Monthly Operating Rept for Sept 1978
ML20064C644
Person / Time
Site: Oyster Creek
Issue date: 10/12/1978
From: Mcclain C
JERSEY CENTRAL POWER & LIGHT CO.
To:
Shared Package
ML20064C637 List:
References
NUDOCS 7810230261
Download: ML20064C644 (26)


Text

.

OPERATING DATA REPORT I)OCKET NO. 50-219

  • DATE 10/12/78-COMPLETED BY C. M. McClain TELEPilONE 201-4 %-8200 -

OPERATING STATUS Ovster Creek #1 N"I'5

1. Unit Name:
2. Reporting Period: September i978 -
3. Licensed Thennal Power (MWt): 1930- .. . ;., $5p . ,.a r-
4. Nameplate Rating (Gross MWe).

650 . - nd --

5. Design Electrical Rating (Net MWe): 650
6. Maximum Dependable Capacity (Gross MWe): 650 -
7. Maximum Dependable Capacity (Net MWe): 620
8. If Changes Occur m Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:

t

9. Power Lesel To Which Restricted.lf Any (Net MWe):
10. Reasons For Restrictions. lf Any:

This Month ..

Yr. to.Date . . . Cumulatise >

l1. Hcurs in Reporting Period 720.0 6,551.0 76,895.0

12. Number Of Hours Reactor Was Critical ._ 343.7 6,105.4 60,510.0
13. Reactor Resene Shutdown Hours 0.0 0.0 468.2
14. Hours Generator On.Line 331.6 6,069.0 59,340.3
15. Unit Reserve Shutdown Hours 0;0 0.0 0.0
16. Gross Thermal Energy Generated (MWH1 430,036.0 10,277,193.4 99,267,730.7 -

i 17 Gross Electrical Energy Generated (MWH1 141,470.0 3,522,180.0 33,879,515 T

18. Net Electrical Energy Generated (MWH) 133,258.0 3,396,123.0 32,668,231.0 7
19. Unit Service Factnr 46.1 92.6 77.2' j
20. Unit Availability Factor 46.1 92.6 77.2
21. Unit Capacity Factor'(Using MDC Neti 29.9 83.6 70.4 -
22. Unit Capacity Factor (U>ing DER Net) 28.5 79.8 _ 65.4
23. Unit Fnrced Ontage Rate 7.9 2.t) 5.2 -
24. Simidowns Scheduled User Next 6 Months (Type. Date.and Duration of Eacht:

Refueling.* maintenance outage began on September 16, 1978.

25. If Shut Down At End Of Report Period, theimated I> ate'of Startup: November. l'1, 1978
26. Units in Test Status Irrior to Commercial Operationi: Forceast Achiesed INITI A L CRITICA Lil Y INITIA1. ELECTRICITY j COMM LRCIA L OPER A IlON

- l h h M O eN/ k -

(" '" l i

. _ - _ ___ ___ _ _ - __ _ - - _ _- . _ _ _ - - _ _ _ . - = _ _ , . . _ _ _ . . ~ _ _ - - - .

o

  • AVI It At.1: D All Y llNil POWI It I l.Yl.l.

nocxEl No. 50-219 UNil -Oyster Creek #1 DATE .10/12/78 COMPLETED BY C. M. McClain TELEPHONE 201-455-8200 Ext. Plaza 244 MONTH September 1978 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) (MWe Net) i NI9 17 0 i 2 -4I7 18 0 3 41 4 19 0

.: 140 20 0 5 163 0

~

6 431 22 0 7 197 23 0 i 8 409 24 0 9 413 25 0 l

10 410 26 0 11 407 27 0 l

404 23 0 13 405 0 29 y 408 0 /

39 i is 388 3, 16 0 INSTRUCTIONS On this format. list the arcrage daily unit power lesel ni \tWe Net for cach day in the reiinstmp month. Compute io the nearest whole megawatt.

