ML20064P062

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Apr 1982
ML20064P062
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/03/1982
From: Bogart D
FLORIDA POWER CORP.
To:
Shared Package
ML20064P055 List:
References
NUDOCS 8209130091
Download: ML20064P062 (1)


Text

.

OPER ATING DATA RE' PORT DOCKET NO.

50-302 DATE 5/3/82 CONIPLETED BY D R n c a r_.!

TELEP!IONE (404) 795-6486 OPER ATING STA T US

1. Unit Name:

Crystal River Unit #3 Notes 8/19/82 Revised

2. Reporting reriod:

4/1/82 - 4/30/82 report to account for

3. Licensed f hernul Power blWI):

2544 time change in April

4. Nameplate Rating (Gross.sDv j:

890 1982.

Changes are e

asterisked.

5. Design Electrical Rating (Net SIWE):

Apq

6. Stasimum Dependable Capacity (Gross. twe):

845 s

7. Stasimum Dependable Capacity (Net.siwel:

806

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:

N/A

9. Power Lesel To Which Restricted. If Any (Net.s!We): Approximately 780 MWe (net).
10. Reasons For Restrictions. lf Any:

Restricted to 2300 MW thermal due to RC Pump Power Monitors beina bypassed.

Net MWe corresponding to this varies with cycle efficiency.

This alonth Yr.-t o-Da t e Cumulatis e i1. Ilours In Reporting Period 719

  • 2879*

44999*

12. Number Of liours Reactor Was Critical 689.6*

1992.7*

,_ 27442.09*

13. Reactor Resene Shutdown llours 0

3.9 1213.12

14. Ilours Generator On-Line 686.3*

1968.9*

26781.08*

15. Unit Resene Shutdown liours 0

0 0

16. Gross Thermal Energy Generated 01Wil) 1508450 4557538 59924479
17. Gross Electrical Energy Generated OlWill 510763 1557872 20357463 1M. Net Electrical Energ) Genuated 01Will 485372 148_3_948 19313246
19. Unit Service Factor 95.5%

68.4%

59.5%

20. Unit Asailability Factor 95.5%

68.4%

59.5%

21. Unit Capacity Factor (Using sIDC Net) 83.8%*

64.0%*

54.8%

22. Unit Capacity Factor IUsing l>LR Neo 81.8%*

62.5%

52.0%

23. Unit I orced outage Rate 4.5%

31.6%

27.0%

24. Shutdowns scheduled Oser Nes 6 sionihs tT pe. Date.and Duraiion of Each):

3 Turbine Maintenance outage scheduled for 5/21/82 to last 4 days.

25. If Shut Down At End Of Report Period. Estimated D.uc of Startup:

N/A 26 Units in f est St.uus IPrior Io Connnercial Operationi l orecast Achiesed INill s L t RIIICallI Y 1/14/77 Isirlst I ticinicity 1/30/77 t O\\l\\11 R( ! s t. OPI R T 110N 3/13//7 0209130091 820907 PDR ADOCK 05000302 to/77)

R pyg I

-