AD9.3-0 KU0SHENG STARTUP TEST REPORT (SHORT FORM)
TEST #
34 TITLE: Reactor Internals Vibration Monitoring TEST CONDITION:
TC #3 - Reactor at 60% power 1.
Abstract:
The purpose of the reactor internals vibration monitoring program is to verify that the reactor internals are ade-quately designed to resist the effects of flow-induced vibrations.
The program consists of the pre-operational, pre-critical, 60% power, and 100% power test conditions.
This report covers the tests performed at the 60% power condition.
The core flows for this test ranged from minimum flow to 105% of rated flow.
2.
Plant Conditions:
Test Condition:
T. C.
- 3 Date/ Time:
8/2/81 to 8/7/81, and 9/1/81 to 9/4/81 Rx Power, MWt:
2894 Core Flow, T/hr:
From 14800 T/Hr to 40300 T/Hr 3.
Results:
Reactor internals vibration amplitudes for all sensors and all test conditions are within the acceptance criteria.
The above results are from a preliminary data anlaysis done at site and is subject to confirmation at a later date.
Recirculation pump trip tests data are satisfactorily obtained.
Initial investigation indicated that the results are within acceptance criteria.
Detailed analysis will be done by GE San Jose at a later date.
4.
Exceptions:
5.
Final Resolution:
6.
Test Director (Original signed) 8209150273 820909 PDR ADOCK 05000461 E
r MAXIMUM VIBRATION AMPLITUDES COMPONENT SENSOR
% CRITERId TEST CONDITION Core Spray Line S9 469 A. 11I N,
B MIN Fuel Channels Any
< 10 A MAX, B MAX Jet Pump Riser Brace S31/32
<24 A MAX, B MIN LPCI-S45
<39 A MIN, B MAX Jet Pump.
Dif fuse r S53/54
<83 A MAX, B MAX CRGT (Control Rod
-Guide Tube '
Any
<10 A. MIN, B MAX.
ICGT-(In Core Guide Tube )
S70
< 95 A MIN, B MAX Separator-Shroud A7
< 77 A MAX, B MAX Shroud D2
< 29 A MIN, B-MAX' NOTE :
A. MAX, B MAX Corresponds to 105% rated coreflow.
A MIN, B MAX FCVA set as minimum and jet pump drive flow for B loop equal to drive flow at A MAX, B MAX condition.
A MAX, B MIN = Similar to A MIN B MAX with A, B reversed
~
KUuSHENG STARTUP TEST REPORT (SHORT FORM)
TEST #
34 TITLE: REACTOR INTERNAL VIBRATION MEASUREMENTS TEST CONDITION:
- 6 1.
ABSTRACT:
Reactor Internal Vibration Measurements have_been made by Reactor Vibration Analysis and Instrumentation Unit at Kuosheng 1 Site during 100% powe startup test.
On-Site preliminary data analysis indicates that the vibration level of all instrumented reactor internal components satisfy the level 2 Vibration acceptance criteria.
2.
PLANT CONDITIONS:
Refer to attached test conditions list.
Test Condition::
T.C. #6 10/28/81 - 11/6/81 Date/ Time Rx Power, MWt 95%
100%
Core Flow, T/hr:
47%
105%
3.
RESULTS:
Vibration amplitudes of all instrumented reactor internals were within the limit of Level 2 acceptance criteria for all test points without exceptions.
During this test, the maximum and minimum core flow were 105% and 47% of design rated flow respectively.
ICGT and Jet Pump Riser Brace showed most significant vibration amplitudes at TPf6 and TPf4 respectively.
Shroud &
Steam Separator Assembly, High Pressure Core Spray Line, Jet Pump Diffuser and CRGT vibration levels were very low for all test conditions.
Most of Fuel channel' sensors failed before the end of this test.
However, usable data indicate low amplitudes of Fuel Channel Vibrations.
A summary of significant results is attached.
Note:
ICGT means In-Core Guide Tube CRGT means Control Rod Guide Tube 4.
EXCEPTIONS:
There are no exceptions.
5.
FINAL RESOLUTION:
N/A.