I (Ol771 L -

m -

DOCKET NO. 50-219 UNIT SilUIDOWNS AND POWER REDUCTIONS UNIT NAME _0yster Creek fl DATE 10/12/78 .

COMPLETED BY' C. H. McClain REPORT MON Til' SeDtember 1978 TELEPHONE 201-455-8200 Ex6. Plaza 244 n.

- E E

-, .3E 3 .$ Y 5' Licensee ,E -r, 'f~,,

a2 Cause & Cr: retine

%. Date

- BE i iE5 Evens N0 s?

Aci;on to

]8 $ Report !0 Prevent Recurrense

, 3 dc=!

I 7 780904 F 28.4 A .3 N/A CH INSTRU Mal function of feedwater control system. Feedwater master controller failed due to a ground in the level recorder. The necessary repairs were made and plant operations was resumed. -

8 780915 s 360.1 S 1 N/A ZZ ZZZZZZ Refueling / maintenance outage.

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S. Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data '

B-Maintenance of Test 2-Manual Scram. Entr> Sheets for Licensee C Refueling . 3 Automatic Scram. Event Report iLt.Rl Fde eNt: REG-D Regulatory Restriction 4-Other I Explain) 0161)

E-Operator Training & License Examination F Administrative 5 G Operational Eiror IExplam) Exhibit I - Same Sourse l's/77) Il-Other IE xplain)

Oyster Creek Station #1 Docket No. 50-219 i

GPERATIONS

SUMMARY

- SEPTEMBER 1978 (

At the beginning of the report period, the unit was operating at approximately

69% power in an end of cycle reactivity coastdown with control rod withdrawal i limited by the' Technical Specifications. On September 4,1978, a turbine trip and reactor scram occurred when the feedwater master controller failed -

due to a ground in the level recorder. The unit was returned to service on ,

September 5 following repairs to the feedwater controls. l i

On September 15, 1978, the unit was shut down to commence refueling operations. '

Refueling continues at the end of this report period. , i 1

Six (6) Reportable Occurrences were identified during the report period:

d R0 #78-15 occurred during the post scram period on September 4 when both isolation condensers isolated by actuation of their line break sensors. .

R0 #78-16 was identified on September 14 and involves failure to ,

inspect two (2) hydraulic shock and sway arrestors as required.

R0 #78-17 occurred on September 14 when the closed position torque switch on isolation condenser valve V-14-37. failed, tr,ipping.the. motor .

overloads.

R0 #78-18 occurred on September 16 when three (3) main steam isolation (

valves failed to meet the maximum allowable leakage rate. l RO #78-19 occurred on September 15 when two (2) reactor building to  ;

torus vacuum breaker valves malfunctioned during operability testing. l

( R0 #78-20 occurred on September 17 when two (2) intermediate range I

flux monitors became inoperable in the refuel mode. -l

[

_ l

,, e f

i I

i ,

I t

?

I

7

^ ~ Oyster Creek Station #1 i Docket No. 50-219 , .

INSTRLNENT CORRECTIVE MARTIDWCE OF GASL ITDiS FOR THE MONril OF SEPTDiBER,1978

.; Item # I. Fguignent Malfunction Corrective Action -

1 Waste Concentrator level Recorder will not Repaired broken wire in Ievel Recorder advance in chart drive motor -

2 Isolation Condenser Inoperative Replaced defective notor Shell. Side 'Ibnp. Recorder assembly 3 Main Steam Line Monitor reading low - < > Repaired nonitor as per

bbnitor i1-4 procedure 721.3.001 4 Beactor Invel Recorder responsible for Replaced with calibrated recorder 1D-14 Rx scram on 9/5/78 recorder 5 IBM Channel 14 Surveillance discrepancy Calibrated nean square analog noter reading not within unit as per instruction tech 40% + 1% manual No. GEK857, readjusted I the (125%-40%) reading to  !

, meet tech specs 6 IRM Channel 16 Detector inoperative Installed new detector as per

. procedure 720.3.002 7 SRM Surveillance No lights on 4P i Changed defective dual trip t step 6:10 unit (17. Readjusted and .

tested as per procedure 721.3.001 8 .

