ML20064P062
| ML20064P062 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 05/03/1982 |
| From: | Bogart D FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML20064P055 | List: |
| References | |
| NUDOCS 8209130091 | |
| Download: ML20064P062 (1) | |
Text
.
OPER ATING DATA RE' PORT DOCKET NO.
50-302 DATE 5/3/82 CONIPLETED BY D R n c a r_.!
TELEP!IONE (404) 795-6486 OPER ATING STA T US
- 1. Unit Name:
Crystal River Unit #3 Notes 8/19/82 Revised
- 2. Reporting reriod:
4/1/82 - 4/30/82 report to account for
- 3. Licensed f hernul Power blWI):
2544 time change in April
- 4. Nameplate Rating (Gross.sDv j:
890 1982.
Changes are e
asterisked.
- 5. Design Electrical Rating (Net SIWE):
Apq
- 6. Stasimum Dependable Capacity (Gross. twe):
845 s
- 7. Stasimum Dependable Capacity (Net.siwel:
806
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
N/A
- 9. Power Lesel To Which Restricted. If Any (Net.s!We): Approximately 780 MWe (net).
- 10. Reasons For Restrictions. lf Any:
Restricted to 2300 MW thermal due to RC Pump Power Monitors beina bypassed.
Net MWe corresponding to this varies with cycle efficiency.
This alonth Yr.-t o-Da t e Cumulatis e i1. Ilours In Reporting Period 719
- 2879*
44999*
- 12. Number Of liours Reactor Was Critical 689.6*
1992.7*
,_ 27442.09*
- 13. Reactor Resene Shutdown llours 0
3.9 1213.12
- 14. Ilours Generator On-Line 686.3*
1968.9*
26781.08*
- 15. Unit Resene Shutdown liours 0
0 0
- 16. Gross Thermal Energy Generated 01Wil) 1508450 4557538 59924479
- 17. Gross Electrical Energy Generated OlWill 510763 1557872 20357463 1M. Net Electrical Energ) Genuated 01Will 485372 148_3_948 19313246
- 19. Unit Service Factor 95.5%
68.4%
59.5%
- 20. Unit Asailability Factor 95.5%
68.4%
59.5%
- 21. Unit Capacity Factor (Using sIDC Net) 83.8%*
64.0%*
54.8%
- 22. Unit Capacity Factor IUsing l>LR Neo 81.8%*
62.5%
52.0%
- 23. Unit I orced outage Rate 4.5%
31.6%
27.0%
- 24. Shutdowns scheduled Oser Nes 6 sionihs tT pe. Date.and Duraiion of Each):
3 Turbine Maintenance outage scheduled for 5/21/82 to last 4 days.
- 25. If Shut Down At End Of Report Period. Estimated D.uc of Startup:
N/A 26 Units in f est St.uus IPrior Io Connnercial Operationi l orecast Achiesed INill s L t RIIICallI Y 1/14/77 Isirlst I ticinicity 1/30/77 t O\\l\\11 R( ! s t. OPI R T 110N 3/13//7 0209130091 820907 PDR ADOCK 05000302 to/77)
R pyg I
-