ML20064K802

From kanterella
Jump to navigation Jump to search
Abridged Risk Study During Low Power/Shutdown Operation at Surry
ML20064K802
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/10/1993
From: Jo J, Lin C, Mubayi V
BROOKHAVEN NATIONAL LABORATORY
To:
NRC
Shared Package
ML20064K019 List:
References
RTR-NUREG-1489 NUDOCS 9403230289
Download: ML20064K802 (32)


Text

{{#Wiki_filter:; ,-)e' ,.

                                                                      .                                                        x -

7 - t y >4

                                           . ABRIDGED RISK STUDY DURING LOW POWER / SHUTDOWN OPERATION AT SURRY Ai J. Jo, C. C. Lin, V. Mubayl, L. Neymotin, and S. Nimnual Bmokhaven National Laboratory, Upton, NY 11973
     ,                  1   INTRODUCTION                                                                                           n 1.1    Objectives The Office of Nuclear Regulatory Research at the U. S. Nuclear Regulatory Commission established programs to investigate postulated accidents during low power and shutdown operations at a PWR (Surry) and a BWR (Grand Gulf). One such progam is a risk study of accident progressions and consequences.

The objective of this study was to make a preliminary risk determination of the girogressions (Level L , 2 analysis) and the consequences (Ixvel 3 analysis) of accidents during low power and shutdown operations in the Surry plant (NRC FIN le1680). The study was designed to obtain rt;sults for regulatory decisions that were to be made in the early summer of 1992. .This letter report documents the methods, findings, and implications of the study. . The sister study of the Grand Gulf plant is , reported separately by the staff at Sandia National Laboratories'(SNL) (NRC FIN I-1678). J 1.2 Scope of the Study The abridgal risk analysis took place from January through April 1992. The term abridged means. that simple event trees (abeut nine top event questions) were developed and used with assu~mptions } and other approximate methods to compute rough estimates. The term risk refers to conditional l l consequences (probability of the various events during the accident progressio'n s multiplied by the consequences), given that core damage has occurred. Traditional risk estimates, computed by' multiplying the conditional consequences and the frequency of the sequences leading up to core . damage, could not be made because the frequencies h'ad yet to be determined in companion Level 1. U 9403230289 940309 h9f PDR Glf0g Q O)$f m

.4,

'. and human reliability analysis (HRA) studies. Uncertainty was taken into account in a manner consistent with the detail of the abridged study.

This study investigated the possible accident progressions and the associated consequences of a single plant operating state, mid-loop operation (referred to as POS 6), where the reactor vessel head is ' on and the containment is closed but has no pressure-retaining capability. The sister study at SNL investigated an early stage of a refueling operation. Figure 1.1. shows the scope of both studies. 1.3 Methodology The abridg, ' process of computing the conditional consequences is shown in Figure 1.2. In general, both this study and that done at SNL follow this scheme; some differences in the details of the procedures are noted at the end of Section 1.3. The process used here is an abbreviated form of the NUREG 1150 study.' Accident Progression The calculations began with the assumption that core damage has occurred, making the consequences conditional. Given core damage, the reasonable accident progressions were delineated with the accident progression event tree (APET). Much of the delineation, particularly for the timing of key evenu, is based on deterministic calculations with a code used to compute source terms, such as MELCOR.2 The likelihood of the various accident progressions is reflected vis-a-vis branch point probabilitics. In large-scale risk studies, the assignment of such probabilities can be made by a formal process of obtaining information from groups of experts (see Section 2.7 of the NUREG 1150 report, Vol. l'). Ilere, because of resource limitations, most assignments were made by the contractor staff. Thus, the probabilities are not as rigorous as they could be; this is one of several limitations of the study. This lack of rigor was partially offset by repeating the calculations with other reasonable input values; together, these repeated calculations constitute an uncertainty analysis. Through the uncertainty analysis, distributions, instead of point values, were assigned to the branch points. The distributions are subjective, but account for many possible values of the branch points. Point values were selected from the distributions with a form of Monte Carlo sampling known as Latin Ilypercube Sampling (LIIS).' After making sets of inputs, each set is assigned to the branch e f' points and multiplied through to the ends of the APET. The calculations were repeated using the sets of inputs to build a probability distribution at the end of each pathway. Source Terms llaving delineated accident progressions with the APLT, the source terms of the progressions were calculated with a parametrie code.' The code is a mimie of the detailed source-term codes;it is a collection of simpic mass-balance equations, activated by the identifier representing the characteristics of the progression. The parametric code determines source terms from, the characteristics of the accident progression pathways through the APlil' and other inputs (typically various fractions, such as the inventory leaving the reactor vessel, involved in a core-concrete interaction, entering the containment, and so on). Although these other variables are imprecisely known, many reasonable values can be assigned to the inputs. As in the APET calculations, distributions are assigned to the variables and sampled with LIIS to form many sets ofinput values for repeated calculations. The result is a distribution of source terms for each accident progression pathway. An internal " Source Term Advisory Group," including W. T. Pratt and II. P. Nourbakhsh of BNL, and J. Kelly and D. Powers of SNL, was formed to support this study. The results of the accident progression and source term analysis were discussed with the group at two meetings during this - analysis. Consequences Two sets of consequence measures were determined; an on. site dose rate (within the site boundary and designated as a parkint Iot dose rate), and off. site consequences, including early fatalities, population dose, and latent cancers.

  • The parkine lot dose rate was computed using a recent model by Ramsdell" and a combination of the older Wilson" and Regulatory Guide 1.145 models."

o Off-site consequences were computed using the MACCS code.' 1 1 To compute consequences, a few source terms were randomly selected from the distributions of source terms generated with repeated use of the parametric source term code. Uncertainty was not  ; propagated through the consequences as it was through the APET and the source term calculations. Conditional Risks Conditional risk was computed for each accident progression pathway by multiplying the consequences by their associated accident probability determined with APET. The products of the pathways were summed. This process was repeated for each Monte Carlo sample of the source terms. Then, high, medium, and low results were reported. In the NUREG-1150 study,' high, medium and low results are represented by the 95 percentile, median and 5 percentile values of the distribution of the results. However,in this study, the number of samples taken was not sufficient enough to define them statistically. Therefore, they were referred to as high, medium and low results. They would approach the statistical 95,50 or 5 percentiles, if sufficient numbers of samples were taken. Differences This study differs slightly from its sister program at SNL in three ways. (1) Two hundred samples of uncertainty distributions were taken for source terms compared to one hundred at SNL (2) Nineteen samples from the source term distribution were used in consequence calculations and traced back through the APET for the probabilities needed to compute conditional risk,. whereas the SNL study used twelve samples. (3) Dose rates inside the containment or the reactor building were not calculated because the releases were assumed to take place through the equipment hatch directly to the outside. At Grand Gulf, the release path is through the reactor building, so the in-building dose rates were computed. 4

m I 1.4 Lhnitations nnd Strengths of the Study The study had limitations and strengths which are important to understand within the context of the calculations. Limitations

  • The subject of the study is one POS, mid-loop operation. This POS was selected because it was identified in a preliminary Level 1 study, known as a coarse screening analysis (NRC FIN I 1344),' as having the potential to occur at a relatively high frequency. Also, the POS had characteristics (e.g., reduced inventory) ofinterest to the staff in the NRC's Office of Nuclear Reactor Regulation.
  • The abridged study is based on the coarse screening analysis where accident sequences potentially having high frequencies,were identified. The consequences of these sequences were determined in the Level 2 and 3 abridged study reported here. Frequency was not incorporated into the I.evel 2 and 3 calculations to determine risk because the frequency estimate was only an approximation.
  • The simple APET, having only nine top event questions, accounts for a limited number of factors. This compares to about seventy questions in a large-scale PRA such as the NUREG.

