Letter Sequence Other | |
---|---|
MONTHYEARML20127A4681978-03-0101 March 1978
[Table View]Summary of 771129 Meeting W/Mark I Owners Group & GE in San Franciso,Ca Re Listed Topics,Including Results & Bases for long-term Program Decision Point 3.List of Attendees & Viewgraphs Encl Project stage: Meeting ML20063F9221982-08-23023 August 1982 Requests That 820930 Order Date for Completion of Mark I Containment Program Mods Be Changed to Spring 1983 Refueling Outage to Complete Remaining Work on Torus Temp Monitoring Sys Project stage: Other ML20064J5801982-11-0808 November 1982 Part 21 Rept Re Matl That May Not Be in Compliance W/ 10CFR50,App B,Section Viii Requirements.Matl Supplied to Ne Public Power District & Omaha Public Power District.Qa Depts Contacted Re Resolution of Nonconformance Situation Project stage: Other ML20077D1201983-04-13013 April 1983 Informs That While Reviewing QA Documentation & Work Packages Provided by Dravo Util Constructors,Inc for Mark I, Penetration Welds Performed by Unqualified Welders.Ge NDT Personnel Will Examine Welds Beginning 830418 Project stage: Other A830015, Forwards Responses to Apr 1983 Request for Info Re Mark I Containment long-term Program - plant-unique Analysis Rept Loads Evaluation (NEDE-24840)1983-06-0202 June 1983 Forwards Responses to Apr 1983 Request for Info Re Mark I Containment long-term Program - plant-unique Analysis Rept Loads Evaluation (NEDE-24840) Project stage: Request A830023, Summarizes Completed Corrective Action on Mark I Mod Welds Installed by Unqualified Welders.Welds Examined & Modified If Needed1983-10-0707 October 1983 Summarizes Completed Corrective Action on Mark I Mod Welds Installed by Unqualified Welders.Welds Examined & Modified If Needed Project stage: Other ML20084L1171984-05-0707 May 1984 Proposed Tech Specs,Incorporating Mark I Containment Mods Project stage: Other NLS8400137, Application to Amend License DPR-46,consisting of Proposed Change 13,revising Tech Specs to Incorporate Mark I Containment Mods,Per NRC 840120 Request.Class III Amend Fee Encl1984-05-0707 May 1984 Application to Amend License DPR-46,consisting of Proposed Change 13,revising Tech Specs to Incorporate Mark I Containment Mods,Per NRC 840120 Request.Class III Amend Fee Encl Project stage: Request ML20212A8241986-07-24024 July 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Cooper Nuclear Station, Supplementary Technical Evaluation Rept Project stage: Supplement 1983-10-07 |
ML20064J580 | |
Person / Time | |
---|---|
Site: | Cooper, Fort Calhoun, 05000000 |
Issue date: | 11/08/1982 |
From: | Owen R PAXTON CO. |
To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
References | |
REF-PT21-82-741-000 PT21-82-741, PT21-82-741-000, TAC-07934, TAC-7934, NUDOCS 8301180123 | |
Download: ML20064J580 (1) | |
Category:DEFICIENCY REPORTS (PER 10CFR50.55E & PART 21)
MONTHYEARML20217A1691999-09-22022 September 1999
[Table view]Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20211D6491999-08-25025 August 1999 Part 21 Rept Re Nonconformance within LCR-25 safety-related Lead Acid Battery Cells Manufactured by C&D.Analysis of Cells Completed.Analysis of Positive Grid Matl Shows Nonconforming Levels of Calcium within Positive Grid Alloy ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20247G6131998-05-13013 May 1998 Part 21 Rept Re Defect Contained in Automatic Switch Co, Solenoid Valves,Purchased Under Purchase Order (Po) 970161. Caused by Presence of Brass Strands.Replaced Defective Valves