MONTHYEARML19341C5221981-02-25025 February 1981 Forwards Addl Info for Tech Spec Change Request 28,re App J Containment Testing Requirements,Per 810127 Request Project stage: Other ML20004E9951981-06-0909 June 1981 Discusses Position on Reduced Duration Containment Leak Rate Test Period.Duration Should Not Be Less than 24-h Unless Experience of at Least Two Prior Tests Provides Evidence of Adequacy of Shorter Test Duration Project stage: Other IR 05000266/19810231982-01-28028 January 1982 IE Insp Repts 50-266/81-23 & 50-301/81-23 on 811201-31. Noncompliance Noted:Failure to Follow Maint Procedure Project stage: Request ML20050B3671982-03-26026 March 1982 Forwards Summary of Types A,B & C Refueling Containment Penetration Leak Tests for Various Periods Between Oct 1974 & Oct 1981,per Tech Specs Section 15.4.4.I.D & Section V.B of 10CFR50,App J.No Noncompliance Noted Project stage: Other ML20054K6581982-06-25025 June 1982 Notice of Issuance & Availability of Amends 61 & 66 to Licenses DPR-24 & DPR-27,respectively Project stage: Other ML20055A3211982-06-25025 June 1982 Exemption from Section 50.54(a) & 10CFR50,App J Re Type C Substitution for Type a Testing Requirements of Svc Air Supply Sys,Hydrostatic Testing Instead of Type C Testing for Decay Heat Removal Sys & Type a Test Sequence Methodology Project stage: Approval ML20055A3231982-06-25025 June 1982 Safety Evaluation Supporting Exemption from Section 50.54(a) & 10CFR50 App J Project stage: Approval ML20054K6551982-06-25025 June 1982 Safety Evaluation Supporting Amends 61 & 66 to Licenses DPR-24 & DPR-27,respectively Project stage: Approval ML20054K6531982-06-25025 June 1982 Amends 61 & 66 to Licenses DPR-24 & DPR-27,respectively, Providing Primary Containment Integrated Leak Rate Test Requirements & Schedules Project stage: Other ML20062K1691982-07-31031 July 1982 Rept of Reactor Containment Bldg Integrated Leakage Rate Test for Point Beach Unit 2 Project stage: Other ML20062K1531982-08-11011 August 1982 Forwards Rept of Reactor Containment Bldg Integrated Leakage Rate Test for Point Beach Unit 2 Project stage: Other ML20062K5551982-08-13013 August 1982 Discusses Plans & Tech Spec Changes for Compliance W/Requirements of 10CFR50 App J,Per .Full Compliance Re Plant Design Mods to Containment Spray Sys Will Be Achieved by Mar 1983 Project stage: Other ML20065S0761982-10-0404 October 1982 Notice of Issuance & Availability of Amends 64 & 69 to Licenses DPR-24 & DPR-27,respectively Project stage: Other ML20065S0671982-10-0404 October 1982 Safety Evaluation Supporting Amends 64 & 69 to Licenses DPR-24 & DPR-27,respectively Project stage: Approval ML20065S0631982-10-0404 October 1982 Amends 64 & 69 to Licenses DPR-24 & DPR-27,respectively, Modifying Operation & Surveillance Testing Requirements of Containment Purge Supply & Exhaust Isolation Valves & Terminology of Tech Spec 15.4.4 on Testing Project stage: Other ML20027D1381982-10-21021 October 1982 Tech Spec Change Request 82,changing Requirements for Periodic Leakage Rate Testing of Containment Air Lock Doors Project stage: Other ML20027D1331982-10-21021 October 1982 Application to Amend Licenses DPR-24 & DPR-27,changing Tech Specs Re Requirements for Periodic Leakage Rate Testing of Containment Airlock Doors.Class I & II Amend Fees Encl Project stage: Request ML20064G0101982-10-24024 October 1982 Proposed Tech Spec Re Leakage Testing of Containment Purge Supply & Exhaust Valves Project stage: Other ML20064F9911983-01-0404 January 1983 Forwards Tech Spec Basis Change Re Leakage Testing of Containment Purge Supply & Exhaust Valves.Test Will Be Conducted Per Tech Spec 15.4.4.II, Type B Tests, Measuring Leakage Across Individual Pressure Boundaries Project stage: Other ML20069J0301983-04-0101 April 1983 Notice of Issuance & Availability of Amends 70 & 75 to Licenses DPR-24 & DPR-27,respectively Project stage: Other ML20069J0171983-04-0101 April 1983 Amends 70 & 75 to Licenses DPR-24 & DPR-27,respectively, Modifying Requirements for Periodic Leak Rate Testing of Containment Airlock Doors Consistent w/10CFR50,App J Project stage: Other ML20069J0271983-04-0101 April 1983 Safety Evaluation Supporting Amends 70 & 75 to Licenses DPR-24 & DPR-27,respectively Project stage: Approval 1982-03-26
[Table View] |
Text
f Wisconsin Electnc mmcower 231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEE, WI 53201 August 11, 1982 Mr. H.
