U-0540 n,
L30-82(09-09)-6 ILLINDIS POWER COMPANY M
500 SOUTH 27TH STREET, DECATUR, ILLINOIS 62525 September 9, 1982 Mr. Cecil 0. Thomas, Chief Standardization & Special Projects Branch Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Thomas:
Clinton Power Station Unit 1 Docket No. 50-461
Reference:
Clinton SER Confirmatory Issue No. 9 This is in response to Confirmatory Issue No. 9 which discusses RPV internal vibration testing.
En-closed is Kuosheng data which should meet the require-ments of RG 1.20.
The data was retyped since copies of the original material could not be reproduced.
The original data can be made available for review.
Sincerely,
. c?{
G. E. Wuller Supervisor-Licensing Nuclear Station Engineering KGS/lt cc:
J. H. Williams, NRC Clinton Project Manager H. H. Livermore, NRC Resident Inspector Illinois Dept. of Nuclear Safety 60 0209150269 820909 PDR ADOCK 05000461 E