ML20217A1531998-04-16016 April 1998 Closure to Interim Part 21 Rept Submitted to NRC on 970929. New Date Established for Completion of Level I & 2 Setpoint Project Committed to in .Final Approval of Setpoint Calculations Will Be Completed by 980531 ML20217D4141997-09-29029 September 1997 Interim Part 21 Rept Re Errors Noted During Preparation of ITS Surveillance Test Procedures Using GE Calculated Setpoints.Setpoint Calculations Will Be Reviewed,Corrected & Approved to Establish Significance of Errors ML20141C4931997-06-17017 June 1997 Part 21 Rept Re Nonconforming Raw Water Pump Impellers.Raw Water Pump Assembly AC-10D Replaced Due to Normal Wear on Pump Internals,Namely Pump Impellers & Impeller Liners ML20140A9661997-05-29029 May 1997 Part 21 Rept Re Ksv Emergency Diesel Generator Power Piston Failure.Caused by Jacket Water in Combustion Chamber. Recommends That Users Verify That Crown Thickness at Valve Cutout Be 100 Minimum ML20148D1201997-05-23023 May 1997 Part 21 Rept Re Replacement Impellers for Byron Jackson Raw Water Pumps Having Blade Dimensions Out of Tolerance Due to Normal Wear on Pump Internals.Replaced Raw Water Pump Assembly AC-10D ML20137G6261997-03-25025 March 1997 Svcs Part 21 Rept Re Emergency Generators Installed at Zion Station Which Developed Significant Drop in Crankcase Lube Oil Level.Caused by Crack in Liner Wall,Allowing Jacket Water to Enter Chamber ML20133E8001997-01-0808 January 1997 Deficiency Rept Re Nonconformance Related to Masterflow 713 Grout,Which Master Builders,Inc Has Supplied as Nuclear SR Product to 18 Npps.Cause Unknown.Requests That Listed Info Be Provided to Gain Insight as to Scope & Possible Cause ML18038A8971994-09-0707 September 1994 Part 21 Rept Re Defect in Latching Mechanism of Potter & Brumfield Relay on C&D High Voltage Shut Down Alarm Assembly Printed Circuit Boards.Pull Test on Relay Reset Button Incorporated Into Receiving Insp Procedures LIC-94-0164, Part 21 Rept Re Nonconformance in Potentiometers W/ Attachable Switches Mfg by Ohmite & Supplied by Abb C-E. Nonconforming Components Returned to Abb C-E & Abb C-E Issued Info Bulletin 94-02,providing Appropriate Guidance1994-08-24024 August 1994 Part 21 Rept Re Nonconformance in Potentiometers W/ Attachable Switches Mfg by Ohmite & Supplied by Abb C-E. Nonconforming Components Returned to Abb C-E & Abb C-E Issued Info Bulletin 94-02,providing Appropriate Guidance ML20071J5271994-07-26026 July 1994 Part 21 Rept Re Ohmite Model CU1021 & CU1031 Potentiometers Model CS-1 Switches Supplied by Abb C-E.Verified That Potentiometers/Switches Combinations Not Installed at FCS in Location Which Could Have Adverse Safety Implication ML18096B2421993-02-0101 February 1993 Part 21 Rept Re Possible Matl Defect in Stainless Steel Swagelock Tube Fittings.Initially Reported on 921218.List of Part Numbers,Heat Codes & Addl Affected Customers Encl ML20126J5961992-12-31031 December 1992 Part 21 Rept Re Potential Loss of RHR Cooling During Nozzle Dam Removal.Nozzle Dams May Create Trapped Air Column Behind Cold Leg Nozzle Dam.Mod to Nozzle Dams Currently Underway. Ltrs to Affected Utils Encl ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20118B4391992-09-11011 September 1992 Part 21 Rept Re Degradation in Abb Type 27N Undervoltage Relays Used in Electrical Switchgear.Recommends That Users Review Applications Requiring Exposures Greater than 1E03 Rads TID W/Time Delay Function Option ML20094J4681992-03-0202 March 1992 Part 21 Rept Re Amot Valve (Amot Part 1476B0212A3).Valve