Responds to NRC Re Violations Noted in IE Insp Rept 50-395/82-52.Corrective Actions:Operations Personnel Instructed to Maintain Average Temp & Pressurizer Level Constant During Performance of Test STP-114.002
ML20064C894
Person / Time
Site: Summer 
Issue date: 12/01/1982
From: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20064C871 List:
References
NUDOCS 8301040507
Download: ML20064C894 (2)


Text

s 0

SOUTH CAROLINA ELECTRIC & GAS COMP'ANY -

POST OFFICE 764 COLuusiA. south CAROLINA 29218 O. W. DixoN. JR.

{f

{

.)

ViCE PRESIDENT NUCLE AR OPERATIONS December 1, 1982 Mr. James P.

O'Reilly, Director U.

S.

Nuclear Regulatory Commission Region II, Suite 3100 101 Marietta Street, N.

W.

Atlanta, GA 30303

SUBJECT:

Virgil C.

Summer Nuclear Station Docket No. 50/395 Ope rating License No. NPF-12 Notice of Violation NRC Report 82-52

" Reactor Coolant System Leakage Test"

Dear Mr. O'Reilly:

Please find attached South Carolina Electric and Gas Company's response to the Notice of Violation as addressed in Appendix A of NRC Inspection Report 82-52.

If there are any questions, please call us at your convenience.

Ver truly yours, O.

W.

Dixon, J r.

ARK:OWD:dwr Attachment ec:

V.

C.

Summer A.

R.

Koon T.

C.

Nichols, Jr.

H.

Radin G.

H.

Fischer Site QA 0.

W.

Dixon, Jr.

C.

L. Ligon (NSRC)

H.

N.

Cyrus G. J.

Braddick H.

T.

Babb J.

L.

Skolds D.

A.

Nauman J.

B.

Knotts, Jr.

M.

B.

Whitaker, Jr.

B.

A.

Bursey W.

A.

Williams, J r.

I&E (Washington)

O.

S.

Bradham Document Management Branch R.

B.

Clary NPCF M.

N.

Browne File l

i 8301040507 821213 l

PDR ADOCK 05000395 O

PDR

lik Mr. James P.

O'Reilly NRC Notice of Violation NRC Report 82-52 December 1, 1982 ATTACHMENT I RESPONSE TO NOTICE OF VIOLATION INSPECTION REPORT 82-52 I.

ADMISSION OR DENIAL OF THE ALLEGED VIOLATION South Carolina Electric and Gas Company is in agreement with the stated violation.

II.

REASON (S) FOR THE VIOLATION The reason for the stated violation was that the Surveillance Test Procedure (STP-ll4.002) was not adequate for performing Technical Specification Surveillance item 4.4.6.2.l(d), " Reactor Coolant System Water Inventory," as intended.

The subject surveillance test procedure (STP) contained an initial condition which required the Reactor Avg be maintained +1 F; however, Coolant System (RCS) T no adjustment in leakage rates for RCS temperature change, orloggingofTy$ished.to ensure that temperature did not A

change was accomp Also, the STP required recording of pressurizer level at the start and end of the test, but did not make adjustments in leakage rates for changes in pressurizer level.

III.

CORRECTIVE STEPS TAKEN AND RESULTS ACHIEVED Upon notification of this condition by the NRC Inspector, immediate corrective action was taken to instruct operations personnel to maintain TAvg and pressurizer level constant during performance of the STP.

i IV.

CORRECTIVE ACTION TAKEN TO AVOID FURTHER VIOLATION The subject surveillance test procedure (STP-114.002) has been revised to adjust leakage rates for changes in Tayg and pressurizer level.

Additionally, density compensation for changes related to pressurizer level and Ayg is used to normalize the leakage results.

T V.

DATE OF FULL COMPLIANCE l

Full compliance has been achieved.

STP-114.002 was revised and issued for implementation on November 19, 1982.