ML20063C466

From kanterella
Jump to navigation Jump to search
1981 Rept of Occupational Personnel Radiation Doses
ML20063C466
Person / Time
Site: 05000000, Quad Cities
Issue date: 02/17/1982
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML18086B619 List: ... further results
References
FOIA-82-285 NUDOCS 8208270268
Download: ML20063C466 (3)


Text

- _ _ _ -

l

_ Quad Cities Btation

{

8 19 l.;, Report of occupational personnel Radiation Doses

  • l Commonwealth Edison Company Contract Workers Un rir Ptine t t nn Reactor Operations Routine Maint.

l Inservice Inspection -Waste Processing Berueling Total by Job Job Function

& Surveillance f of People / Man-Rem # of People / Man-Rem # of People / Man-Rea # of People /Han-Rem Function

  1. of People / Man-Rem
  1. of People / Man-Re 784/1913 2 76/200 5 29/76.6 889/2190.4 3p:reting 14/1470.0 14/1470.0
lealth Physics 12/10 3

'3 lupervision W rias 6/5 185 66/52.1 47/32.8 12/10.4 25/12.o 168/122.8 C "UCD

> EOS Fm8 820 pfy INSTRUCTION:

Place personnel codes and percentages 8

g CD in the boxes.

(9000 series) i 8

O Dga m

h j

~

Qund Cities

- Station 8

19 _1 Report er c:cupational Personnel Radiation Doses

  • Commonwealth Edison Cornpany Station Dmployes unrk Pune tt rm Beactor Operations Routine Maint.

lInserviceInspection Waste Processing Refueling Total by Job Job M etion

& Surveillance

  1. of People / Man-Ren # of People / Man-Rem # of People / Man-Rea # of People / Man-Rea h etion
  1. of People /Han-Rem
  1. of People / Man-Rei Maintenance 13/25.6 52/158.7 5/9 9 20/64.3 28/76.2 118/334.7 DPersting 39/46.2 8/11.1 1/2.2 53/85.6 6/11.1 107/156.2

" *" D '

18/15 7 8/11.7 5/6.5 15/19 1 9/12.2 55/65 3 m

48/44.9 30/20.4 9/5.8 63/26 9 18/15.4 168/112 9 p ring 7/3 7 22/10.7 14/10.8 3/3 0 46/28.2 INSTRUCTION:

Using the personnel codes from the sample sheet along with any other personnel codes you may add in the above boxes, put the percentage of the personnel codes in them as shown on the sample sheet.

g h

e

Qund Cities Station 19 ~81 Report of Occupational Personnel Radistion Doses

  • Commonwealth Edison Company Company Deployes other than Station Laployes un rir W aettan Reactor operatione

' Routine Maint.

lInserviceInspection Weste Processing Refueling Total by Job

b. Function

& Surveillance

  1. of People / Man-Rem # of People / Man-Rea # of People / Man-Rem # of People / Man-Rea Function
  1. of People / Man-Rem
  1. of People / Man-Rei -

1"t*"*""*

64/46.7 64/46.7 cretins alth Physics G

pervicion 1

  • 1mring 11/2.2 11/2.2 11/2.8 6/1.2 3/0.8 42/9 0 INSTRUCTION:

By using the following personnel codes, 3100, 3200, 3300, 2100, 2200, 2300, 4100, and any personnel code not listed on this sheet, place where appropriate along with percentages in the boxes.

.O a

i

.