Commonwrith Ediso[ " *O' '
Braldwood Nuctritt Powir St: tion -
l I=
Rout) 01, Box 84 V
Braceville, Illinois 60407 '.
'e Telephone 815/458-2801 --
n September 10 fl990-BW/90-0911 s
Director,.0ffice-of Resource Management.
United: States Nuclear Regulatory Commission
~"
Hashington, D'.C.
20555-ATTN: Document Con'.
1 Desk-Gentlemen:
' Enclosed for your information51s the Monthly Performance
. Report covering Braidwood Nuclear' Power Station,for'the period August I through August 31, 1990.-
Very truly yours.
K..L.-
f n'
Station sc9 aer-Braidwood Nucie d Ct: tion-KLK/EHC/sjs-(4957z)
Attachments-cc:
A. B. Davis, NRC..Regi.on III.
NRC Resident Inspector Braidwood
~
Ill. Dept..of Nuclear Safety:-
M. J. Hallace.
K. L. Graesser T. J. Kovach>
' Nuclear Fuel Services, PHR Plant Support INPO Records Center Performance Monitoring Group, Tech Staff Braidwood Station Nuclear Group Tech Staff Braidwood Station-m S. Sands - USNRC S. C.'Hunsader D.R. Eggett-Nuclear Engineering'. Department-1 d.' q
- i s.
1 9011140144 900910
~m
' \\\\;\\
EDR ADOCK05000456[if M
..\\
M PNU a
n
j
(
L L
BRAIDHOOD NUCLEAR POWER STATION'
[
UNIT 1 AND UNIT 2
-MONTHLY PERFORMANCE. REPORT-COMMONWEALTH EDISON COMPANY.-
NRC DOCKET.NO. 050-456,l LICENSE NO. NPF-72~
NRC DOCKET NO. 050-457,. LICENSE NO.:NPF-77f a
v 4
I
)
4
[
1 i-
- i
, -., +
I.
Monthly Report for Braidwoo'd-Unit.1 A.-
. Summarv of Ooeratina Exoeriengt Braidwood Unit 1 entered the month at approximately 95%'
reactor power.. The unit'. entered a forced: outage on
. August 3, 1990 to. repair al failed Essential Service Hater::
discharge check valve.
The unit..was returned to service-on. August 14, 1990 and continued; power operation through>
the end of the month.-
(4957z/3) q
]
7.
q i
B.
OPERATING DATA REPORT
' DOCKET NO.: 50-456-UNIT:
Braidwood?1-DATE: 09/10/90.
COMPILED BY:
K.~H. Dundek TELEPHONE:-- (815)458-2801 ext. 2480 OPERATING STATUS i
-l 1.
Reporting Period: ' August, 1990
' Gross Hours:
744-2.
Currently Authorized Power Level (HHt):
3411 Design Electrical Rating (HHe-gross):
1175 Design Electrical-Rating (HHe-net):
1120-Max Dependable Capacity (HHe-gross):
1175
.l Hax Dependable Capacity (HHe-net):
1120 3.
Power level' to which restricted (If An'y):= None 4.
Reasons for restriction (If Any):- None-
)
THIS MONTH--YR TO DATE CUMULATIVE-1 If 5.
Report period Hours:
744 5831~
18320-6.
Hours Reactor' Critical:
486 5525.9' 14623.1-~
j 7.
RX Reserve Shutdown Hours:
0.0 0.0-0.0 j
8.
Hours Generator on Line:
477.4' 5496-6'
'14346'2 9.'
Unit Reserve Shutdown. Hours:-
0.0 -
0.D
-0.0 10.
Gross Thermal Energy (HHH):-
1452506'
-17499770-42302978' 11.
Gross Elec. Energy (HHH):
y_494902 6059856'
'14539923' 12.
Net Elec. Energy (HHH):
471073 5829901'
-13887072 13.
Reactor Service-Factor:
65.3
' 9 4.' 8 -
-79.8 14.
Reactor Availability Factor:-
65.3 94.0 79.8 15.
Unit Service Factor:
64:2-94.3-78.3 16.
Unit Availability Factor:
64.2-
'94.3 7 8 ' 3 --
17.
Unit' Capacity Factor _(HDC net):
56.5 89.3-67.7 18.
Unit Capacity Factor (DER net):
56.5 89.3 67.7 19.
Unit Forced Outage Rate:-
35.8
~ 5.7 5 ^. 5 20.-
Unit Forced Outage Hours:
266.6 334.4 834.7-4 21.
Shutdowns Scheduled Over Next 6 Honths: None
^
22.
If Shutdown at End -of Report Period, Estimated Date of Startup:
r (4957z/4)
-}
t
- e I
t}
7 t
~
- C.
AVERAGE DAILY UNIT NET POWER LEVEt, LQG DOCKET NO.:
50-456:
[
UNIT::._Braidwood 1; DATE: 09/10/90:
COMPILED' BY::. K. M. Dundek TELEPHONE:
(815)458-2801-S
. ext. 2480l MONTH: August, 1990_
1
-i
' 17. <
-1085'
~l
- 1..