6.
TEST DIRECTOR K. H. Kim
t KU0SHENG STARTUP TEST REPORT (SHORT FORM)
TEST #
34 Supplement TITLE: Reactor Internal Vibration Measurements TEST CONDITION:
- 6 Vibration Test #11-Load Reject with Turbine Trip 1.
ABSTRACT:
Reactor Internal Vibration Measurements have been made by Reactor Vibration Analysis and Instrumentation Unit at Kuosheng I site during the load rejection test at 100% power.
On site preliminary data analysis indicates that the vibration level of all instrumented reactor-internal components satisfy the level 2 vibration acceptance criteria.
2.
PLANT CONDITIONS:
See attached Sheet.
3, RESULTS:
Review of preliminary results indicated no changes in funda-mental resonant frequencies for this transient type test.
Further data analysis will be performed in San Jose for the Final Test Report.
(Please refer to K. H. Kims report for maximum amplitudes.)
t i
4.
EXCEPTIONS:
None.
l 5.
FINAL RESOLUTION:
l N/A 6.
PLST DIRECTOR:
B. F. Price i
a
GEN ER AL h ELECTRIC o3mol 5" "o 3 NUCLEAR ENERGY BUSINESS GROUP REV O 3
Plant Kuoshentr 1 Test Identification 100% Power Vibrttion Tent Test Conditions Date Time Test #
Test Conditions Cocu=e nt s 10/31/81 1245 1
1776.4MWt.18000T/hr par A16% B15%
10/31/81 1930 2
'211 7-4 "
99n7o "
Tr'r - A26% B25%
10/31/81 2330 3
2508.9 ".30716: "
FCV A47% B45%
10/28/81 1915 d
2R90 0 "
anqnn."'
A88%.'B89%
_11/6/81 1620 4
2878.0 "
40000'"
A86% B89%
'11/3/81 2000 5
A pumo trin 11/3/81 2008 6
1932.8MWt.27256 "
A16% B88%
11/4/81 0033
_7 B tumo trin 11/4/81 0057
_3 198-3. GMWT. 21 onn "
'ARR% BI3%
11/6/81 1730 9
Two numo trin 11/6/81 1740 in 1009.3MWt.11250 "
Natural' Circulation PsEBG 40 F A (6/80)
GEN ER AL h ELECTRIC.
3" 2 5" "o 3 NL. CLEAR ENERGY
., spSIN.ESS GROUP REV 0 i
Sheet 2
at 2
Plant Kuoshen[I Teit Identification 100% ' Load line ' Tnternal Vibration Measurements Test Conditions ' Refer.to K.H Kims report dated 1'l-3-81 for tests 1
~
through 10.
Date Time Test (
Test Conditions Comments 11-11-81 1730 11 2878MWt:38400T/hr Load Rejec't. Test I
1 1
t t
07 A (640)
GEN ER AL h ELECTRIC 3a2001 su m.31
~'
NUCt. EAR ENERGY REV g BUSINESS GROUP i
l l
Plant Kuoshene 1 Test Identification 100% Power Vibration Test Slenificant Results.
1hese resnits represent the maxima:s vibration stress amplitudes or the dominant vibration responses which were measured for each class of components..The maximum allowable peak stress amplitude is the Level'2 criterion for the material of the reactor component.
Test No./
Coero Condition Sensors cAmplitude.Frecuenev % Criteria Co=ments *
(p p)
(Hz)
SHROUD TP#2 A7 10 mils 5
55 From Spectrum TP#1 D2
'1. 2 5
14 HPCSL TP#6 S9 6.0 UE 30 2R FUEL CHANNFL
- 4 S15 on if 5
<10 JET PUtiPRB
- 4 S43 24 44 os JET PUtiP DIFFUSER
- 6 SS1/52 1R n
30 44 CRGT
- 4 S66 10 30 31 R
- 95 ICGT.
- 6 S70 14 These values are the sum of T critorin fnv cignif4 cant modes.
' Indicate whether p p vaines were measured frem Brush records, oscillograph records, or esti=ated from spectrum records.
NEsG.40 7 A (6/80)