Regulatory Licensing Status Summary Report.Data as of July 10,1982.(Blue Book)
ML20062L073
Person / Time
Issue date: 07/31/1982
From:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
To:
References
NUREG-0580, NUREG-0580-V11-N07, NUREG-580, NUREG-580-V11-N7, NUDOCS 8208180120
Download: ML20062L073 (72)


Text

-_-

NUREG-0580 Vol.11, No. 7

. :_;=-

2 REGULATORY LICENSING STATUS

SUMMARY

REPORT l

NUCLEAR POWER PLANTS DATA FOR DECISIONS 4 BLUE BOOK?

JUNE 17 - JULY 10,1982 UNITED STATES NUCLEAR ::EGULATORY COMMISSION s

NhfhY.

Available from NRC/GPO Sales Program Superintendent of Documents Government Printing Office Washington, D. C. 20402 A year's subscription consists of 12 issues for this publication.

i Microfiche of single copies are available from NRC/GPO Sales Program Washington, D. C. 20555

)

i l

l

\\

NUREG-0580 Vol.11, No.7 REGULATORY LICENSING STATUS

SUMMARY

REPORT NUCLEAR POWER PLANTS DATA FOR DECISIONS (BLUE BOOK)

JUNE 17 - JULY 10,1982

$ ate EuNishe["uf 198 Prepared for. 0FFICE OF NUCLEAR REACTOR REGULATION Prepared by: 0FFICE OF RESOURCE MANAGEMENT l

U.S. NUCLEAR REGULATORY COMMISSION l

WASHINGTON, D.C. 20555 p

==a.

F0REWDRD THIS MANAGEMENT REPORT, REGULATORY LICENSING STATUS

SUMMARY

REPORT, IS DESIGNED TO PROVIDE THE NECESSARY INFORMATION FOR CONTROLLING IHE PROGRESS OF REVIEW PROCESSES FOR CENTRAL STATIDH NUCLEAR REACTOR APPLICATIONS. IT UTILIZES DATA COLLECTED FROM THE OFFICE OF NUCLEAR REACTOR REGULATION, 0FFICE OF THE EXECUTIVE LEGAL DIRECTOR, OFFICE OF INSPECTION 8 ENFORCEMENT, AND THE NATIC;4AL LABORATORIES, AND ANALYZED BY THE OFFICE OF RESOURCE MANAGEMENT IN THE IMPLEMENTATION OF THE REGULATORY INFORMATION SYSTEM.

SECTION I 0F THIS EDITION CONSISTS OF THE THREE

SUMMARY

OF ACCOMPLISHMENTS, THE NEW APPLICATION FORECAST FOR OL'S AND CP'S, AND AN ABBREVIATION KEY.

SECTION II REPRESENTS THE MAIN BODY OF THE REPORT AND CONSISTS OF THE FACILITY INFORMATION. ALL OL'S ARE LISTED FIRST, FOLLOWED BY CP'S, STANDARD LESIGN REVIEWS, OTHER REVIEWS, AND FINALLY, A NON-POWER REACTOR

SUMMARY

. EACH PROJECT CONSISTS OF GENERAL FACILITY DATA, CURRENT STATUS FOR ALL PHASES OF THE REVIEW, AND TARGETED AND ACTUAL COMPLETION DATES FOR ALL KEY MILESTONES IN THE REVIEW.

i f

LICENSING 0F hUCLEAR REACT 0RS THE U.S. NUCLEAR REGULATORY COMMISSION REQUIRES TWO SEPARATE LICENSES - ONE TO BUILD THE FACILITY AND ANOTHER TO OPERATE IT.

LISTED BELOW ARE THE STEPS IN THE PROCESS OF OBTAINING A CONSTRUCTION PERMIT AND GPERATING LICENSE.

THE UTILITY SUBMITS A FORMAL APPLICATION DESCRIBING THE DESIGN, LOCATION, AND ENVIRONMENTAL IMPACT OF THE PROPOSED PLANT AND THE SAFEGUARDS TO BE PROVIDED. THE APPLICATION ALSO COVERS THE UTILITY'S FINANCIAL QUALIFICATIONS.