1150 study.

  • The on-site dose estimates stem from simple equations, yielding rough estimates, e Variables were selected and assigned distributions for the uncert.inty analysis by only the contractor staff.
  • Because of gaps in knowledge of the plant configuration and operator actions, assumptions i .

, were necessary. which are documented in the following sections. Some gaps will be filled later with more rigorous determinations with results from detailed Level 1 and HRA studies and during a follow-up Level 2 and 3 study. 1

Strengths . a

  • Even with the limitations noted above, the abridged study is a systematic evaluation of severe

( , accident progressions, accounting for at least some uncertainty.

  • The source term analysis was reviewed by an internal advisory group.
  • The contractor staff and the NRC project staff believe that the APET represents the occurrence of key events during accident progressions.
  • The relationship and timings of accident progression events and factors were determined to at least a first approximation.
  • Estimates of both on-site and off-site conditioaal consequences were made.

1

y - = -- - - c .. , ,. .

                                                                                                       ~
                                                                              =
                                                                                                     ~

u.; .

                                                                                                                                                                                                                                          . 4-               ;
                                  .m                                                                                                                -
                                                                                                                                                                                                                                                      -u..

c

   ?
                           - Figure 1.1 Scope of the Current Risk Study                                                   Figure 1.2 Abridged Process of Computing Conditional Consequences
                                                                                                                                                                                                                                                        ~

Plant Parametric APET Source Term Ecuations/

                                                           /
j. Code SAACCS
                                                        .'                                                                  Concat:cnet
  • Scurce Corise- -
                                             , _        l                                                                   Procacitattes identiffer                     Terms                       ovences POS         -      - POSn
                                                                       ~

POS ,2 - / 3 I

                                                                                                                                                                                                                      \

d ABCDEF @ C O d -3 ' q C, b

                                          /

CD-d BABBCC O Od -z.- C o C, g [*[p 1c 1 ' r -

                                                                                  ~

mcl (PMCI - 1 ADCCDE oRod3 pC# %., 3 8

                                     -  -{-

r l$' texc3 S ABBDEF o C 0 1 a- R o C, [ (PMC) F Leveti ' Level 2 & 3 Uncertainty in - Ccnditional

  • Conseovences
                                                                       -""                                                                                                          ~

R - (F] [P] [C]- F = seevence frequency P - accident progression ' -~" probabdsty -

                                                                       - C = consequences
      ^.
                                                                                                                                                                                                                                              %   =er
     .w 3                                                                                                         bn .

s d - ' +

                                                                                                         ~      '

a

  • t - ' - .
... l-.. _ L. _ . 'E. ..C_

2 Accident Progression Analysis 2.1 Approach Following core damage in a severe accident, a risk analysis of the accident progression is done with an APET. The APET treats the progression of an accident from the onset of core damage to the release of fission products, f any, or a successful termination of the accident. The APET involves modelling of the physical processes occurring in the vessel and containment during the various accident sequences, and the availability and status of various safety equipment which could be used to mitigate the severity of the accident, and assessing the containment's capability to retain the fission products under severe accident loads. A series of questions are asked which represent these events and phenomena. Each path through the APET defines a unique accident progression path that potentially could give rise to the release of fission products. The number of questions in a APET can vary, depending on the details desired, and the number of relevant, important phenomena to be modelled. To deterruine the extent of detail needed for this APET, extensive use was made of the accident progression analysis for the Surry plant carried out for the NUREG 1150 program,' which was a PRA of the plant at full power. That study showed that the major cause of release was containment bypass, followed by basemat melt.through. The probability of early failure of the containment caused by various mechanisms and late failure resulting from gradual pressurization was either very small or negligible. Thus, once the containment boundary is closed, the containment retains the fission products most of the time (except by vt ry late basemat melt-through). In other words, phenomena such as direct containment heating at steam explosions were not important contributors to the estimated probability of containment fidlure and the eventual release of fission products. For accidents during low power and shutdown operation where the decay heat is significantly less and the reactor pressure is generally low, there are no particular reasons to believe that the containment performance would be any worse than for accidents occurring at full power. However, the containment cannot retain pressure during mid-loop operation at this plant, since some penetrations in the containment are closed with temporary barriers. Therefore it is unable to contain the fission products, and they will leak into the environment once they are released to the containment. This aspect simplifies the APET; because the integrity of the containment is already

                                                       .g.

i

 ~

{ 1 lost at accident initiation, many questions normally needed to assess the potential for containment failure are no longer relevant. Ilowever, several important questions must be assessed in this configuration, namely the timing of recovery of core cooling capability and the availability of I containment sprays. f 1 POS 6 is characterized by relatively low decay-heat levels due to the long time after shutdown that the plant enters this operating state. This low level potentially increases the time available to take i actions to recover core-cooling capability before the core is uncovered, and potentially reduces the I inventory of fission products available for release. Therefore,it is very important to determine the l time of accident initiation relative to the time of shutdown. Ilowever, as shown in Table 2.1, the 1 l time to enter POS 6 after shutdown and the duration of POS 6 vary widely from one day to more than one month. Therefore, these times were selected as an uncertainty paramcaer to be varied in the sampling process. The Ills method $ was used for sampling. To determine the timing of key j events in the accideat progression, such as core melt and vessel breach, several MELCOR calculations were performed with varying times from shutdown to accident initiation. 2.2 Plant Configuration The plant configuration during a low power and shutdown period can vary widely depending on the purpose of outage. Furthermore, there is a large degree of uncertainty for the operational state and availability of plant systems and components. Some examples are the number ofloops isolated, the size of RCS venting, and the availability of containment sprays. For this abridged analysis, the BNL staff assumed that all the loops were isolated and the safety valves were removed for maintenance, which provides a vent path from the RCS to the containment. The two most important factors for determining the containment's response during an accident in POS 6 are the status ofits integrity and the availability of sprays. Sprays are important because they are the major containment cooling system during severe accidents, and can reduce the source terms by scrubbing. There is no requirement under the existing technical specifications to have any of the containment sprays available once the plant enters the RHR entiy- condition at Surry.' Consequently, all of the containment sprays could be out of service during mid. loop operation. Therefore, spray availability was used as one of the uncertainty parameters in this study. 9

a

                                                                                                           ,1 From several discussions with the Surry personnel, the BNL stafflearned that while the containment' is " closed" during the mid-loop operation at Surry, closure does not ensure that the containment can contain the pressure which could be generated during a severe accident and prevent release of fission products.' This is due primarily to the presence of a temporary restraining plug, that has no overpressure capability, in place of the escape tunnel in the containment equipment hatch.

