ML20064F958

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Table 15.3.5-3,Line Item 3.b.i, Reflecting Removal of Double Asterisk,Removing Proposed Requirement to Place Inoperable Channel in Trip within One Hour
ML20064F958
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/08/1994
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20064F942 List:
References
NUDOCS 9403150507
Download: ML20064F958 (1)


Text

- - .

e

~

TABLE 15.3.5-3(continued)

EMERCENCY COOLINC ENGINEERED' SAFETY FEATURES I

1 2 3 4 '

NO. OF MINIMUM PERMISSIBLE .

NO. OF CHANNELS OPERABLE BYPASS OPERATOR ACTION IF CONDITIONS NO. FUNCTIONAL UNIT CHANNELS TO TRIP CHANNELS CONDITIONS OF COLUMN 3 CANNOT BE MET

b. Trip of Doth Main Fcedpumpo 2/p=p 1/p=p 1/ pump Rccctor Powcr IIct Shutdowr"*

Startc !"Otcr Deiven P=pc is Lccc Than 40%

L

b. Start Turbine-Driven Pump
i. Undervoltage on 4KV Buses (A011s'% A02). 2/each 1/ehch 1/each Be in hot shutdown in 9 bus' bis' bus i

ii. Low Low Steam Gen. '

Water Level 3/SG 2/each 2/SG" Be in hot shutdown in 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />' SG

4. SAFETY-RELATED ELECTRICAL BUSES LOADS
a. 4.16KV Buses
i. Degraded Voltage 3/ bus 2/ bus 2/ bus" ***

ii. Loss of Voltage 2/ bus 1/ bus 1/ bus ***

b. 480V-Buses
1. Loss of Voltage 3/ bus 2/ bus 2/ bus" Be in hot shutdown in 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> *
  • If minimum conditions are not met within 24-hours after reaching hot shutdown, the unit shall be in cold shutdown within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of'the event causing the unit shutdown.

W IIf)Rchanns15isidleEermined5tolbelTn;dperablhiffesultsingjidlodsMssslltihanNtheitotalldumberTlof thannels]beingic,arableZpowerdoperationimapcont'inuebifttheAfollowingfconditionssarefmeti

^

1b JThe2 mini:Mminumber ?ofAopefablelchannelsElsystilnsatiisfied. '

2b SThelaffected?channelSis"placedsinstrip3withinb1Ghouri Normal"ooeratiion 'isjallowed providediboth~ diesel"g'ensrStbrs~'Ne available and the associated diesel

~

000 generator is operFting~dnd~providing' power to.the affected safeguards bus. - If tihsse minimum conditions are not_ met within 7 days, the affected unit shall be placed in hot sh6tidown.

0000 Both swit ches must be activated simultaneously. ,

\

9403150507 9403Og "

PDR ADOCK 05000266-P PDR .

q p ---'e =--Duig- e 4s .vrum.u. wi 'u a -

.."e-i 5 ww-u m- m m Ms-o' syy .r eeer.ve, M e - s% -- w m v i ee+w6