Originally Supplied as Part Number 2-05V-153-004 in Overspeed Shutdown Assembly KSV-72-7.Production of Valve Discontinued & Advises That Alternate Assemble Available ML20094F5211992-02-18018 February 1992 Part 21 Rept Re Defect in Amot Control Corp Safety Trip Valves for Use in Edgs.Defective Overspeed Trip Valve Removed from DG 1.Replacement & Existing Amot Overspeed Trip Valve on DG 2 Inspected & Determined Not to Contain Defect ML20079L4911991-10-29029 October 1991 Part 21 & Deficiency Rept 158 Re Potential Defect in Component of DSRV-16-4 Standby Diesel Generator Sys. Drawing Rev to Increase Gear Tooth Hardness Completed. Recommended Corrective Actions for Sites Listed ML20085D4971991-10-0707 October 1991 Part 21 Rept Re Cracking in Casing of Exide Type GC-23 Batteries Produced Prior to 1983.Initially Reported on 911003.Caused by Inadequate Design of Cell Terminal Post Seals.Use of pre-1983 Subj Batteries Discontinued ML20079H0921991-08-27027 August 1991 Part 21 Rept Re Failure of Roll Pin Mfg by Cardinal Industrial Products,Corp & Used on DG Damper Actuator Due to Phosphorus Segregation Caused by Improper Tempering Heat Treatment.Inlet & Outlet Dampers on DGs Opened ML20028H3531990-12-13013 December 1990 Part 21 Rept Re Cable Assemblies Failing to Meet IEEE-383 Section 3 Flammability Tests.Results of Tests Conducted on 901206 Encl.Corrective Actions Include Applying Flame Retardant Covering to Cable or Cable Replacement ML17348B5061990-10-0909 October 1990 Part 21 Rept Re Zener Diode VR2 on Power Supply Board 9 1682 00 106 Possibly Being Installed Backwards ML20012A9011990-02-27027 February 1990 Suppls 900213 10CFR21 Rept Re Chilled Water Sys Operation. Evaluation of Crystal River Determined That Postulated High Energy Line Break in Intermediate Bldg May Be Subj to Steam Loads Higher than Normal Loads,Causing Rising Water Temp ML20011F1941990-02-22022 February 1990 Part 21 Rept Re Abb 27/59 Relay Catalog Series 211L.Solder Connections to Printed Wiring Runs on Bottom of Circuit Board Deteriorated Due to Thermal Stress.No Actual Failure Occurred & Relays to Be Changed at Next Outage ML20011F5971990-02-22022 February 1990 Part 21 Rept Re Solder Connections in Abb 27/59 Relays Deteriorated Due to Thermal Stress,Causing Bonding of Printed Wiring Pattern to Glass Epoxy Circuit Board.Interim Circuit Board W/Larger Pads & Higher Wattage Will Be Used ML18153C1011990-02-0202 February 1990 Part 21 Rept Re Two of Three Pc Cards in GE Type SLV11A1 Over/Undervoltage Relays Failing to Produce Output.Short Between Leads Would Result in Damage to Component 1C5. Sketch of Threshold Detection Board Encl ML17223A7451990-01-26026 January 1990 Part 21 Rept Re Backup Rings Furnished in Spare Parts Seal Kits & in 25 Gpm 4 Way Valves as Part of Actuators Made of Incorrect Matl.Rings Should Be Viton & Have Been Identified as Buna N ML20005G4391990-01-10010 January 1990 Provides Addl Info on Part 21 Rept Re Defect in Six Instrument Cracks.Licensee Will Not Assume Liability for Defects After Expiration of Warranty ML20005G6831990-01-0505 January 1990 Part 21 Rept Re Installation Instructions for Grommet Use Range for Patel Conduit Seal P/N 841206.Conduit Seals in Environ Qualification Applications Inspected for Proper Wire Use Range & Grommets Replaced ML19324C1131989-11-0202 November 1989 Part 21 Rept Re Defects in Instrument Racks for Use in Hatch,Inc Supplied Emergency Diesel Generator Starting Air & Lube Oil Sys.Verification of All Tube Fittings in Instrument Rack