Therefore, for this study, the containment was assumed to leak during POS 6. 2.3 Level 1 Sequence Description Earlier, the BNL staff made a preliminary screening analysis of the systems reliability and characterized the accident sequences leading to core damage for the internally initiated events at the Surry Unit 1 plant.' The major objectives were to provide initial insights into any particularly vulnerable plant POSs during knv power / shutdown operations, and to identify the set of major initiating events applicable to each POS. From this coarse screening analysis,' the BNL staff determined that POS 6, mid-loop operation, is likely to be one of the most vulnerable plant conditions, mainly due to the reduced inventory in the RCS. The dominant causes of accidents during POS 6 are loss of RHR and loss of off site power. Loss of RHR accident sequences occur largely due to operator errors, such as over-draining, failure to maintain the level in the RCS, or failure to recognize a loss of RHR accident. Operating experience at nuclear power plants indicate a relatively high incidence ofloss of RHR. For this category of accidents, the recovery probability is largely determined by the HRA. Since this HRA has a large band of uncertainty, it also _was included as a uncertainty parameter. For accidents initiated by loss-of-power,its recovery determines the probability of recovering the core-coolin;; capability, and terminating an accident. 2.4 Event Tree Analysis A relatively simple APET was used to describe events in the vessel and the containment responses after core damage. Figure 2.1 shows the containment event tree used. The first three questions refer to the status of containment. In this POS, the containment is assumed to be leaking from the start of the accident. Once the status of the containment is identified, the fourth question asked is the timing of core-cooling recovery, which determines the extent of core damage. Arrest of core degradation before failure of the vessel during a severe accident could significantly decrease the 4 magnitude of release of fission products. Therefore, the timing of recovery of core-cooling capability was divided into five periods; Very early, Early, Intermediate, Late, and Never. The timing of Very . eady extends to the point where core cooling is recovered without any core damage. Eady is recovery of cooling during the relatively short period after the cladding rupture of the fuel rods, but before significant core melting. Intennediate is the period in which the recovery of core cooling will arrest the progress of core melt without breaching the vessel. From consultation with the source term expert panel, this intermediate period was assumed to extend until 45% core melting occurred. If core cooling is recovered during the Late period (which, here, is defined to be more than 45% of the core melted), the vessel is assumed to be breached by the core debris, Never indicates no core cooling recovery. Table 2.1 shows the timing of core-melt progression as calculated by the MELCOR code, which was used to determine the time available for recovery, assuming that the accident was initiated 24 hours after shutdown. However, this time can vary widely. Therefore, the DNL staff determined the time of accident initiation by sampling from the joint distributions of the time to enter the mid-loop operation and the duration of POS 6 for each observation. Data from the Surry plant, which were collected for the screening level 1 analysis,' were used to determine the distribution of the time of accident initiation;the MELCOR-calculated timing of the core melt progression was adjusted by the decay heat to determine the time available for recovery of core cooling for the accident sequences whose times of accident initiation were different from those selected for the MELCOR calculations. The recovery probability was based on the HRA recovery curve for human error,' the off-site power recovery curve,' and hardware availability for each of the time periods (the latter from data used in the screening level 1 study). The next three questions (fifth, sixth and seventh) address spray availability and whether the cavity is dry or wet, which determines the extent of core-concrete-interaction. Spray availability was included as an uncertainty parameter. The outcome of the accident sequences in the APET were classified into eight bins (including a No Release bin) depending on the extent of core damage, vessel breach and spray availability (Fig. 2.1). The basic structure of the APET (Figure 2.1) is sufficiently general to be applied to other POSs of - low power and shutdown operation where the containment is closed and able to contain the elevated - pressure. However, because the containment during POS 6 at Surry had no pressure-holding b capability, the branches related to Closed and Open containment were not developed further in this s 4 '

. .,i study. This APLT was applied to each of the major cutsets leading to core damage sequences identified in the preliminary screening level 1 study in which core damage was defined to have occurred when the coolant level dropped to the top of active fuel.

As discussed above, an accident can still be terminated without core damage if core cooling is recovered during the Very eady period. One possible exception to this is during the Very cady-cady i periods when cooling water is recovered. If the clad becomes embrittled on heat up,it could fracture on quenching, releasing the gap inventory. Water could enter the ruptured fuel rods and leach out lodine from the fuel. Depending on temperature and its solubility limits, iodine would be partitioned between the water and the containment atmosphere. While this accident scenario would not be important for off site consequences,it could have significant effects on-site. Due to the limited time we had available, these releases were not quantified. In estimating the finat risks conditional on core . damage, only accident sequences which were actually predicted to result in core damage were included; accident sequences which were terminated in the Very eady period were not included in the calculations of conditional risk. Figure 2.2 compares the conditionalprobability of arrest of core damage before vessel breach for the this analysis with the full power analysis of NUREG-1150 at Surry. Figure 2.2 indicates that the vessel is not breached approximately half of the time given core damage for both low power and full power accidents. e l

     .                                                                   y y

p e p o s ty 3 5 r ry i N. a e i v v a ty 3 3 k a k a y p a C / e e u s c w m 8 - l. l. e S.p &. a l

                                                                                                       'a o            C y

r a k k a W h r y p a p a p

                                                                   - a       e e                  b    S.

y D. y m S R R t, h h

l. E.

a r s p

                                                    %gsea g       g                          y   p e e 6%

e S S

                               ~                                           MM                       r p   o r      o           t      !