THE NRC MAKES COPIES OF THE APPLICATION AVAILABLE TO THE ACRS AND TO THE PUBLIC DOCUMENT ROOM.

TECHNICAL EXPERTS ANALYSE THE APPLICATION, AND PREPARE A SAFETY EVALUATION AND AN ENVIRONMENTAL IMPACT STATEMENT. THESE DOCUMENTS ARE ALSD MADE AVAILABLE IN THE PUBLIC DOCUMENT ROOM.

THE STAFF'S ANALYSIS IS SUBMITTED TO THE NRC'S STATUTORY ADVISORY COMMITTEE ON REACTOR SAFEGUARDS, A COMMITTEE OF INDEPENDENT EXPERTS. ACRS STUDIES THE APPLICATION IN DETAIL AND HOLDS CONFERENCES WITH THE APPLICANT, THE LICENSING STAFF AND OTHERS. THE ACRS FINDINGS ARE REPORTED TO THE NRC AND MADE PUBLIC.

A PUBLIC HEARING IS HELD, USUALLY HEAR THE PROPOSED SITE, BY AN NRC APPOINTED ATOMIC SAFETY a LICENSING BOARD. PRIVATE CITIZENS, STATE AND LOCAL OFFICIALS, AND COMMUNITY GROUPS MAY PARTICIPATE.

AFTER REVIEWING THE HEARING RECORD INCLUDING THE NRC STAFF AND ACRS FINDINGS, THE BOARD DECIDES FOR OR AGAINST GRANTING A CONSTRUCTION PERMIT.

THE BOARD'S DECISION IS REVIEWED BY THE ATOMIC SAFETY AND LICENSING APPEAL BOARD, AND IS SUBJECT TO REVIEW BY THE FIVE-MEMBER HUCLEAR REGUL ATORY COMMISSION.

IF THE LICENSING BOARD AUTHORIZES THE ISSUANCE OF A CONSTRUCTION PERMIT, THE DIRECTOR OF THE DIVISION OF LICENSING WILL ISSUE A CONSTRUCTIDH PERMIT. AN EARLIER LIMITED WORK AUTHORIZATION TO DO PRELIMINARY SITE CONSTRUCTION MAY HAVE BEEN GRANTED IF THE SITE HAD BEEN DETERMINED TO BE SUITABLE BY THE NRC STAFF AND THE BOARD HAD RULED FAVORABLY ON THE ENVIRONMENTAL IMPACT ANALYSIS. CONSTRUCTION IS SUBJECT TO INSPECTION BY THE OFFICE OF INSPECTION AND ENFORCEMENT.

AS CONSTRUCTION PROGRESSES, ADDITIONAL INFORMATION IS DEVELOPED AND THE UTILITY APPLIES TO THE NRC FOR AN OPERATING LICENSE. THE SAME CAREFUL ANALYSIS AS IS MADE AT THE CONSTRUCTION PERMIT STAGE IS MADE BY THE HRC IN DECIDING WHETHER OR NOT TO ISSUE THE OPERATING LICENSE.

IN THE OPERATING LICENSE REVIEW PROCESS, OPPORTUNITY FOR HEARING IS PROVIDED. CONTRASTED WITH THE CONSTRUCTION PERMIT REVIEW PHASE, A HEARING IS HELD ONLY IF INTERVENTION IS GRANTED. FINAL ISSUANCE OF AN OPERATING PERMIT IS SUBJECT TO THE APPROVAL OF BOTH THE DIRECTOR OF THE DIVISION OF LICENSING AND OF TdE COMMISSION.

