ML20064P054

From kanterella
Jump to navigation Jump to search
Forwards Revised Monthly Operating Repts for Apr,May,June & Jul 1982
ML20064P054
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/07/1982
From: Mardis D
FLORIDA POWER CORP.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20064P055 List:
References
3F-0982-3, 3F-982-3, NUDOCS 8209130087
Download: ML20064P054 (1)


Text

-

M Po. w..e. r September 7,1982

  1. 3F-0982-3 File: 3-0-1-c(2)

Mr. Richard C. DeYoung, Director Of fice of Inspection and Enforcement U.S. Nuclear Regulatory Commission A ttn: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 5-302 Operating License No. DPR-72 Monthly Operating Report

Dear Mr. DeYoung:

Attached are twelve (12) copies of the revised first page to the Crystal River Unit 3 Monthly Operating Reports for the months of April, May, June, and July of 1982.

The revision corrects for the loss of one hour during the month of April, due to the change to Daylight Saving Time. There were only 719 hours0.00832 days <br />0.2 hours <br />0.00119 weeks <br />2.735795e-4 months <br /> in April instead of the 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> reported. All revised values for the four reports are due to this one hour deviation and are asterisked in the attached pages.

Very truly yours,

. %/ dhe David G. Mardis Acting Manager Nuclear Licensing WRK:myf h

cc:

Mr. J.P. O'Reilly, Regional Administrator Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 3100 Atlanta, GA 30303 8209130087 820907 PDR ADOCK 05000302 8

PDR R

General Office 320i inirty fourtn street souin. P O Box 14042. st Petersburg. Florida 33733 e 813-866-5151 k