C e a n c e S. N.  %. i s s Bmw . be s R

                                                    %D a

i C. B B N. a u F. F. B B k a e k e s k a s y n R e V V V V t. I. t. B B B

                                           &Im&

l a n e m NN NN V V V A D ) ) ) ) ) ) ) ) ks B m ( CD 4 ( Q S)Q ( 6 ( Q 6 ( G i R n w o dt Ts a. m u r e . g . h 9 S ~loo I' g

          /r       n aC e    LC w

o P w r ey o 8 ehi rv et a ji 1' L WiC na de g i d y r , . b pXur. A 7 SI . i I' i e th ai t ht Cowr r f o ye w e ur e 5 pCe h _ r 6 ge Ii i 11 T 1eM or r t Ch n t e v E n te hc o 5 &e ea I1 6i 1i i i' i s s hB r

                                       )

t

                                                )

r

                                                         )

s. e e i

       -   r g

i n v e F r I I ) ) e r r e v ly a o r g r a N. e

                                                          =

r e L L

                                                                                                           %(

P f n ch y ht r a V ( t gcer a v L ( n 4 mCo sa e ec e r d i tor C c c A n .ti i 1 m b a 3 m p 2 o a ) e C7C n e r p u O i g

                                                                             ;,%                                          h tc a

F l G 2 h " - T IeN d gs ere s azd 1 Cri  : c s c tnB eA a f Cac F A T

                                                                                ,.u4.
                                                                                                        - .~                     .    . .   ,       ,.

s F4

        +-                 'l 1
            . . '.ll '
                                                                                                                                                                       \

1, ... > 1 f '. r

s;, e
           '44         4                                                                                                                                           e o

u 1

              ,                                   Figure 2.2 . Fraction of Core Damage Sequences Which are Terminated Without Vessel Breach '

r- *

         *                                                                                                                                                         , i.. ,

t

                                                            '1                                                                                                                     .
                                                                                                                                                  ..k.

0.8 - 3 .- 0.0 -

                                                                               -:t-
                                                                                                                  ~

t 0,4 - 0.2 - ' ' '

L 0 , ,

Low Power Full Power Table 2.1 Accident Timing (MELCOR Calculation with 24 Hours from Shutdown) t I Core Uncovery: ~90 minutes. . r .a'. .:, Cladding Rup'ure: t ~200 minutes s 30% Melt: ~240 minutes . '

  • 60"A Melt: ~300 minutes Vessel Breach: ~350 minutes - ~

J

                                                                                                                                                                                 .1
                                                                                                                                                                     . c, :
                                                                                            . 14 -
                                                                                                                                                                              -t; a

N _

                                                                                                                                                                              .g
                  ? r ,1

i 3 Source Term Analysis 3.1 Approach Early in the project,it was decided that the source terms should address uncertainty and wherever possible, the NUREG-1150 distributions of source terms would be used to calculate the source terms from an accident during mid-loop operation. The parametric code, SURSOR,4 that was developed in NUREG 1150 for Surry, was used to define source terms in the present study. Two measures were taken to assure the adequacy of the source terms: The first involved comparing the calculations from MELCOR with the data used in and results from SURSOR. Second, an advisory group called the Source Term Advisory Group was established to provide guidance, and any additional information on modifying the SURSOR code for the present study. 3.2 Description of Parametric Model The SURSOR code, together with its associated distributions from NUREG 1150, was selected as the basis for source term definition. This section briefly discusses the SURSOR code,its evaluation - (for modification, if required), and the final parametric model used. SURSOR is a parametric computer code used in NUREG-1150 to predict source terms for full-power operation. The parameters in SURSOR were defined in NUREG-1150 by formal expert clicitation. 5 A distribution,instead of a single value, was assigned to each parameter to address uncertainty Considering the differences between full power and shutdown operations, the Source Term Advisory Group identified two parameters in SURSOR as important and possibly different than the values used in NUREG-1150. The first parameter is the fraction of the fission products in the core that are released to the vessel before vessel breach. The second parameter is the fraction of the fission products released to the vessel that are subsequently released to the containment.' The distributions of these two parameters as defined in NUREG 1150 were compared with MELCOR' calculations to establish their values to be 'used in the present study. l In SURSOR, a source term is uniquely defined by the Accident Progression Bin (APB) using eleven

characteristics. Table 3.2.1 shows the APBs and the attribute assigned to each of the 11 l 15 - l 1

y. v characteristics for the APUs derived in Section 2 that would cause significant off site fission product releases. Because the containment cannot retain pressure during a mid loop operation, even ifit is closed, the two characteristics related to containment conditions, namely, the time and size of containment failure, are assigned attributes "early" and " leak," respectively. The mode of vessel breach is assigned either as "no vessel breach" or as a bottom head failure, according to the definition of the APBs (Section 2). The containment spray condition also is assigned a value according to APU definition, and the mode of core-concrete interaction is assigned a value based on core injection and containment spray recovery conditions (and thus, the water available to the corium) defined in the APDs. SURSOR was used to predict the release fractions of fission product for the five APDs (APB-4 through APB-8) presented in Table 3.L Two hundred sets (or observations) of release fractions were produced for each of the five bins to address source term uncertainty, Figures 3.l(a) through (d) present the ranges (5 percentile to 95 percentile) of the release fractions of the nine radionuclide categories for APBs 4 through 7, respectively. These figures also show the median (50 percentile) and mean values of the release fractions from the 200 observations, and the calculations from the MELCOR cases that are related to the individual APBs. Figures 3.2(a) and 3.2(b) give the distributions (the range and the median value) of FCOR (fraction of fuel inventory released to vessel) and FVES (materialleaving the RCS as a fraction of those which are entering the RCS) used in SURSOR, and the calculated values from MELCOR for three cases. As shown in Figure 3.2(a), the difference between the MELCOR calculations for two cases with different accident. initiation times (24 and 72 hours after reactor shutdown)is not significant, and the values predicted for a core-recovery case are less than those predicted for the other two MELCOR cases that proceed to vessel breach. Certainly, the release fractions for the core- recovery case would depend on the time of recovery. These figures shows that generally, the MELCOR values fall within the ranges of SURSOR predictions. Although, for some radionuclide categories, the MELCOR values are closer to the upper ranges of the SURSOR predictions, they can be attributed to uncertainties; there are no apparent reasons to modify the SURSOR distributions. Consequently, the Source Term Advisory Group did not recommend any change to the SURSOR code for source term predictions.

q p

 '4 3.3     Results To limit the number of MACCS calculations, and to provide a range of uncertainty,19 source terms were randomly selected (from the 200 STs, using the LHS sampling method) for each of the five APBs for off site consequence calculations.* When combined with the two time parameters defined in Section 2 (associated with drained maintenance and refueling), this gives 38 source terms for each APB.t Figure 3.3 shows the rr.nges, median, and mean values for the release fractions of all the selected source terms. For comparison, the figure -hows the values calculated by MELCOR for a core-recovery case and a vessel breach case.

