS On this format. list the average daily unit power levelin blWe-Net for caeh day in the repurting month. Compute 10 the nearest whole megawatt.

.s 1

(9/77) l

. l

s DOCKET NO. 50-286 UNIT SilVTDOWNS AND POWER REDUCTIONS UNIT NAME Indian Point No . 3 -

DATE l-1-81 -

COMPLETED IlY L. _ Auterino REPORT MONTII December 1981 TELEril0NE 914-739-8200 c

, .E E };; } Y ~4 Licensee E.,

, gvt' Cause & Currective No. Date g 3g yy5 Event g'g o-8 o

Action to H

$E 5 j ;f, g Repori # in u Pievent Recurrence ,

c5 11 81-11-23 F 38.7 A 3 CB MOTORX Unit trip on loss of loop flow when

  1. 31 reactor coolant pump tripped.

Electrical fault in motor stator was found. Replaced stator and commenced start up.

12 81-12-03 F 11.4 A 3 HB INSTRU Unit trip when 31 Main Steam Generator S Isolation valve indicated not fully open. Readjusted limit switch'.

13 81-12-03 F 3.0 G 3 Cil INSTRU Unit trip during load escalation with generator at 40 MWe. Tripped on #31 steam generator high level while man-ually controlling feedwater during low level reactor power escalation.

Commenced startup.

I 2 3 4 F: Forced Reason: Metimd: lixhibit F. instructions S: Scheduled A lirluipment Failure (Explain) l Manual Inr Preparation of Data B Maintenance of Test 2-Manual Scram. , linley Sheets fin I.icensee C-Refueling 3 Automatic Scram. livent Report (LliR) File INURI:G-D Regulatory Restriction 4 Other (Explain) 0161) li-Operator Training A License lixamination F-Administrative -

5 G Operational lie ror (Explain) Exhibit 11- Same Source 07/77) Il-Other (Explain)

D I

h O t I g n T n 1 o C i 8 M A b 9 u 1 E t r V l I

e T . i b C o m E g e R d c R e n e g i D O a k C m c a a d p d d e e c c a a l l p p e e R R l e

s a

C k

n i

t a O r k I C a T e T C n l R 3 i O t g P

U e n G E r i I u k I

A s c E M s a C e p 6 i r l

A p e

! v

! l i E i s T O s i

t e l w c A o x M L E Y

L l

i T

i f

O M p m

u P

T 1 p r E m e M u t P P a I g W

U n e Q i c E g i r v a r h e C S 1 5 3 3 N /

. d 5 3 5 5 R. 4 4 W 2 2 I I E 1 1 T 8 8 A - -

D 3 3 2 2

n o

i t

c A

e i

v t

c e

r h r t o 1 n C 8 o 9 M 1

r e

b m

e c

e D

n o

i t

c n

T u R f O l P a E M R

I Y

? R O

G E .

T s A

C C

I Y

L t li n T e 1

! m O p H i u

q .I (E

T R

O

  1. P E

R R. O W T E

I 0

3 /

1 e

t a

D

SUMMARY

OF OPERATING EXPERIENCE Indian Point Unit 3 was synchronized to the bus for a tota'l of 690.9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> producing a gross generation of 586,230 MWe for this reporting period. Upon completion of reactor coolant pump motor repairs, the unit was returned to service at 1444 hours0.0167 days <br />0.401 hours <br />0.00239 weeks <br />5.49442e-4 months <br /> on December 2.

On December 3 at 0228 hours0.00264 days <br />0.0633 hours <br />3.769841e-4 weeks <br />8.6754e-5 months <br /> the plant experienced a turbine trip resulting from the indicated closure of No. 31 Main Steam Isolation Valve. The signal was generated when the limit switch indicated the valve was not fully open. The limit switch arm was realigned and adjustments were made to preclude reoccurrence.

The unit was returned to service at 1350 hours0.0156 days <br />0.375 hours <br />0.00223 weeks <br />5.13675e-4 months <br />.

At 1353 hours0.0157 days <br />0.376 hours <br />0.00224 weeks <br />5.148165e-4 months <br /> on December 3 the unit experienced a trip on high steam generator level in No. 31 steam generator. The trip occured during low power level escalation while manually controlling steam generator levels. The trip was attributed to operator difficulty.in mantaining steam generator levels in manual while escalating from low power levels. The operators commenced plant startup and returned the unit to service at 1652 hours0.0191 days <br />0.459 hours <br />0.00273 weeks <br />6.28586e-4 months <br /> that same day.

4

- - - - , , . . _ - - . -r, _ , - - --..

_ . _ . . - .- - - . _ . - . _ , . .- -