-1049-2 <.
949 l'8.-
~1061' l
r 3.
8 19, 1109 q
- 4. 20.
1112
-[
- 5. 21:. :
110$'-
- (
q
- 6. 22.
1034 J
7.
- 14
'23.
1033 8.
- 14 24.<
'1024-
.i h
9.
- 14 25, 847 10.
- 14
- 26. '
- 967-..
'i 11.
- 14 27.
1093 12.
- 15 228.m 1109-i 13.
- 15 29..
1103 J
14.
147 30'.
1052 3
15.
788
- 31..
1038 16.
1051 INSTRUCTIONS On this form list the average daily. unit power level-in MHe-Net'for each
'i
. day-in the reporting' month.
Compute;to the nearest whole megawatt.
These figures will-be usedLto plot:a-graph 'for each reporting month.
l Note that when. maximum dependable capacity 1s-used.for.the net electrical rating of the unit there:may be~ occasions when the daily average power; level exceeds the.100% line (or-the restricted power level.line). -In such cases the' average daily unit power output sheet should be footnoted to explain the apparent anomaly.
L 1
E
~(4957z/5) n.
D.
UNIT SHUTDOHNS/ REDUCTIONS DOCKET NO.: 50-456 UNIT: Braidwood 1 DATE: 09/10/90 COMPILED BY: K. M. Dundek.
TELEPHONE: (815)458-2801 ext. 2480 REPORT PERIOD: August, 1990 No DATE TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION T0. PREVENT RECURRENCE 3
900803 F 266.6 A
1 90-011 BI ISV Failure of IA ' essential service water discharge check valve. Valve was repaired and/or replaced in part.
SUMMARY
-TYPE
-REASON METH00 SYSTEM & COMPONENT
~F-Forced..
A-Equipment Failure Maint.or Test.
1 - Manual Exhibit F & H-LS-Scheduled-
'B-Maint or Test 2 - Manual Scram
-Instructions for Preparatien of.
C-Refueling 3 - Auto Scram Data Entry Sheet D-Regulatory-Restriction-4 - Continued Licensee Event Report '
E-Operator Training & License Examination 5 - Reduced Load (LER) File (NOREG-0161)
F-Administration 9 - Other
-G-Oper Error H-Other (4957z/6) l-
,a
,z a
[...
E.
-UNIOUE REPORTING REOUIREMENTS - Unit 1
- 1..
Safety / Relief valve operations.
VALVES NO &~ TYPE PLANT
--DESCRIPTION QA_If ACTUATED ACTUATION CONDITION OF EVENT None 2.
.Licenseefgenerated changes 'to 00CM.-
None r-s-
' (4957z/7)
~ _ _
__. _.. i.._,., cza 5
.u
, ___~
. _ ~ _,.
...__......a__:.,..__
-F.
LICENSEE' EVENT REPORTS'- UNIT 1E The following is a tabular summary'ofla11f LicenseeLEvent Reports submitted during the reporting period. August 1cthrough August 31, 1990b This information is provided pursuant to the reportable occurrence" reporting requirements as set forth in-10 CFR.50.73.
Licensee Event Report Agport Number' Qaig
' Title of Occurrence-90-010 08-08-90
.Containm'entVentilationsignal?and L.C.0. 3.0.3: entry from de-energizing 4KV.ESF; bus-to rack
-out failed breaker.90-011 08-31-90
. Unit shutdown-due:to failed
> discharge check valve on~the 1Al essential-service water-pump.:
90-012 08-31-90'
,18 safety. injection accumulator, lA.and IB residuaitheat removal-
. pumps declared: inoperable due to a small, weld crack in a 3/4 inch test-line.
a (4957z/8)-
f-
m 1
a I.:
Monthly, Report for Braidwood Unit 2
. =
A.-
l Summary of Ooeratina Exoerience Braidwood Unit 2 operated ' routinely'in August with noi outages or significant power reductions.:
1
'l '
s 1 -
g
-;1 t
t i.
.t 9
f l.-
t
- l
- l i
l L
l t
l
' l i
- t 1.
r
..{
t 1!
o
. i 1
t L
(49572/9)
L i
i i(
'['
I i.
o 1
s B.
OPERATING DATA REPORT DOCKET NO.:
50-457 I
UNIT:- Braidwood 2'
.i DATE:
09/10/90 COMPILED BY:
K. M.'Dundek TELEPHONE:
(815)458-2801 ext. 2480 OPERATING STATUS 1.
Reporting Period: August, 1990 Gross Hours: 744 2.
Currently _ Authorized Power Level (MHt):: 3411~
Design Electrical Rating (MWe-gross):
1175 Design Electrical Rating (MHe-net):,
1120' Max Dependable Capacity (MHe-gross):
1175-Max Dependable-Capacity (MHe-net):
1120 i
3.
Power level to which restricted (If Any): _ None; l
4.
Reasons for' restriction (If Any): None THIS MONTH YR TO DATE CUMULATIVE l
5.
Report period Hours:-
744-5831 16402 l
6.