TABLE OF C0HTENTS PRINTED IN THE ORDER LISTED SECTIOH I

SUMMARY

OF ACCOMPLISHMENTS OL

SUMMARY

OF ACCOMPLISHMENTS CP

SUMMARY

OF ACCOMPLISHMENTS COMBINED HUMERICAL

SUMMARY

OF ACCOMPLISHMENTS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING OPERATING LICENSES IN THE NEXT FIVE YEARS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING CONSTRUCTION PERMITS IN THE HEXT FIVE YEARS HEW APPLICATION FORECAST OPERATING LICENSE REVIEWS CONSTRUCTION PERMIT REVIEWS SPECIAL REVIEWS COMMON ABBREVIATIONS USED WITHIN THE PUBLICATION SECTION II I

PROJECT INDEX OPERATING LICENSE REVIEWS CONSTRUCTION PERMIT REVIEWS STANDAR'D DESIGN REVIEWS OTHER REVIEWS HON-POWER REACTORS SECTI0N III EXAMPLE REVIEW

M Z

Q M

N U

LAJ m

OL

SUMMARY

0F ACC0MPLI$HMENTS AS OF JULY 10, 1982 JHil FISCAL YEAR TO DATE FACILITY SCHEDULED ACTUAL FACILITY SCHEDULED ACTUAL SER 'S SER ' S WATTS BAR 1 1 2 07/01/82 07/01/82C BYRON 182 02/07/82 02/07/82C CALLAWAY 1 10/07/81 10/07/8tC CLINTON 1 82 01/05/82 02/17/82C i

MIDLAND 1 8 2 05/11/82 05/tt/82C PALO VERDE 1,2,3 11/11/81 ft/tt/stC PERRY I 32 05/10/82 05/24/82C ST LUCIE 2 10/09/81 10/09/81C WASHINGTON NUCLEAR 2 03/31/82 03/3t/82C WATTS BAR 1 82 07/0f/82 07/01/82C WOLF CREEK 1 04/07/82 04/07/82C SSER ' S SSER 'S DIABLO-CANYON 1 12 07/00/82 BYRON 182 03/30/82 03/30/82C GRAND GULF 1 82 07/21/82 07/21/82C CALLAWAY 1 01/15/82 01/15/82C SUSQUEHANNA 1 82 07/17/82 07/17/82C CLINTON 1 82 03/31/82 06/30/82C COMANCHE PEAK 1 8 2 10/16/81 10/16/8tC COMANCHE PEAK 182 01/20/82 Ot/20/82C DIABLO-CANYON 1 82 10/02/81C DIABLO-CANYON 182 07/00/82 ENRICO FERMI 2 01/26/82 01/29/82C GRAND GULF 1 82 12/10/81C GRAND GULF.1 82 05/14/82 06/16/82C GRAND GULF 1 8 2 07/09/82 07/2f/32C LASALLE I 82 02/12/32 02/12/82C LASALLE 1 8 2 04/16/82 04/16/82C LASALLE 1 82 06/29/82 06,29/82C MIDLAND 1 82 06/30/82 06/30/82C PALD VERDE 1,2,3 02/05/82 02/05/82C PALO VERDE 1,2,3 05/17/82 r.5/17/82C SAN ONOFRE 2 8 3 01/22/82 01/22/82C SAN ONOFRE 2 8 3 02/16/82 n2/16/82C SAN ONOFRE 2 8 3 06/30/82 06/30/82C SHOREHAM 03/12/82C ST LUCIE 2 12/30/81 12/30/81C SUMMER 1 01/08/82 01/08/82C SUSQUEHANNA t82 07/00/82 07/17/82C WATERFORD 3 10/09/81 10/13/8tC WATERFORD 3 01/22/82 Of/13/82C WATERFORD 3 04/30/82 04/30/82C ZIMMER 1 10/00/81 10/00/8tC

0L 5UMMARY 0F ACC0MPLISHMENTS AS OF JULY 10. 1982 IQLY FISCAL YEAR TO DATE FACILITY SCHEDULED ACTUAL FACILITY SCHEDULED AQTUAL DES 'S DES 'S NONE BYRON 1 12 11/05/81 11/05/81C CLINTON 1 12 12/18/88 12/28/81C MIDLAND 1 &2 02/05/82 02/05/82C PALO VERDE 1.2,3 10/26/81 10/26/81C PERRY 1 82 02/26/82 02/26/82C SEAEROCK 1 82 05/14/82 0 5/14 /82C ST LUCIE 2 10/16/8 1 10/16/81C WOLF CREEK 1 01/05/82 01/05/82C FES ' S FES