Completed & All Discrepant Fittings Corrected ML19325E0861989-10-16016 October 1989 Followup Part 21 Rept Re Class 1E Battery Chargers W/ Transformers Running at Temps Exceeding Those Used in Qualification Rept When Operating at or Near Full Load Rating of Equipment.Listed Corrective Actions Underway ML19351A2941989-10-0909 October 1989 Part 21 Rept Re Potential of Ambient Compensated Molded Case Circuit Breakers to Deviate from Published Info. Instantaneous Trip Check Will Be Instituted on All Class 1E Thermal/Magnetic Ambient Breakers Prior to Shipment ML19325C9521989-09-29029 September 1989 Part 21 Rept Re Potential Common Failure of SMB-000 & SMB-00 Cam Type Torque Switches Supplied Prior to 1981 & 1976. Vendor Recommends That Switch W/Fiber Spacer Be Replaced ML20248E0121989-09-13013 September 1989 Supplemental Part 21 Rept Re Potential Problem W/Six Specific Engine Control Devices in Air Start,Lube Oil, Jacket Water & Crankcase Sys.Initially Reported on 890429. California Controls Co Will Redesign Valve Seating ML20246P7111989-07-17017 July 1989 Part 21 Rept Re Quench Cracks in Bar of A-SA-193 Grade B7 Component.Quench Cracks Found in One Bar of Matl.Listed Purchasers Informed of Potential Defect.Next Rept Will Be Submitted When Addl Info Becomes Available ML20247D3011989-07-12012 July 1989 Part 21 Rept 10CFR21-0047 Re Control Wiring Insulation of Inner Jacket Used on General Motors Diesel Generator Sets Identified as 999 or MP Series.Encl List of Owners of Units Notified ML20245B6651989-06-15015 June 1989 Part 21 Rept 150 Re Potential Defect in Component of Dsr Standby Diesel Generator.Cause of Failure Determined to Be Combination of Insufficient Lubrication to Bushings.Listed Course of Action Recommended at Next Scheduled Engine Maint ML20246K7401989-04-26026 April 1989 Part 21 Rept Re Incorrectly Stamped Name Plates on Certain Asco Nuclear Qualified Valves.Vendor Will Contact Each Affected Facility & Furnish Correctly Stamped Plates & in Near Future Discontinue Sale of Rebuild Kits for Valves ML20244D8161989-04-13013 April 1989 Part 21 Rept Re Failure of Rosemount Transmitters.All Failed Transmitters Replaced,Inservice Test Procedure Prepared & Monthly Test of All 12 Transmitters in RCS Throughout Cycle 2 Operation Will Be Performed.Review Continuing ML20247P7991989-04-0404 April 1989 Part 21 Rept Re Atmospheric Dump Valves.Cause of Failure Speculative But Result of Piston Ring That Failed to Seal. Resolution to Problem Requires Increasing Pilot Valve Capacity & Reworking of Plug to Enlarge Pilot Flow Area ML20207N4641988-10-12012 October 1988 Part 21 Rept Re Potential Problem W/Emd 20-645E4,Type 999 Excitation Sys Circuit Breaker & Wiring.Potential for Field Circuit Breaker to Trip Due to Combined Air Temps & Field Current Exists at All Plants W/Model 999 Sys ML20205F3211988-10-10010 October 1988 Part 21 Rept Re Potential Deviation from Tech Spec Concerning Ry Indicators Due to Operating Temp Effect on Analog Meter Movement.Initially Reported on 881006.Customers Verbally Notified on 881006-07 ML20207P0451988-10-0505 October 1988 Part 21 Rept 146 Re Defect in Left Intercooler Inlet Adapter on Standby Diesel Engine Generator.Recommends Utils Inspect Left Intake Manifold Drain as Part of Operating Plan.Addl Info Expected by 881015 ML20207P0151988-10-0404 October 1988 Part 21 Rept Re Fuel Nozzle Tips in Standby Diesel Generator KSV-20-T W/Cracks Permitting Diesel Fuel to Be Sprayed Into Cylinders.Heavy Vapors Observed Emitting from Breathers on Some Cylinder Heads ML20245D9541988-09-0606 September 1988 Part 21 Rept Re Condition Involving Inconel 600 Matl Used to Fabricate Steam Generator Tube Plugs & Found to Possess Microstructure Susceptible to Stress Corrosion Cracking 1999-09-22 Category:TEXT-SAFETY REPORT MONTHYEARML20217B5401999-10-0606 October 1999