In addition to release fractions, a complete dewion of a source term requires specification of the timing, energy, and height of the release. The timing of the release affects both the radioactive decay of the inventory and the warning time for off-site emergency response (e.g., evacuation). Table 3.2 presents the mean values of the release fractions for the nine radionuclide categories, the release time (time when fission product release begins), and the duration of release. Both the release times and durations in Table 3.2 are obtained from MELCOR calculations. Since the release time is measured from accident initiation, it is not suitable for calculating radioactive decay after reactor shutdown, but can be used to determine the timing for emergency activities. The warning time for off-site emergency response is the time between the notification to the public, and fission product release (in the present study, the warning time is assumed to be 60 rninutes after accident initiation). The energy of the release is assumed to be 1.0E6 watts, which is a value between the high and low values used in NUREG-1150 for similar containment failure conditions, and the height of fission product release is assumed to be at ground level for all bins.

  • This is the minimum number of STs to provide a 5% to 95% range. However, because of the low confidence level associated with such a small sample, they are simply referred to as the upper and lower limits of the calculations, with no percentiles associated with them<

t Source terms for APB-4 through APB-8 are given in this section for later MACCS calculations. . Source terms for APB-1 through APB-3 are not given because they are not expected to cause significant off-site consequences (Due to early recovery, there is no core damage for APB-1 and only cladding damage for APB-2 and APB-3.). Also, the sourcc terms for APB-4 and APB-5 obtained in this section are the same (thus, they are' combined in the off-site consequence calculations). This is because the containment sprays,which are assumed to be recovered 'after the recovery of core injection, have a negligible effect on in-vessel fission product release, and, consequently, do not affect fission product release to the environment for this group of source terms. r j c -

1

   - ';       An important parameter in the source term definition, which is not considered in a full power       :1 analysis,is the time of accident initiation from reactor shutdown. This parameter determines the inventory available for release at accident initiation. The extended time period between accident initiation and reactor shutdown for an accident during the low power operation will result in significant radioactivity decay, and consequently, much reduced fission product inventory available for release. Because of its importance, it is treated as one of the uncertainty parameters in the present study (see Section 2). A randomly selected value is assigned to each source term defined in this section. Figure 3.4 shows the ranges, median, and mean values of this parameter used for both drained maintenance and refueling.

P I l I 4{ i.a l I

                                                                                                                                                                                  .{

l

h g o .. ..

 ,.,,E..

1E+00, 1E+00; . IE-01j p

                                                   - 'f-a 1E-0        -a 9      { .y p                      1E.02j                                         g                        n                    1E-02j                                 n                     g             '

T " 1E-03; " < -' 1E 03' o o I

                                                                     "           o              n            ,-            I
                                                                                                                                                          "        o.

p 1E 04j _  : J 1E-04j n  ;- , oss value l!

                ,8.1E-05j                                                               ,,               _         1E 05j                                             ,   p 1E46j           bValue                                                                       1E06j 1E47'                                                                                        1E-07j l         5% Value
1E-00j 'o. 1E 00l -

M*88 1E 09l 1E 09j 1 A . 1E-10j MELCOR 1E 10; 1E 11 5--v . . . . . . . . 1E 11 . . . . . . . . . NO I Cs To Sr nu La Ce Be NG i Cs To . Sr Ru La Ce Ba Release Category Release Category 1 (a) APH 4: No VB, Early Containment hak, (b) APH 5: No VB, Early Containment bak, No . Containment Spray Containment Spray.

                                                                                                                                                                                           't 1E+00;          ,-                                                                            1E+00; D                                                                                        N      9      I!
                   - 1E41j                 s 9      {      ,                        ,,                    1E-01j t,,

o n - 0 " 1E 02l n o 1E-02). j,, o o  ! o - n. 1E43; u . 1E-03; m ,, g( y, 1E 04 ' " 3,

                                                                                                                ' 1E-04l                                                                     '
                  ' 1E-OSj           x-r               I                   Go% Value                                                               " "1E-05i                                                                   ,

N 1E-0Gl - l 1E46 Swaw 1E 07 1E 07

                                   .o                                                                                   !

1E-03; M*"".

                           '                                                                                    ' 1E-08' A.                                                                                  !

1E-09] MELCOR ' 1E-09j 1E 10 . . . . . . . 1E 10' . . . . . j NO I Cs To ' Gr Ru La Ce Be NG I Ce To $r Ru s La : . Ce Baf . t Release Category Release Category; . t (c) APB 6: VB, Early . Containment Leak, (d) APB 7: VB, Early Containment ' Leak, No - Containment Spray, and Deep Wet Containment Spray, and Shallow Wet '-

  !                                            Cavity                                                                              Cavity                                          "
                                                                                                                                                                                         <}

Figure 3.1 Release Fractions' Calculated by SURSOR (95%,50%,5%, and Mean Values) and MELCOR

                                                                                                                                                                                       ; ?* ' I                 t. f i,     '

f; '

                       . d  ' (~ h.'f      ~

3 t r 1 / 1 ' p y .. D' f.;,., u a _ , .t ;,^ 1 \' y; r

                                         i f .3,
                                                                                                                                                      ,                                                                                   V.               ,
                                                                                                                                                                                                                                                                       /1 k                                               .,
                                                                                                                                                                                                                                                                          '+

g, ,,s. . E s NUREG-1150 FCOR Distribution NUREG-1150 FVES Distribution ' (Low Zr Oxidation in-Vessel),

                                                                                                                                                                                 . (Low RCS Pressure) L 1'

A:,' o

                                  ' .1 G + j00 -                                     gj - n f                                                                                    1 E+ 00,    =                                                                                                            '
n. n g o g. g a

c: g 'o a~ o

o. >
                     ,                -1E41j                                                  o                                                                                                                             .'

o d a n a

                                     ; 1E-02?

u r d0 . np.

                                                                                                                                                                      ~ "'

x .u n

                                     ?1E-03                     95% Value .                                O       O     ;;.                   7
  ' w" '                                 .
                                   .1E 04j                     50% value .                                               "

n _ ;t_

 ,>w                                                ;           '-                                                                          "-

o n.

    'C                                  1E-00;                 6% value l' 1E 01:                                                                                                        'a.  .     *
                                                    ;            A                                                                          q.                                                                                                                            .t IE46;       ~

MELCOR 24 cZ

                                                    .            a
  • 1E-07{ MELCOR 72
O nc ,1E48{ MELCOR CR
                                                                                                                   '                                                                                                                                      J:              2;
                                      '1E49                   .                      .        .        .                      .                     1E 02 .

f40 t. Cs

       ,                                                                                    To        St   Hu la        Ce : Be                              No        l'    Cs ' ie ' S'r                 Ru ' N              Ce          'B'a '

Rolease Category Release Category = (a) Fraction of fission products in the core that (b) Fraction of fission products in the vessel . + -

                  ,,                                        are released to the vesse'.'                                                                  that are released into the containment.                                                                       ,   I Figure 3.2 Comparison of Important Values of Used in SURSOR and Calculated by MELCOR a

s

                                                                                                                                                                                                                                                                           'y Release Fractions for Selected Source                                                      Time After Shutdown for inventory Terms for MACCS Calculations                                                                        Calculations
                                                             --w 1 E +00}             '1 1000                                                                                                                   4