'S PERRY 1 & 2 07/05/82 BYRON 1 &2 04/05/82 04/05/82C CALLAWAY 1 01/29/82 01/29/82C CLINTON 1 22 05/20/82 05/20/82C GRAND GULF 1 &2 10/09/81C PALO VERDE 1,2,3 03/11/82 03/11/82C PERRY 1 &2 07/05/82 ST LUCIE 2 04/23/82 04/23/82C WASHINGTON NUCLEAR 2 12/31/31 12/31/81C WOLF CREEK 1 06/11/82 06/11/82C 0L

'S I5 SUEDE OL ' s I S S U E D*

O FULL POWER

I e

i CC C

11 2

(

88 8

A

//

/

U 00 4

T 30 0

C

//

/

A 00 5

11 0

D E

E 11 2

T L

88 8

A U

//

/

D D

55 4

E 10 0

O H

//

/

T C

00 5

S 11 0

R A

E Y

S L

A T

C S

N I

F 2

2 E

4 8

1 1

D M

Y T

1D D

E r

H E

R R

L KO O

U S

I EF F

C EN N

S I

A RA A

F CH H

S L

/

/

S ST T

I P 2 NI I

8 E

S E

EG S

G S

E E

M 9 N

N LA A

M M

1 O

O R

LK K

O S

O w

0 N

N AS S

N H

R E

S S

C 0

1 E

S E

E P

C Y

S S

D F

C A L U

J F F

~

O 0

S A

Y L

R A

U A

T C

M A

M U

S D

E L

U P

D E

C H

C S

Y L

U J

D Y

T E

I L

U I

C S

A F

S S

I E

S E

E S

E S

E E

N N

N N

N N

O O

R O

O O

S O

N H

H N

N H

R E

S S

E S

E E

P S

S D

F C

4

l l

l1 l

ll(\\1 l

ll L

A U

To 0

7 2

8 1

8 0

0 0

Ct 2

A D

E L

EU LE0 0

5 2 8

1 8

0 0

0 AE1 2

DH C

OS T

R A

E Y

S N

L D D T

A C

N S

)

)

E E I

E F

)

)

L P

)

)

)

U U M

L P

0 C L P L P S S H

0 C

(

(

0 C O C S S S

(

(

S S

(

(

C

(

I I

I S S S S S S 2

L 8 R R S S 9

1 R R E E S S S S P

E E S S E E E E L P M

0 S S S 5 D D F F 0 C O

1 C Y L

C U J

A F

O F

S L

A A

O U

T1 0

2 0

0 0

0 0

0 0

C A

Y R

A M

M D

U E

L S

U D1 0

3 0

0 0

1 0

0 0

E H

C S

MD D E E Y

)

)

L U

)

)

L P

)

)

)

)

U U J

L P 0 C L P L

P S S 0 C

(

(

0 C 0 C S S

(

(

S S

(

(

(

(

I I

R S S S S E

S S W

R R S S O

P R R E E S S S S L

E E S S E E E E L

P L

U S S 5 S D D F F 0 C F

N ll lll ll ll

)i

LICENSING SCHEDULES FOR ALL PENDING OL APPLICATIONS REPORT AS OF 07/10/82 (INCLUDES SCHEDULES FOR ADDITIONAL UNITS WITH PROJECTED CONSTRUCTION COMPLETION IN CY 1982-1963)

(LISTED IN ORDER OF FACILITY NAME)

SER SSER EST.

STAFF TECH STAFF TECH ASLB COMMw APPL.

DELAY ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.

CONST.

PLANT (t'O N T H S ) Ef1 TQ Df, 1B

[1T_Q ff,1 TQ pl ljiF2 0F HRG DECISIO3

plJf, COMPL.