Fuel Pool Recorder String on recorder broken Replaced string and calibrated 4

I l

f 8

s S. %


,..,_-%. - . v - - - - w --i e--r-w--.--u--=,. ,,--c--o w v-n---- - - - - - + - -r---- ----ee r, m -y--m -

_w -- r + = - - - =-e y- -,erv vw,n.--,, * --- - - - r--* ,,r,- , m2v,--g--- - --. -,- -----y

^ i Oyster Creek Station #1 Docket No. 50-219 , ,

MBCilANICAL CORRECTIVE MAINIDWKE OF OASL ITEMS FOR 'IIIE MONTil OF SEPTEFBER,1978 ,

Item # ELIniprent Malfunction Corrective Action 1 Fuel Fool Bridge Fuel grapple sticking Inspt M. grapple and tightened guide shces 2 1-2 Fire Ptmp Icak on cooling water Replaced 5' of pipe,1 1/2" inlet line schedule 80 3 V-ll-17, makeup valve Valve not closing Installed new valve stem, to fuel pool off properly diaphragm, and bushing 4 CRD Mxlule 34-31 V-107 Ilandwheel missing Installed new stem and handle 5 Fire Diesel 1-2 Oil terrperature and coolant Installed ncw thermostat and terrperature did not achieve tested OK mininun specifications as I per procedure 645.4.001 6 Fuel Pool Filter Filter elments suspected Installed new filter elements of failing Repaired oiler on both bearings 7 Radwaste centrifuge East bearing leaking oil 8 CRD 34-19 V-lll valve leaking Replaced V-lll valve with rebuiit v1 9 Snubbers - Accmulator levels on Checked accuuulator levels and Beactor Bldg. w rtain snubbers did not added or drained oil as necessary conform to procedure on last inspection I

't. %

-w - .

Oyster Creek Station il .

Docket tio. 50-219 ELECTRICAL CORRECP1VE 1%INTE2mNCE OF QN3L-ITOG mR 'nE MOtml OF SEPI124BER,1973 1

Item i Equignent Malfunction Corrective Action -

1 Belay 6K59 Pelay appears to be buzzing Feplac M faulty relay with

  • same type .

2 Dnergency Condenser, Screw on torque switch was Adjusted switch and tightened <

Isolation Valve V-14-37, loose causing "close" screws "Close" limit switch torque switch to move s failed to drop out contactor tripping r

overload i 3 6Kl7 Belay, Control .

Relay buzzing Changed out relay Ibom Panel llF ,

4 #2 Diesel Generator Did not trip at 500 IM, Idjusted rack switch in l tripped at 50 KW governor actuator and tested satisfactorily i

e e

i

?

r 4

i

. 's I

Oyster Creek Station #1 .

Docket No. 50-219 REFUELING INFORMATION - SEPTEMBER 1978 Name of facility: Oyster Creek Station #1 Scheduled date for next refueling shutdown: Began September 16, 1978 Scheduled date for restart following refueling: November 11, 1978 Will refueling or resumption of operation thereaf ter require a Technical Specification change or other license amendment?

No . Technical s Specification change relative to the refueling is anticipated. It has been determined that no unreviewed safety

. questions are associated with the reload core.

Sche' d uled date(s) for submitting proposed licensing action and supporting information:

No submittal is scheduled. -

I Important licensing considerations associated with refueling, e.g. , new or '

different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new' operating . procedures: '

No major changes have been made, nor are there any anticipated. -

The number of fuel assemblies (a) in the core -

- 560 (b) in the spent fuel storage pool - 452

< The present licensed spent fuei pool storage capacity and the size of any i increase in licensed storage capacity that has been requested or is planned, l In number of fuel ~ assemblies: ,

"~ ls  :

1,800 The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity: *

^

l s The Fall 1986 Outage.

~ .

h i

f 9

l l