Monthly Operating Repts for Catawba Nuclear Station for Jan 1994
ML20064H653
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 01/31/1994
From: Mcgraw E, Robert Williams
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9403180109
Download: ML20064H653 (13)


Text

W 11 -

l 4

Duke 1%wer Company Dertric Center l'Q Bar IW16 Charlotte, N C 18201-l(M16 DUKEPOWER February 15, 1994 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D.C.

20555 RE: Catawba Nuclear Station Docket No. 50 413 and 414

Dear Sir:

Please find attached information concerning the performance and operating status of the Catawba Nuclear Station for the month of Jar,uary,1994.

Very truly yours, S

(.,, 0.1NI8-ji //gy E. O. McCraw, Manager Operations, Performance & Automation E0M/ raw Attachments xc:

Mark Lesser Bob Martin Regional Administrator / Region II Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Washington, D.C.

20555 Atlanta, GA 30323 INPO Records Center Ms. Margaret Aucoin Suite 1500 Nuclear Assurance Corporation 1100 Circle 75 Parkway Suite 200 Atlanta, GA 30323 655 Engineering Drive Norcross, GA 30092 2843 American Nuclear Insurers

h. J. Freudenberger-c/o Dottie Sherman, ANI Library Senior Resident Inspector Town Center, Suite 300S Catawba Nuclear Station 29 South Main Street West Hartford, CT 06107 2445 940318o109 940132 PDR ADOCK 05000413

((1Y R

.PDR

~ ~ _ _

q,

jj 4

File: GS 801.01 U.S. NRC; Catawba

February 15. 1994 Page 2' bc
K. S. Canady (EC08H)

T. E. Mooney (EC05N)

B. J. Horsley (EC03U)

N. A. Rutherford (EC07I)

E. C. Fisher (MNS)

B. W. Walsh (PB02L)

Judy Smoak (CNS)

C. D. Denton (PB05E)

Candace Paton (PB02L)

D. R. Groux (0N01VP)

D. W. Denard (0N0102)

G. A. Copp (EC050) (File)

B. T. Faulkenberry (EC07C)

J. S. Forbes (CNS)

E. G. LaCasse (CNS)

Z. L. Taylor (CNS) 4

]

l l -

5

'I b,

= '

OPERAi!NS CATA REFORT DOCKET NO 50-413 DATE February 15. 1994 OPERATIE STAJjd

. COMPLETED BY R,A.Willins TELEFHONE 704-382-5346 1 Unit Nue: Catawba !

2. Reporting Feriod: January 1, 1994-January 31,1994
3. Licensed thermal Power (MWt):

3411

4. Naseplate Rating (Bress MWe):

13054 Notes tNaseplate Rating

5. Design Electrical Rating (Net MWe):

!!45

-(Bross MWe) calculated as

6. Muisua Dependable Capacity (Stoss MWelt 1192 1450.000 M'/A x.90 power
7. Maxieus Dependable Capacity (Net MWe);

1129 factor per Page ill, S. If Changes Occur in Capacity Ratings (itees Naber 3 Through 7) Since Last NURES-0020.

Reprt. Give Renons:

9. Few Level To W'nich Restricted, If Any (Net MWe):
10. Feason for Restrictions, if any:

This Month Yr.-to Date Cueulative

11. Hours in Reporting Ferico 744,0 744.0 75337.0
12. Nesber Of Hours Reartor Was Critical 717.6 717.6 56495.6
13. Reactor Reserve Shutdown Hours

--0--

--0--

--0--

14. hours Generator On-Line 706.1 706.1 55359.3'
15. Untt Rnerve Shutdm Hcurs -

--0--

0--

16. Brcss There11 Energy Generated (MWH) 2242449 2242448 179484984
17. fress Electrical Energy Generated (NHI 800859 800859 63164994
19. Net Electrical Energy Generated (MWH) 756810 756810 59301439
19. Unit Service Factor 94.9 14.9 73.5
20. Unit Availability Facter 94.9 94.9 73.5
21. Unit Capactly Fatter tusing MDC Net) 90.1 90.1 69.4