BELLEFONTE 1 0

11/82 02/83 03/83 04/83 05/83 05/83 06/83 N/A N/A G8/83 12/84 BYRGH 1 0

11/81C 01/82C 02/82C 03/S2C

-04/82C 08/82 09/82 08/82 04/83 04/83 04/83 CALLAWAY 1 0

09/81C 09/81C 10/8tC 11/31C 01/82C 01/82C 01/82C 11/81C 01/83 05/83 06/83 CLINTON 1 0

12/81C 09/80C 02/82C 03/82C 05/82C 06/32C 06/82C 11/82 09/83 12/83 01/84 COMANCHE PEAK 1 0

05/81C 07/81C 07/81C 11/81C 09/81C 09/82 09/82 12/81C 09/82 05/83 06/83 DIABLO CANYON 1 0

1er?2C 01/75C 10/74C 07/76C 05/76C 07/82 27/82 12/76C 07/82 I

DIABLO CANYON 2 0

12/720 01/75C 10/74C 07/76C 05/76C 07/82 N/S 12/76C 07/82 I

ENRICO FERMI 2 0

04/81C 05/77C 09/77C 08/ SIC 09/81C 08/82 09/82 03/82C 08/82 05/81 06/83 CRAND GULF 1 3

05/81C 08/81C 09/81C 10/81C 10/81C 07/82C 09/82 N/A N/A 09/82 06/32C LASALLE 1 3

03/78C 02/31C 03/81C 04/81C 11/78C 06/82C 07/82C N/A N/A 07/82 04/82C LASALLE 2 0

03/78C 02/81C 03/31C' 04/81C 11/78C 06/32C 11/82 N/A N/A 04/83 04/83 MCGUIRE 2 0

10/75C 01/78C 03/78C 04/78C 04/76C 12/82 01/83 03/77C 06/81C 03/83 04/83 MIDLAND 1 0

02/82C 04/82C 05/82C 06/82C 07/82 06/82C 11/83 11/82 06/83 11/83 12/83 MIDLAND 2 0

02/82C 04/82C 05/82C 06/32C 07/82 06/82C 06/82C 11/82 06/83 07/83 07/83 PALO VERDE 1 0

10/81C 10/81C 11/81C 12/81C 03/82C 07/82 07/82 04/82C 10/82 11/82 11/82 l

PALO VERDE 2 0

10/81C 10/81C 11/81C 12/81C 03/82C 07/82 10/83 04/82C 10/82 10/83 11/83 PERRY 1 0

02/82C 05/82C 05/82C 07/82C 07/82 07/82 07/82 11/82 04/83 10/83 11/83 SAN CHOFRE 2 5

01/81C 01/81C 02/81C 02/81C 04/81C 07/82 07/82 06/81C 05/82C 07/82 02/82C SAN CNOFRE 3 0

01/81C Ot/81C 02/81C 02/81C 04/81C 07/82 10/82 06/81C 05/82C 10/82 11/82 SHOREHAM 6

03/77C 03/31C 04/81C 10/81C 10/77C N/S 09/82 05/82C 04/83 03/83 09/82 ST LUCIE 2 0

10/81C 09/81C 10/81C 11/81C 04/82C 07/82 08/82 N/A N/A 09/82 10/82 SUMMER 1 1

06/79C 12/30C 02/81C 03/81C 05/81C 07/82C 07/82 06/81C 07/82 08/82 07/82 SUSOUEHANNA 1 1

03/81C 03/81C 04/81C 08/81C 07/81C 07/82C 07/82C 10/81C 04/82C 08/82 07/82C SUSQUEHANNA 2 0

03/81C 03/81C 04/81C 08/81C 07/81C 07/82C 03/83 10/81C 04/82C 12/83 01/84 WASHINGTON NUCLEAR 2 0

07/81C 05/82C 03/82C 09/82 12/81C 09/82 10/82-N/A N/A 08/83 09/83 WATERFORD 3 0

05/81C 05/81C 07/81C 08/81C 09/81C 07/82 07/82 03/82C 09/82 12/82 01/83 NATTS BAR 1 0

06/78C 06/82C 07/82C 08/82 12/78C 08/82 d9/82 N/A N/A 07/83 08/83 WOLT CREEK 1 0

01/82C 03/82C 04/82C 05/82C 06/82C 08/82 08/82 10/82 03/83 11/83 12/83 ZIMMER 1 0

10/76C 12/77C 01/79C 03/79C 06/77C 08/82 08/82 02/82C 06/82C 11/82 12/82 0 LICENSING SCHEDULES AND DECISION DATES DO NOT REFLECT POTENTIAL DELAY FROM EMERGENCY PREPAREDNESS REVIEW.

i

___m_m_ _ _ _ _ _ _ _ _

LICENSING SCHEDULES FOR ALL TENDERED OL UNITS TO BE ISSUED AFTER CV 1983 ISSUE APPL. CONST.

