ML20065K844
| ML20065K844 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 11/28/1990 |
| From: | GEORGIA POWER CO. |
| To: | |
| Shared Package | |
| ML20065K841 | List: |
| References | |
| NUDOCS 9012050004 | |
| Download: ML20065K844 (2) | |
Text
_
'm.
ENCLOSURE 3 V0GTLE ELECTRIC GENERATING PLANT REQUEST TO REVISE TECHNICAL SPECIFICATION 3.4.6.1 INSTRUCTIONS FOR INCORPORATIQ!f The proposed change to the Vogtle Unit I and Unit 2 Technical Specifications would be. incorporated as follows:
Remove Paae Insert Paae 3/4 4-19 3/4 4-19 i
l l
E3-1 9012050004 90112e l-PDR ADOCK 05000424 P
+,
3/4.4.6 REACTOR COOLANT SYSTEM LEAKAGE LEAKAGE DETECTION SYSTEMS I
LIMITING CONDI~ ION FOR OPERATION 4
3.4.6.1 The following Reactor Coolant System Leakage Detection Sys'tems shall be OPERABLE:-
Y The Containment Atmosphere Gaseous or Particulate Radioactivity a.
Monitoring System,-
E b.
The Containment Normal. Sumps Level and Reactor Cavity Sump Level, and c
?
c.
Either the containment air cooler condensate flow rate or a 1
Containment Atmosphere Gaseous or Particulate Radioactivity Monitoring System not taken credit for in 3.4.6.la.
APPLICABILITY:
MODES 1, 2, 3, and 4.
4
' ACTION:
j l0.With only two of the,above required Leakage Detection Systems OPERABLE,_
-operation may continue for up to 30 days provided grab samples of the contain-
- ment atmosphere are obtained and analyzed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when the 4
required Gaseous'or Particulate Radioactive Monitoring System is inoperable-otherwise, be in at least HOT STANDBY within the mxt 6. hours and in COLD
-SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
Y. ---+
W
'1 SURVEILLANCE REQUIREMENTS.
\\
y
'i-
- 4.4.6._1M The Leakage Detection Srstems shall be desion arated W ERABLE by
f ContainmentLAtmosphereGaseousandParticulateMonitoringSystems-a..
c
- performance of CHANNEL; CHECK,. CHANNEL CALIBRATION, and ANALOG CHANNEL OPERATIONAL iEST at the frequencies
- specified in Table 4.3-3,.
g t
'b.
Containmer'. Normal Sumps Level and. Reactor Cavity Sump Level per-
[
formance of CHANhEL CALIBRATION at leastionce per 23 months, and k
Containment Air Cooler Condensate Mari'.oring Syste.a performance of c.
!l:
t CHANNEL CALIBRATION at least once per 18 months, i
(EWi+h \\ess %n +4 of ne. above reku;<ed Lea kcme. De+ee.+ron 10PeRA B L6, be. in M Icost HOT 5T M D By kli% M fhe. ne et 6 61ws LL 7
andjn ' COLD. S HUTor wu wi+hin Me. Fo llowig s o hours, y,
A V0GTLE-UNITS l 1 & 2 3/4 4-19 m'
?
- _,. g _
y
,.y
+' _,,,
_