Forwards Kuosheng Startup Test Rept,Reactor Internals Vibration Monitoring, in Response to Clinton SER Confirmatory Issue 9
ML20063M602
Person / Time
Site: Clinton, 05000000, 05000469
Issue date: 09/09/1982
From: Wuller G
ILLINOIS POWER CO.
To: Thomas C
Office of Nuclear Reactor Regulation
Shared Package
ML20063M603 List:
References
N-0540, N-540, NUDOCS 8209150269
Download: ML20063M602 (1)


Text

)

U-0540 ILLINDIS POWER COMPANY n ,

M L30-82(09-09)-6

  1. 500 SOUTH 27TH STREET, DECATUR, ILLINOIS 62525 September 9, 1982 Mr. Cecil 0. Thomas, Chief Standardization & Special Projects Branch Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Thomas:

Clinton Power Station Unit 1 Docket No. 50-461

Reference:

Clinton SER Confirmatory Issue No. 9 This is in response to Confirmatory Issue No. 9 which discusses RPV internal vibration testing. En-closed is Kuosheng data which should meet the require-ments of RG 1.20. The data was retyped since copies of the original material could not be reproduced. The original data can be made available for review.

Sincerely,

. c?{ '

G. E. Wuller Supervisor-Licensing Nuclear Station Engineering KGS/lt cc: J. H. Williams, NRC Clinton Project Manager H. H. Livermore, NRC Resident Inspector Illinois Dept. of Nuclear Safety 60 0209150269 820909 PDR ADOCK 05000461 E PDR