PLANT M

COMPLETE BELLEFONTE 2 N/S 09/84 BRAIDWOOD 1 05/84 04/85 BRAIDMCOD 2 04/86 BYR0ff 2 N/S 12/84 CATAUBA 1 04/83 11/84 CATAMBA 2 N/S 10/86 CLIHT0il 2 H/S Cor1ANCHE PEAK 2 11/84 12/84 FERMI 2 (FSAR RESUB)

GRAND GULF 2 N/S N/S HARRIS 1 01/84 12/84 HARRIS 2 N/S 06/88 LIMERICK 1 10/83 10/84 LIMERICK 2 10/86 PALO VERDE 3 N/S 11/85 l

PERRY 2 05/87 l

RIVER BEND 1 05/84 04/85 RIVER BEND 2 N/S SEABROOK 1 12/82 05/84 SEABROCK 2 02/86 SOUTH TEXAS 1 08/83 12/86 SOUTH TEXAS 2 N/S 12/88 WASHINGTON NUCLEAR 1 H/S 12/85 WASHINGTOH HUCLEAR 3 06/84 06/85 MATTS BAR 2 06/84 08/84 l

REPORT AS OF: 07/10/82 LICENSING SCHEDULES FOR ALL PENDING CP APPLICATIONS (LISTED IN ORDER OF FACILITY HAME)

SSER SER STAFF TECH STAFF TECH ASt B COMM ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.

PLANT pli TO DL ifs I1LCe EE1 TO DL 11LS OF HRG DECISION pfAJE (SP)FNP 1-8 (MANUF.)

07/74C 08/75C 09/75C 04/76C 10/75C 03/76C 09/81C 06/76C 06/82C 09/82 ALLENS CREEK 1 07/74C 11/74C 11/74C 12/74C 11/74C 03/75C 10/81C 03/75C 11/82 11/82 CLINCH RIVER 02/76C 01/83 03/83 05/83 02/77C 06/83 07/83 08/82 05/84 06/84 PEBBLE SPRINGS 1 82 01/75C 12/75C 01/76 C 02/76C 04/75C 12/77C N/S N/S N/S N/S SKAGIT/HANFORD 182 05/82C 07/77C 08/77C 07/82 04/83 08/82 09/82 07/75C 04/83 07/83 l

l l

l l

n

HEW APPLICATION F O'R E C A S T --- 0 P E R A T I N G LICENSE REVIEW 5 (ANTICIPATED TENDER DATES FOR ALL UNITS WITN CONSTRUCTION PERMITS)

AS OF WEEK ENDING: 07/10/82

_________==. ________

______=________.____._..._______________________________.._________.__.______________________

LICENSING APPL.

APPL.

IST UNIT DOCKET PROJECT SUBMITS SUBMITS CONST.

FACILITY NUMBER UTILITY MANAGER FSAR ENV. RPT. COMPLETE COUNSEL 1

FY82l WASHINGTON NUCLEAR 1 050-00460 WASHINGTON PUBLIC POWER SUPPLY

. UNASSIGNED 12/00/81C 12/00/81C 12/00/85 M. YOUNG l

l l WASHINGTON NUCLEAR 3 050-00508 WASHINGTON PUBLIC POWER SUPPLY

. UNASSIGNED 06/02/82C 06/00/82C 06/00/85 D.SWANSON

-l

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _..... = =. -_. _==-

==___. ___________.____________

FY83 MILLSTONE 3 050-00423 NORTHEAST NUCLEAR ENERGY J. GRANT 11/00/82 12/00/82 12/00/85 M.ROTHSCHILD MARBLE HILL 1 82 054680547 PUBLIC SERVICE OF INDIANA E.DOOLITTLE 12/00/82 12/00/82 06/00/86 R.LESSY BEAVER VALLEY 2 050-00412 DUQUESNE LIGHT E.DOOLITTLE 12/31/82 12/31/82 12/00/85 J.GUTEIRREZ NINE MILE POINT 2 050-00410 HIAGARA MOHAWK POWER D. LYNCH 01/00/83 01/C0/83 03/00/86 B.BORDENICK HOPE CREEK 1 050-00354 PUBLIC SERVICE ELECTRIC 4 GAS