{

                                                                                                't       v 1E41j                                      .y                                                          ' 900 1E-02j                                                           b                                                                                                                                                      '
                                                                                                         "                       '                   000-                                                                                                                   '

1 - o e 8 ,1E 03j; u N E 700-Maximum ' o 9 p IE44l -x

                                                                                                                                             .g 600-1E45                                                                                                                 '
                                                                   -                                                 "     "                f~SOO<Maximum                                                                                                                    '

1E-06 Minimum , 400 x L. O Median '* 1E-07g Mean 300-

                                                                                                                                                             ,.                                                   ., g                                          q.>

1E48j pjLCOR CR '200 m um H 'm

o 1E-09 * , .-

100- Mean' , 1 E-10-- -- . . . - 0

                                                             .NG'                                                                                                                                                                                               c- ' <

1 Cs To Sr Au. La Ce ' Ba Drained Mamt. ; Refueling Release Category

                                                                                                                                                                   ~

Category' , yq Figure 3.3 Comparison of the Release, Fractions : Figure 3A The Time of Acciden4 Initiation After < Used . for - MACCS Calculation Reactor Shutdown for Radioactivity:

                                                                     - (Maximum, Median, Minimum, and                                                                Inventory Calculation.                                                                                3 Mean) and Calculated by MEIIOR                                                                                                                                                           ' 

l1 B

              ..                    6
             '1 ) ,
                                                                                                                                                            'x.

Table 3.1 Low Power / Shutdown APBs for Source Term Calculations

              .                        I             2               3            4        5         6         7     8          9         10        11 AFB             AFB ID"'
 #                                    CF           Spray         CCI Mode       RCS VB Mode SGTP             CCI    Zr       HPME        CF       RCS Time                                       Pres                         Size Oxide                  Size      Hol 4       CFCDFCDADCA              Early       Lt-to-VL       No                Low       No        No        No   low         No       leak      One 5       CIICDFCDADCA             Early       No.           No                 Im        No        No        No   Low         No       leak       One 6       CFDDCCAADCA              Early       Lt.to VL       Prompt Deep       low     BtmIld      No      Large  Iow         No       Leak      One 7       CIIADCCAADCA             Early       No             Prompt Dry        Low     BtmIld      No      large  low         No       Leak      One 8       CIIBDCCAADCA - Eady                  No             Prompt Shlw       Low     Btmild      No      Large  Low        .No       leak      One Note: (1) According to APB identification used in NUREG-1150.

Table 3.2 Mean Release Fractions and Timing of Release Mesa Release Fraction Timing of Release (Minutes) Case No. NG I Cs Te Sr Ru La Ce Ba Release Duration Time 4 0.702 0.064 .0.047 0.019 5.89E-03 8.25E-04 3.08E-04 131E-03 6.12E 190 - 50 5 0.702 0.064 0,047 0.019 5.89E-03 8.25E-04 3.08E-04 131E-03 6.12E-03 190 50 6 1.000 0.149 ' ~ 0.096 0.041 131E-02 1.65E-03 7.76E 2.78E-03 133E-02 190 120 7 -1.000 - 0.228' 'O.184 - 0.108 5.80E-02 . 233E-03 6.40E-03 8.60E-03 5.17E-02 190 400 8 1.000 0.182 0.127 0.072 2.53E-02 1.84E-03 2.49E 4.59E-03 235E-02 190 '400

                                                 ...              .                     ~                           .2-

m . l 4 Consequence Analysis 4.1 On-site Consequences The total on-site dose rate is a sum of the inhalation and cloud exposure dose rates based on the radionuclide concentration in the wake region of a building. The dose rate is calculated as a sum of the cloud inhalation dose rate, Df, and the cloudshine dose rate, D,"(based on the 60 radionuclides in the MACCS dosimetry routine): im D = [ Dl" + Dj"} ,

i. s where, Dl" = DFI,9 Y t f ...} ,

Dj" = DFC,,,Y (...} Syls, 7 DFI,- inhalation dose-conversion factor, Sv/Bq: is the semi-infinite cloud-conversion factor for nuclide i; DFC.,, , *Be x*", 0 - breathing rate, m%. In this calculations, the breathing rate p = 0.000266 m% following the' MACCS code default value; r,- fraction of nuclide's Iinventory released over the puff duration, t ; I, - total inventory of nuclide i, B, . In the correlations shown above,[...] denotes an expression specific to a particular correlation for predicting the average concentration in a building wake (Ramsdell,'" Wilson," Reg. Guide 1.145)." The on-site dose rate was estimated using the wak i enterline concentration models: Ramsdell, Wilson," and Reg. Guide 1.145." Brief descriptions of each model follow.

Ramsdell Model The Ramsdell model calculates the concentration in the far region of the wake by including the , effects of the lateral and vertical diffusion due to background turbulence: I []= z 2 tr U(a, , (ggf,2 y2) F(T,)j'" x a, (ggf,2 g2g2) F(T,) assuming that K = 0.5. In the correlation above, I F(T) = 1 -[1 + x/(UT)) exp [-x/ UT)], 1 where T = T, or T,; T, = A'"/u*, sec; 1 T, = T, for extremely unstable weather (Class A, Pasquill-Gifford), and T, = T,/2.5 for extremely stable conditions (class G); S = 1 for extremely unstable wrather (Class A, Pasquill-Gifford), and S = 2.5 for extremely stable conditions (chtss G); u* = aU, friction vekx:ity, m/s; a = 0.4/In(z/z );a U is the average wind speed at z = 10 meters, m/s, and surface roughness length z = 0.1 m; based on this, a = 0.0869, A - building area, m2; o,and o,- diffusion coefficients due to the background turbulence. Wilson Model D The Wilson model suggests a correlation for calculating the lower limit on the dilution in the wake (which corresponds to maximum coi. centration in the wake): I)g = 0.11 K,d ; A this leads to the following expression for JL: o 1

                                                            -B.