'~

22. Unit Capacity Factor (Ustng DER Net) 98.8 88.8 68.8

'23. Unit Forced Outage Rate 4.9 4.9 10.2

24. Shutdm Scheduled Over West 6 Months (Type, Date, and Duration of Eacht NONF
25. If Shut Down At End Cf Rep:rt Period. Estinated Date of Startup:
26. Units in Test Status iPrior to Coseercial Operation):

Forecut

-Achieved INiilAL CRITICALITY IMITIAL ELECTRICITY

. COMERCIAL OPERATION i

y----,

mi 2

4

~ -

1 OPERAllNS LATA REPORT 7

DOCKET NO 50-413 Uh!T Catawba 1 DATEFebruary 15. 1994' COMPLETESBY R.A. Williaes IELEPHONE 704-3B M 341 _

MONTH Jang31y,1974

[31 AVERASE DAILY POWER LEVEL EAY AVERABE DAILY PDWER LEVEL (MWe-Net)

(MWe-Net) 1 263 17 1111 2

741 10 1118 13

' 992 19 1110 4

4 1093 20

!!23 5

(1.64 21 1132 E6 Ji63 22 1141 8

1159 24 1137 9

Ilfr2-25

___.1126 10 I L62.

26 1134 1070 27

!!37 la 0

28 1137

.13 122 29 1138 14 1067 30 1140

-13

!!33 31 1141 16 1135 1

  1. F V'

+

4. -

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.-

50-413-

~

UNIT NAME uarnwesa 1 DATE uz/id/94: __

REPORT MONTH January 1994 COMPLETED BY x.

A.

W1111ams.

~

TELEPHONE i/us)-sez-dead

.f (1)

(2)

(3)

(4)

(5)

R MET-I E

HOD T

A OF LICENSE

' N' Y

S SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO

'DATE E

HOURS N

R/X NO.

CODE

. CODE PREVENT RECU"dENCE

]

1-94 1-S 1.25 B

HA TURBIN TURBINE OVERSPEED TRIP TEST 1-P 94-1 1

S A

RC XXXXXX HOLDING AT 30% POWER FOR CORE FLUX MAPPING P 94 1 S

B IA INSTRU HOLDING AT 50% POWER-'FOR CALIBRATION OF NUCLEAR INSTRUMENTATION SYS m1 POWER RANGE 3-P 94 2 S

A RC XXXXXX HOLDING AT 75% POWER FOR CORE FLUX MAPPING 2

94-1-11

_F 36.70 A

3 HH TURBIN REACTOR / TURBINE TRIP DUE TO LO VACUUM TRIP

~4-P 94-1-13 S

-A IA XXXXXX HOLDING AT 13% POWER FOR NI SYSTEM THERMAL POWER. MISMATCH (1)

(2)

(3)

(4)

~

F Forced-Reason-Method:

Exhibit G - Instructions

.S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File.- (NUREG-0161)

E-Operator Training & License-Examination F-Administrative (5)

G-Operator Error (Explain)

Exhibit I - Same Source H-Other,(Explain)-

_,b

~., ~.

6 DOCKET: 50-413 UNIT: Catawba 1 Date:.'02/15/94 NARRATIVE

SUMMARY

MONTH: January 1994 Catawba Unit 1 began the month of January with the turbine overspeed trip. test outage. The unit was placed back on-line on 01/01 at 0115. During power escalation,

. the unit held power at 30% power for core flux mapping on 01/01 from 0650 to'1145.

The unit held at 50% power on 01/01 at 2100 to Ol/02 at 0123 for calibration of nuclear instrumentation system power range. The unit was held at 97% power for delta T evaluation on 01/04 at 1132. The unit experienced an reactor / turbine trip due to low vacuum on 01/11 at'2259 and the unit was placed back on-line on 01'/13'at 1141.