[Table view]Safety Evaluation Supporting Amend 193 to License DPR-40 ML20217G7461999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Cooper Nuclear Station LIC-99-0096, Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With ML20212K9781999-09-30030 September 1999 Safety Evaluation Accepting USI A-46 Implementation Program ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20211J9321999-09-0202 September 1999 Safety Evaluation Concluding That Licensee Proposed Alternatives Provide Acceptable Level of Quality & Safety. Proposed Alternatives Authorized for Remainder of Third ten- Yr ISI Interval for Fort Calhoun Station,Unit 1 ML20212C5001999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station LIC-99-0084, Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With ML20216E6431999-08-26026 August 1999 Rev 19 to TDB-VI, COLR for FCS Unit 1 ML20211D6491999-08-25025 August 1999 Part 21 Rept Re Nonconformance within LCR-25 safety-related Lead Acid Battery Cells Manufactured by C&D.Analysis of Cells Completed.Analysis of Positive Grid Matl Shows Nonconforming Levels of Calcium within Positive Grid Alloy ML20210R0381999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Cooper Nuclear Station ML20210R1961999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Fcs,Unit 1 ML20210J2921999-07-29029 July 1999 Special Rept:On 990406,OG TS & Associated Charcoal Absorbers Were Removed from Svc.Caused by Scheduled Maint on Hpci. Evaluation of Offsite Effluent Release Dose Effects Was Performed to Ensure Plant Remained in Compliance ML20210G2181999-07-27027 July 1999 Safety Evaluation Supporting Amend 192 to License DPR-40 ML20210D9951999-07-22022 July 1999 Safety Evaluation Supporting Amend 191 to License DPR-40 ML20216E6361999-07-21021 July 1999 Rev 18 to TDB-VI, COLR for FCS Unit 1 ML20209H8281999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Cooper Nuclear Station ML20211A9981999-07-12012 July 1999 Draft,Probabilistic Safety Assessment, Risk Info Matrix, Risk Ranking of Systems by Importance Measure LIC-99-0065, Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With ML20210R2081999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Fcs,Unit 1 ML20209E1061999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Cns.With ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20196B3851999-06-17017 June 1999 Summary Rept of Facility Changes,Test & Experiments,Per 10CFR50.59 for Period 970901-990331.Summary of Commitment Changes Made During Same Time Period Also Encl ML20210P5461999-06-0808 June 1999 Rev 0,Vols 1-5 of Fort Calhoun Station 1999 Emergency Preparedness Exercise Manual, to Be Conducted on 990810. Pages 2-20 & 2-40 in Vol 2 & Page 4-1 in Vol 4 of Incoming Submittal Not Included ML20207H7401999-05-31031 May 1999 Performance Indicators Rept for May 1999 ML20195K2851999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Cooper Nuclear Station.With ML20195B4581999-05-31031 May 1999 Rev 3 to CE NPSD-683, Development of RCS Pressure & Temp Limits Rept for Removal of P-T Limits & LTOP Requirements from Ts LIC-99-0053, Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 11999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 