R.
Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C.
20555
Dear Mr. Denton:
DOCKET 50-301 POINT BEACH NUCLEAR PLANT, UNIT 2 FACILITY OPERATING LICENSE DPR-27
SUMMARY
TECHNICAL REPORT OF TYPE "A",
"B",
AND "C" CONTAINMENT LEAK TESTS In accordance with Section 15.4.4.I.D. of the Point Beach Nuclear Plant Technical Specifications and Section V.B. of 10 CFR 50 Appendix J, the following summary technical reports are submitted on the Type "A" containment integrated leakage rate test conducted during the April 1982 Unit 2 refueling shut-down and on Type "B" and "C" leak tests during the Unit 2 refueling shut-downs of March 1978 through April 1978, March 1979 through April 1979, April 1980 through May 1980, and April 1981 through May 1981.
The Type "A" test was performed by the Quadrex Corporation of Tulsa, Oklahoma for Wisconsin Electric.
We have reviewed and approved their report and have enclosed a summary report prepared in accordance with the format specified in ANSI /ANS 56.8 - 1981.
The complete report, which includes all procedures, equipment calibrations, test data, and results, will be retained by Wisconsin Electric and is available for NRC review at the plant.
A routine, announced NRC inspection by Mr. I.N. Jackiw was conducted during the performance of the Type "A"
integrated leakage rate test.
No items of non-compliance or deviations were identified.
Summary of Data The overall as-found leakage of the Type "A"
test was 0.1959% by weight per day of the containment atmosphere, or 97.5%
of the allowable rate.
The overall as-left leakage of the Type "A"
test was 0.0508% by weight per day of the containment atmosphere, or 25.3% of the allowable rate.
This includes the addition of the local tests of those penetrations which were not vented during the conduct of the Type "A" test in accordance with Appendix J to 10 CFR 50, Section III.A.l.d.
8208170066 820811
\\(L PDR ADOCK 05000301 P
PDR
Mr. II.
R. Denton August 11, 1982 The overall as-found leakage of Type "B" and "C" tests conducted during the 1978 refueling was 43,223 cc per minute, or 18.7% of 0.6 La described in Section III.C.3 of Appendix J to 10 CFR 50.
Af ter repairs the overall leakage was 6,921 cc per minute, or 3.00% of 0.6 La.
The overall as-found leakage of Type "B" and "C"
tests conducted during the 1979 refueling was 376,819 cc per minute, or 163.05% of 0.6 La.
After repairs the overall leakage was 6,057 cc per minute, or 2.62% of 0.6 La.
The overall as-found leakage of Type "B" and "C" tests conducted during the 1980 refueling was 194,591 cc per minute, or 84.20% of 0.6 La.
After repairs the overall leakage was 2,957 cc per minute, or 1.28% of 0.6 La.
The overall as-found leakage of Type "B" and "C" tests conducted during the 1981 refueling was 47,449 cc per minute, or 20.53% of 0.6 La.
Af ter repairs the overall leakage was 5,603 cc per minute, or 2.42% of 0.6 La.
All Type "B" and "C"
test results obtained between the aforementioned refueling periods and prior to the Type "A"
test of April 1982 comprise Enclosure 1 to the attached report.
All similar test data obtained during each of the aforementioned refueling periods comprise Enclosure 2. contains comments made in regard to all as-found leakage rates which approach or exceed 0.6 La.
Very truly yours, W#'
Assistant Vice' President C.
W. Fay Enclosures Copy to NRC Resident Inspector