t-

r m e . I I lli a [. ] = 0.11 Uy2 . ( ), i As recommended, a multiplier of 5.0 was used to calculate the ground level release (elevation lower .l than 0.2 II, where H is the height of the building). NRC Reg, Guide 1.145 Model Equation (2) of the Reg.1.145 model"is used for calculating g: where a, = ax^ and a, = cxd, x is the distance from the source, m, and the dispersion constants a = 0.0722, b = 0.9031, c = 0.2, and d = 0.602 for stab!c weather, Pasquill-Gifford Class F. Calculation Assumptions The scoping was calculated with the following set of input parameters corresponding to the Surry building and site: o distance from source,x = 10 to 300 meters, o building projected area, A = 1500 m 2, and, finally, o wind speed at 10 m elevation, U = 1.2 m/s. Wind speed was obtained by an arithmetic averaging of the wind speeds observed at the Surry site during the most stable weather conditions (Class F stability). Results The bounding calculations were performed for three source terms referred to as high, medium, and' low (Gap release). The Wilson / Reg. Guide 1.145 labelled box in Fig. 4.1 is based on the Reg. Guide 1.145 prediction, limited from above by the values predicted by the Wilson model. The results in Fig. 4 ir the dose rate (Rem /h) indicate a variation of about two orders of magnitude as a function of the source term. The on site dose rates are high, and are likely to lead to non-stochastic 4-health effects for expose'd workers. In view of the relatively large number of on-site personnel during shutdown operations, these dose rates outside the containment suggest that a careful examination should be made of on-site evacuation schemes to limit the consequences. 4.2 OIT-site Consequences MACCS' calculations of the off-site consequences were made for all the source terms of POS6 generated by LHS sampling $ of the SURSOR results. There were nineteen sample groups (one for Drained Maintenance and one for Refueling outages), each containing four distinct sets of release fractions for the nine radionuclide groups represented in the MACCS calculations. The time of release for each group was determined using the LHS technique. Then, the initialinventory for each source term was calculated using a logarithmic interpolation between the two closest data points. The inventories for various times after shutdown were taken from Denning et al." The following additional information/ assumptions were used:

  • Release power: 1.0 MW (sensitivity calculations with 0.0 MW).

e Release elevation: 28' (8.54 m).

  • Warning time: 130 minutes (130 min = 190 min - 60 min).

Figures 4.1 and 4.2 show the results for the early and latent fatalities predicted by MACCS. Bins 5 through 8 contain thirty'eight data points each. The median value is shown only for Bin 7; zero values were predicted for the remaining bins. The calculations predict the highest number of early fatalities for Bin 7. The number of early fatalities is very small (less than 10-2), even for the most severe accidents involving failure of the vessel's bottom head. [ 25 - L

s , . n. - - , y' ' - ,, :p,

                                  .                      ,                       ..,.g
                                                                                 .>          '                                                      ,1
                                                                                                                                          . u:;
                                    ,     ,                                                                                        ?
a. .y
                                                                                                                                                                                 ,,q:,

iI ii, ,.'j j' j e i i 1 j p3 , L. I

s. ., ,.i..,
'g                                                                                 Figure 4.1 On-Site Parking Lot Dose Rate                                                r,-
  'i

('$

  >'                           '                                                               -' Scoping Parking Lot Dose Rate
                                                                                                      ' Ramsdell Model . SURRY. POS6
f o .:

I M +06. ., 1.i r:  : , 1M + 05: ' i

.a 0  : 7, e . tM+04s:

v. + CC

                                                  .                     :                                                              High                                                        -

s $ i  % a:- > e im+m3 ' 8 i Medium > w a Low (Gap Release)

                                                            ' * *"l                                                                                                  .,-           .
                                                                                                                                                                                             '4 1, -

tK +01 , , , , , , , 4 60 100 160 300 290 300  :+ Distance from Source (m)

        <.                                                                                                                                                                               .a     .

Scoping Parking Lot Dose Rate ti Wilson / Reg. Guide 1.145. SURRY, POS6 - , 1M +01; ' s C 5 j .,; tK+ 063

                                                                                                                                                                                               ' .I
                                              ,            p y $5+05j                    ".                                                          High g                      :

16  :

                                            .cc                                                                                                                                                    ,
                                              -e m

im+o9

                                                                               \                                                        Medium O

O  : ta+ a0 Low (Gap Release) x~.. , 1a 41

                                                               . h                       n                    i             r         F 300' -

0 50 100 t50 200 25'0  ! i l Distance from Source (m) .. ! I J m

                                                                                                                                                                                                -i l

I v ti d ,[- i'- ,

                                                                                                        .                         --~

lj

     " .                                   .                                                                                                              - p Figure 4.2 Off Site Consequences Calculated by MACCS                                                            !

Number of Early Fatalities o Low Power / Shutdown Study 1.0E+ 00 : a. v>-

                     ,e              .-

a

                                                                                                    ,                    High                         ,
                    .3                                                                                                                                       ;
                     .5      '1.0E-01 !                                                                                  Median f                :           =                                                              =

4

                     -p               :
                                                                                                    -                    Mean
                    .$        1.0E-02;                                                                                                       .             .
                                                                                                                 ~

o  ? ~ u" - m

                     -Q       1.0E-03s
                    'E                5 a               -           .
                    .z                :                                                                                                           - -

1.0E-04 Bih5 Bih6 Blb7 Bih8 o Number of Latent Fatalities. 1 Low Power / Shutdown Study 1.0E+04: . . . 8  ! Low

g -
                                         ~
                                                                                 ,                               o a                                J y                        .

High LL. . 1.0E+03; . A: 1 E- ~: . Median e  : -

                                                                                                                                                           ?
                                                                                                                          .w a                -

f J - Mean o m 1.0E+025 , e  :

                       .o                -

e, E  : 2- ~ Z 0 1.0E+01 Bih5 Bih6 Bih7 Bih8

                 -a             ,                      ,
                                                              - , - - , . . ,            -            ,     i..,     .       , ,. N , , u

i h .s v, l.

         '5 Integrated Risks Conditional on Core' Damage Once the consequences are calculated for each of the release bins, conditional risks c m be evaluated by combining the accident progression analysis, source term analysis, and consequences. If the core damage frequencies of the PDS had been available from the level 1 analysis, absolute integrated risks could have been calculated for this particular POS. However, since they were unavailable, the risks -

were calculated as conditional on core damage; i.e., the results presented are averaged over various - accident progressions, given core damage. 1 Figure 51 shows ranges of four risk measures (conditional on core damage), the early fatalities, late cane:r fatalities, the population dose at 50 miles, and the dose at 1000 miles, calculated for the POS i 6 at Surry. The upper and lower bounds shown in the figures do not represent any particular statistical measures because the number of samples was too small to attach any statistical significance to them. However, if sufficient samples are used, these bounds are expected to asymptotically approach the 5th and 95th percentiles. For comparison, the figure show the same risk measures for full power operation at Surry from the NUREG-1:50 study; for this comparison, these results were converted to risks conditional on core damage and containment failure. The comparison shows that the early fatality risk from low power operation during POS 6 is considerably less than that of the full power operation (conditional either on core damage or on containment failure). This result is expected since the fission products will have had a longer time to decay and the species which have the greatest influence on the early fatalities generally have shorter halflives. The figure also shows that the latent cancer fatalities and population doses are higher than those predicted for the full power accidents conditional on core damage. However, these long-term health effects are about the same for accidents conditional on containment failure tecause these risk measures are more affected by slow-decaying species and the longer decay time has less impact on - these species. Therefore, the risks are similar once containment is failed. Since the containment is assumed to be essentially open during POS 6 of shutdown, the off-site risk oflatent health effects averaged over core damage sequences is higher for POS 6 than for full power operation. These comparisons are conditional on core damage or containment failure, i.e., assumi..; the same fi cquencies of core damage or the same probability of containment failure. However, the risk profile is determined by the product of these conditional risks with the frequencies of occurrence of the E conditions giving rise to the risk. If the frequencies of core damage accidents are significantly 28 - o

c 67' 4' V r different at low power / shutdown from those at full power, the integrated ' risk' profiles will be dominated by those (Level 1) frequencies. v b P

                                                                                                      )

6 4

                                                                                                                                                                                                      -c     .-

Figure 5.1 Comparison of Risks Conditional on Core Damage Coed. Early Fatality Cod Pop. Dose - 50 Mi. (Person-Rem) 1.OE*00 g 1.0E*07 .