The unit was held at 13% on 01/13/94 at 1155 due to nuclear sinstrumentation system.

thermal power mismatch. The unit held at 97.5% power from 01/14 at 1006 due to reactor coolant flow. Tne unit reached 100% power 01/21 at 1100. the unit operated at or near 100% full power the remainder of the month.

i G

Prepared by: R. A. Williams Telephone:

704)-392-5346

(

a y

.w-+

-m

,.r

.s.[

___.,__._______.m________E____

- t i

MfdiTJLY REFUEldl{G INFORM / TJ_QF REOUPEf t

1.

Facility name: QttmLthb Unit 1 2.

Ocheduled next refueling shutdown: fidira m l y W sui 3.

Scheduled rentart following refueling: hpril 1995 4 -

THE PROJECT MANAGER HAS DEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.

C11ANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4

THROUGH 6 WILL NO LONGER BE MAINTAINED IN TIIIS REPORT.

4.

'Will refueling or resumption of operation thereafter require a technical opecification change or other licence amendment?

IE yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?.

5.

Scheduled date(s)'for submitting proposed licensing action and upporting information.

6.

Important licensing considerations (new or different deaign or nupplter, unreviewed design or performance analysis methodo, significant changen in design or new operating procedures),

7.

Number of Fuel assemblies (a) in the core: 193 (b) in the opent fuel pool: 484 8.

Preaent licensed fuel pool capacity: 1AM Size of requested or planned increase:

9. Projected date of last refueling which can be accommodated by present licenced capacity: Eptembitr_2009 DUKE POWER COMPANY

- DATE:

ffhnwry 15. 11Mti Name of

Contact:

II.mA. Wuliargia Phone:

( 7 0 4 ) - 3 8 2 -J> 3 4 6

-s e

-m

,or-

s.

OPERATING DATA REPORT DOCKET N0 50-414 DATE February 15. 1994-OPEPAILNjjMM COMPLETED BY R.A. Willians TELEPtICNE 704-382-5346

1. Unit Naae Catanba 2
2. Reprirting Period: Jarcary 1,199Haruary 31,19%
3. Licensed Thersal Power (MW'):

3411 4, Naseplate Rating (6tess MWe):

1305*

Notes

  • Nameplate Rating
5. Design Electri.al Rating (Net MWeh 1145 (Gross NWe) calculated as
6. Maxisaa Dependable Captity (Bress MWeh 1192 1450.000 MVA x.90 poner
1. Maxisua Dependable Capacity (Net MWelt

-1129 factor per Page iii,

8. If Changes Oc wr in Capaa ty Ratings (!tess Number 3 Threugh 7) Since Last NUREG-0020.

Report, Gr<e Reasons:

9. Power level To Which Restricted, If Any (Net MWelt
10. Reason for Restrictions, If any:

ThisMonth Yr.-to-Date-Cuaulative

!!. Hours in Reporting Period 744.0

'744.0 45353.0-

12. Nuber Of Hours Reactor Was Critical 744,0 744.0-50694.9
13. Reactor Reserve Shutdown H urs

--0--

--0-- -

14 ~ Hours Gemator On-Line 709.5 709.5 49789.0-

15. Unit Reserve !butdown Hours

--0--

--0--

--0--

16. Gross ineraal Energy Generated IMWM) 2283587 2233537 159172626
17. Gross Electrical Energy Ger.erated (MWHJ 921393 821393 56398652 i
16. Het Electrical Energy Gererated JMPH 778089 7730B9 53068146
19. Unit Service factor 95.4 95.4 76.2 20.UnitAvailabilityfactor 95.4 95.4 76.2
21. Unit Cap tity Factor (Using h0C Net) 92.6 92.6 71.7
22. Unit Capacity Factor (using DER Net) 91.3 91.3 70.9 l
23. Unit Ferced Outage Rate' i.6 4.6 9.6
24. Shutdown Scheduled Over Next 6 N aths (Type, Date, and Duration of Each):

_Rafnaling r_ApttL29J994 - 60_ days

25. If Shut Conn At End Of Report Period. Estinated Date of Startup
26. Units to Test Status (Pncr to Coesercial Operatien):

Forecast Achieved-l l'

INiilAL CRITICAll1Y INii!AL ELECTRICITY

~ COMP RCIAL OfERATION v

-o..