1 ML20195B4521999-05-17017 May 1999 Technical Data Book TDB-IX, RCS Pressure - Temp Limits Rept (Ptlr) ML20206P0481999-05-12012 May 1999 Safety Evaluation Concluding That NPP Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at CNS & Adequately Addressed Actions Requested in GL 96-05 ML20206L4241999-05-10010 May 1999 Safety Evaluation Supporting Corrective Actions to Ensure That Valves Are Capable of Performing Intended Safety Functions & OPPD Adequately Addressed Requested Actions Discussed in GL 95-07 ML20206M2601999-05-0606 May 1999 SER Concluding That Licensee IPEEE Complete Re Info Requested by Suppl 4 to GL 88-20 & IPEEE Results Reasonable Given FCS Design,Operation & History ML20206J0811999-05-0404 May 1999 Rev 14 to CNS QA Program for Operation LIC-99-0047, Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With ML20195E8621999-04-30030 April 1999 Performance Indicators, for Apr 1999 ML20206P9751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Cooper Nuclear Station ML20205Q5831999-04-15015 April 1999 Safety Evaluation Supporting Amend 190 to License DPR-40 LIC-99-0034, Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With ML20210J4331999-03-31031 March 1999 Changes,Tests, & Experiments Carried Out Without Prior Commission Approval for Period 981101-990331.With USAR Changes Other than Those Resulting from 10CFR50.59 ML20206G2641999-03-31031 March 1999 Performance Indicators Rept for Mar 1999 ML20205Q0891999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Cooper Nuclear Station.With ML20204G8951999-03-15015 March 1999 CNS Inservice Insp Summary Rept Fall 1998 Refueling Outage (RFO-18) ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20204B3701999-03-11011 March 1999 SER Accepting Third 10-year Interval Inservice Insp Plan Requests for Relief for RI-17,Rev 1 and RI-25,Rev 0.Request for Relief RI-13,Rev 2 Involving Snubber Testing & Is Being Evaluated in Separate Report ML20204C9751999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Cooper Nuclear Station LIC-99-0025, Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With ML20205J8181999-02-28028 February 1999 Performance Indicators, for Feb 1999 ML20207F3291999-01-31031 January 1999 FCS Performance Indicators for Jan 1999 ML20199E6751999-01-14014 January 1999 Monthly Operating Rept for Dec 1998 for Cooper Nuclear Station 1999-09-30 |
Text
-
TELEPHONE 347 5500 STROCTORAL ITEEL FA00lCAil0E Paxton & Vierling Steel Co. """'"*"" *""
E S iA B L i S H ED 1 8 85 P. O BO4 1085 Omaha, Nebraska 6sio November 8, 1982 United States Nuclear Regulatory 3. - r l-Commission Region No. 4 r
i
{V'47 \ %k'!l g,
l\yO
611 Ry laza Drive O ~$ O / 3'j 4 j Arlington, Texas 76011 Attention: Regional Administrator John Collins x]-
Re: Material Supplied Under Regulation 10CFR50, Appendix B Gentlemen:
This letter is to advise you that some material supplied by Paxton & Vierling Steel Co. may not be in com-pliance with all of the requirements of 10CFR50, Appendix B, Section VIII and 10CFR21, various sections.
The material in question has been supplied to Nebraska Public Power District, Brownville, Nebraska plant and Omaha Public Power District, Ft. Calhoun, Nebraska plant.
We have been and continue to remain in constant contact with the Quality Assurance departments of both NPPD and OPPD to resolve this nonconformance situation.
Very truly yours, PAXTON & VIERLING STEEL CO.
By ExeNutiveVicePresident Q RE0 wen /wa cc: Swarr, May, Smith,
\1 Andersen, & Jensen D.DuBois, USNRC NPPD, Brownville, Nebr.