Hours Reactor Critical:-
744~
3975.2 13110.5' 1
7.
RX Reserve Shutdown Hours:
0.0 0.0-0.0 8.
, Hours Generator on Line:-
744 3921.1 12982;2-9.
Unit Reserve' Shutdown Hours:-
0.0 0.0
'0.0 10.
Gross Thermal Energy (MHH):
_2151032 10174372 36015330 11.
Gross Elec. Energy (MHH):
'839646:
'3433658 12325046 12.
Net Elec. Energy (MHH):
806907~
3253652 11746627 13.
Reactor Service Factor:
100
,# l
-79.9-l 14.
Reactor Availability Factor:
100' 6m.2 79.9 15.
Unit Service Factor:
100' 67.3 79.2 16.
Unit Availability Factor:
100 67.3 79.2 17.
Unit Capacity Factor (MDC net):
96.8-
'49i8-63 d '
18.
Unit Capacity Factor (DER' net):'
96.8 49.8 63.9 19.
Unit Forced Outage Rate:
0 3.6
- 4. 5 -
20.
Unit Forced Outage Hours:
0 147.9;
'613;6-21.
Shutdowns Scheduled Over Next 6-Months: None 22.
If Shutdown at End of Report Period, Estimated Date of Startup:
Iy
)
i (4957z/10)
4 c
'C.
AVERAGE DAILY UNIT NET' POWER LEVEL LOG
- DOCKET NOL:
50-457 UNIT:?-Braidwood'2--
i DATE: 09/10/90-COMPILED-BY:- K. M. Dundek:
1 TELEPHONE:: (815)458-2801'<
ext 12480 j
MONTH: August,1990 1.
1120 l17.
1094-2.
1119^
18.
1118 j
3, 1099-19.;
'1107-T m
4.
1114 20.t
~1063 5,
1118
- 21. __
1109' i
t 6.
1120' 22, 1054 7.
-1071~
'23.-
'1053' 8,
1084 24, 1062-9, 1118 25.~
1 1111 10.
1082
.26, 1059-11, 1101 27.
1111 t
Lj 12.
886 28.-
1110' 13.
1042
'29..
1107 i
14.
lill
- 30. -
'1014' 15.
'1113
'31.
10193 16.
1116 INSTRUCTIONS I
On this form list the average daily unit power level:in MHe-Net for each day in the reporting month. Compute to the' nearest whole megawatt.
These figures will be used to plot a' graph forieach reporting month, t
Note that when maximum dependable.-capacity is used for:the ' net electrical-rating of the unit there.may be.: occasions when:the daily average power -
level exceeds the~ 100% line (or the restricted power level line). ;In s such cases the average daily unit power-output sheet shouid be footnoted:
to explain-the apparent anomaly.
I t.
.f l
L
!,(4957z/11 ) -
I j
i-1
~
~
^ D.
UNIT SHUTDOHNS/REDUCT_IANS DOCKET NO.: 50-457 UNIT: Braidwood 2 DATE: 09/10/90 COMPILED BY: K. M. Dundek-TELEPHONE: (815)458-2801 ext. 2480'
. REPORT PERIOD: -August, 1990 No~
DATE TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE None
'eeAAAAAAAAA*eAAAA
SUMMARY
ee***AAAAAAAAAe*A
' TYPE REASON-METH00 SYSTEM & COMPONENT
-F-Forced.
A-Equipment' Failure Maint or Test Manual Exhibit F & H S-Scheduled B-Maint or Test.
2 - Manual Scram Instructions for Preparation of C-Refueling 3 - Auto Scram.
Data Entry Sheet D-Regulatory Restriction 4 - Continued..
Licensee Event Report
't E-Operator Training & License Examination 5 -' Reduced Load (LER) File (NUREG-0161)
F-Administration
~9 - Other G-Oper Error H-Other (4957z/12)
r E.
UNIOUE REPORTING REOUIREMENTS - UNIT 2 1.
Safety / Relief valve operations.
VALVES NO & TYPE PLANT DESCRIPTION-DATE ACTUATED ACTUATION CONDITION OF EVENT.
1 i
None J
2.
Licensee generated changes to 00CM.
-None
..=-
~
~
'fm"
~
.sc-
~
(4957z/13)-
2 L.__m__..
.__.__m._____
_.--.._1.._2.--__-_a_
-- -.~. _ _ _..
+
, yo +
.o - J o
j o-F.
LICENSEE-EVENT REPORTS - UNIT 2:
The following is a tabular summary'of all Licensee Event Reports submitted during the reporting period, August 1 through: August 31, 1990.'-
This information is provided pursuant to the reportable. occurrence l
reporting requirements as set ~forth infl0 CFR 50.73.
'l Licensee Event Report' Report Number--
-QAlt-Title of Occurrence f
90-011 LO8-29-90
-Containment VentilationLisolation.
r signal due to spurious spikingEfrom.
2RE-ARC!2 as a ~ result: of component, it f ai l ure.'.
~
i w
h
- r ii l
E a
l l
6 l
(
- ]
y t a I
i
.a l-
-(49572/14) l f
I Y