-,_m

+

.r-

+

v

..._m

_..m 4

4 OPERATIN3 CATA REFORT

. DOCKET NO 50-414 UNIT Catanba 2 DATE February 15, 1994 COMPLETED BY R.A. Willians TELEPHONE 704-332-5346 f

MONTH Jyuary,1994 ply AVERAGE dally POWER LEVEL D

AVERASE DAILY POWER LEVEL E

(MWe-Net)

(MWe-Net) 1 1124 17

!!56 2

993 la

!!55 3

829 19 1156 4

!!39 -

20 1157 5

1160 21 1150 i

'6

}J_59 22 1156 7

j]33 23 IH7 G

115E 24 1153' 9

IH1 25 1154 10 1157 26

!!52 1t 1156 27 1156 12 912 28 1152 13 0

29 1153 14 371 30 1155 15 1000 31 1156 1155 4

,,a.

7

,e,-

m 2

J

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-414 I

UNIT NAME u1Awoa z DATE uzf13/94 REPORT MONTH January 1994 COMPLETED BY x.

A.

w1LLland TELEPHONE t/usy-auz-nago, 3

(4)

(5)

(1)

{2)

E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 1

94-1-12 F

34.52 A

HH HTEXCH TURBINE TRIPPED ON LOW CONDENSER VACUUM A

HG XXXXXX HOLD AT 34% POWER FOR SECONDARY 1-P 94-1-14 F

CHEMISTRY ethod:

ibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data Forced eason-2-Manual Scram EntW Sheets For Licensee B-Maintenance or test 3-Automatic Scram Event Report (LER (NUREG-0161))

C-Refueling Restriction 4-Other (Explain)

File D-Regulatory E-Operator Training & License Examination F-ALministrative (5)Exhibit I - Same Source G-Operator Error (Explain)

H-Other (Explain) i

lfp F.

DOCKET: 50-414 UNIT: Catawba.2 Datas 02/15/94 1

NARRATIVE

SUMMARY

MONTH: January 1994 Catawba Unit 2 began the month of January operating at 100% full power.

The turbino tripped on low condenser vacuum on 01/12 at 0950. The reactor was held at 2% powerL for investigation into loss of vacuum. The unit returned to service on 01/13 at 2021. The unit held at 34% power on 01/14 at 1830 due to secondary chemistry. The unit returned to 100% power on 01/15 at 1400 an remained at or near 100% power the

- romainder of the month.

Prepared by: R. A. Williams Telephones (704)-302-S346 b

l

- i i

f w

M nw -

'-w~s~

r e

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name: Catawba.

Unit 2 2.

Scheduled next refueling shutdown: April 1994 3.

3 heduled restart following refueling: June 1994 d ; tic PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.

CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4

THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter requireLa~

technical specification change or other licence amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

q 5.

Scheduled date (s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

f 7.

Number of Fuel assemblies (a) in the core: 193 (b)

.in the-spent fuel. pool: 356 8.

Present licensed fuel pool capacity: 1418 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity: Sentumber 2011 DUKE POWER COMPANY DATE:

February 15. 1994 Name of

Contact:

R.

A.

Williams Phone:

(704)-382-5346 5-6

'l l

c.-

.' e' CATAWBA NUCLEAR STATION MONTifLY OPERATING STATUS REPORT December 1993 1.

Personnel Exposure -

The total station liquid release for December has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total-station gaseous release for December'has been compared with the Technical Specifications. maximum annual, dose commitment and was less than 10 percent of this limit.

v

.