                                                                                                                                                                                               - g
1
                                                                                                                                            ~

1.0E-01 g

                                                              ~

1.0E *06 - 1.OE-02 g _

                                                                                                                                                                                             ~

1.OE-C3 r -

                                                              .                                                                  1.OE +0 5  g 1.CE-04    t 1.0E-05                                                                       1.CE*04 LP         FP Cond on CD       FP Cond on CF                               LP           FP Cond on CD   FP Cond on CF e

ba O a Cond. LaterJ Cancer Fatality . Cond. Pop. Dose - 1000 ML (Person-Rem) 1.OE*05 1.0E+08 1.0E+04 g 1.CE *07 - 1.CE+03 g _ _ [ _

                                                                                                                   -            1.0E+0 5   E                            _
                                                                                          ~
                                                                                                                                           ~

1.0E+02 g - - - 1.OE*C5 E 1.0E*01 g ,- r' 1.CE*c0 10E*04 LP FP Cend on CD FP Cond on CF LP FP Cond on CD FP Comd on CF

                                                                .FP results based on NUREG-1150J
                                                                                   ~

_ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ ._ ._.=.______._ .- . _ __1 - .2-

m o , 6 Concitisions The abridged risk study has shown that during shutdown a severe release can occur with conditional long-term consequences approaching those of full power operation. In the mid-loop operation, POS 6, where the RCS inventory is less than half of the full inventory, the loss of RHR can proceed to core uncovery in less than 2 hours if corrective actions are not or cannot be taken. The progression of the accident beyond core uncovery and its possible mitigation depends on several factors including  ! the timing of the recovery of core cooling, and the availability of containment sprays. In POS 6, the  ; isolation of containment in the sense of achieving a pressure holding capability is judged to be not possible within this time frame. Thus, the containment is 2xpected to leak from the start of the release. This possibility could have significant implications for on-site habitability and,in particular, ' . for the ability to successfully undertake necessary corrective actions. The defense in-depth philosophy of I LS. nuclear power plants traditionally considers three barriers to the release of fission products into the environment, the cladding, the reactor vessel pressure tvundary, and the containment. During shutdown operation and especially in the mid-loop condition based on currently available information, no credit could be assigned to the containment as a barrier once the fission products are released to the containment. Thus, unlike the full power case at Surry where the containment is expected to retain the fission products in over 90 percent of the releases, defense-in-depth at shutdown could be negated by the operational condition of the plant. Then, once the core damage occurs, the only possible mitigation (apart from containment sprays whose availability also is questionable) is the natural decay of the radionuclide inventory, particularly the short-lived isotopes of iodine and tellurium which are primarily associated with early health effects. The predictions of off-site consequences, which show 'almost no early fatalities, confirm this conclusion. However, these results also show that the conditional risk of long-term health effects due to iong-lived isotopes, such as ecsium, could be as severe, if not worse, as the corresponding risks at full power, mainly because the containment barrier is not present. The ultimate risk significance of the conditional results, however, depends on the frequencies of the accident sequences leading to core damage. Currently, these frequencies are being calculated in the Level 1 analysis. j If the core damage frequency during low power / shutdown is about the same as at full power, then the result of this study show that probabilistic risk analysis of reactor accidents needs to be extended, in general, to cover the risk during shutdown operation. . u

          ,\ k.

k _T 4 y

    ~i           7      References
1. U. S. Nuclear Regulatory Commission, " Severe Accident Risks: An Assessment for Five U.S.

f Nuclear Power Plants," NUREG 1150, Vols.1 - 3, December 1990 - January 1991.

2. R. M. Summers, et al., "MELCOR 1.8.0: A Computer Code for Nuclear Reactor Severe Accident Source Term and Risk Assessment Analyses," NUREG/CR-5531, Sandia National Laboratories, SAND 90-0364, January 1991.
3. "A FORTRAN 77 Program and Users Guide for the Generation of Latin Hypercube and Random Sampling Use with Computer Codes," R.L Iman, et al., Sandia National Laboratory, NUREG/CR-3624, March 1984.
4. H. N. Jow, W. B. Murfin and J D. Johnson, "XSOR Codes User's Manual," NUREG/CR-5360, Sandia National Laboratories, December 1989.
5. F. T. Harper, et al., " Evaluation of Severe Accident Risks: Quantification of Major Input Parameters. Experts' Determination of Source Term Issues," Sandia National Laboratories, i NUREG/CR-4551, Vol. 2, Rev.1, Part 4, June 1992.

t ( 6. D. I. Chanin, et. al., "MELCOR Accident Analysis Consequence Code System," Sandia National Laboratories, NUREG/CR-4691, Sandia National Laboratories, SAND 86-1562, Vols. 1 - 3, February,1990.

7. T-L Chu, et al., "PWR Low Power and Shutdown Accident Frequencies Program: Phase 1-Coarse Screening Analysis," Draft Letter Report, November 1991. Available in the NRC Public Document Room,2120 L Street, NW, Washington, DC.
8. A Letter from T. L Chu, Brookhaven National Laboratory to C. lovett, Surry, Feb.1992.
9. " Handbook of HRA," A. D. Swain, NUREG/CR-1278, August 1983. j
10. J. V. Ramsdell, Diffusion in Building Wakes for Ground-Izvel Releases, Atmospheric j Environment, Vol. 24B, No. 3, pp. 377-388,1990
11. D. J. Wilson, Dilution of Exhaust Gases From Building Surface Vents, ASHRAE Trans.,83 (Pt.1), pp.168-176,1977.
12. U. S. Nuclear Commission Regulatory Guide 1.145, Revision 1, November 1982.
13. R. S. Denning, R. Freeman-Kelly, P. Cybulskis, and L A. Curtis, " Source Term Calculations for Assessing Radiation Dose to Equipment," NUREG-CR-4949, July 1989.
/

E _ _ - - _ _ - - _ _}}