. UNASSIGNED 06/00/83 06/00/83 06/00/86 R. BLACK V0GTLE 1 82 0424-0425 GEORGIA POWER J. GRANT 09/00/83 09/00/83 09/00/86 B.BORDENICK

_.....-_=_ _

=_____...___

___....____-______=.___.==

_ - _ = _ _... _ _ _ _ _ -

-_____.==____- _______

FY86l NORTH ANNA 3 050 00404 VIRGINIA ELECTRIC 8 POWER

. UNASSIGNED 04/00/86 04/00/86 04/00/89 R. GODDARD l

m_

HEW APPLICATIOH F 0 R E C A S T -- C 0 H S T R U C T I O H PERMITS AS OF WEEK ENDING: 07/10/82 lHAME FACILITY PROJECT PROJECT APPL. ER APPL PSARI UTILITY hut 1BER MANAGER SUB. DATE SUB. DATE l

_________W._____...._________________W____._______.____________W._______._____________m___e.

l CARROLL 1 32 COMM0HWEALTH EDISDN 559 J. WILSON 10/00/84 10/00/84 l 9

C0MM0N ABBREVIATIONS USED WITHIN THE PUBLICATION ACRS: ADVISORY COMMITTEE ON REACTOR SAFEGUARDS L.A..

LICENSING ASSISTANT AE:

ARCHITECT / ENGINEER LESRs LIMITED EARLY SITE REVIEW (ALSO ABBREVIATED LES)

AEB ACCIDENT EVALUATION BRANCH LGR:

LICENSING CUIDANCE BRANCH ASB:

AUXILIARY SYSTEMS BRANCH LMFBR: LIQUID METAL FAST BREEDER REACTOR ASLB ATOMIC SAFETY LICENSING BOARD LQB:

LICENSEE QUALIFICATIONS BRANCH B8R BURNS 8 ROE MEB:

MECHANICAL ENGINEERING BRANCH 88V:

BLACK 3 VEACH MPA:

MANAGEMENT AND PROGRAM ANALYSIS B8W:

BABCOCK & WILCOX MTEB: MATERIALS ENGINEERING BRANCH BECH: BECHTEL MEW:

MEGAWATTS ELECTRIC BRRT: BRCWN 8 ROOT MWT:

MEGAWATTS THERMAL BWR BOILING WATER REACTOR NSSS: NUCLEAR STEAM SYSTEMS SUPPLIER CEB CHEMICAL ENGINEERING BRANCH GL OPERATING LICENSE COMB COMBUSTION ENGINEERING OLB:

OPERATOR LICENSING BRANCH CP:

CONSTRUCTION PERMIT OPS:

OFFSHORE POWER SYSTEMS CPB:

CORE PERFORMANCE BRANCH CS3 CONTAINMENT SYSTEMS BRANCH CWE COMMONWEALTH EDISON PDA:

PRELIMINARY DESIGN APPROVAL PG8E: PACIFIC GAS 8 ELECTRIC DES:

DRAFT ENVIRONMENTAL STATEMENT PID:

PARTIAL INITIAL DECISION PM:

PROJECT MANAGER PS POWER SYSTEMS BRANCH EEB ENVIRONMENTAL ENGINEERING BRANCH PSAR: PRELIMINARY SAFETY ANALYSIS REPORT EPA:

ENVIRONMENTAL PROTECTION AGENCY PTRBI PROCEDURES AND TEST REVIEW BRANCH EPLB EMERGENCY PREPAREDNESS LICENSING BRANCH PWR PRESSURIZED WATER REACTOR ER:

ENVIRONMENTAL REPORT EQB:

EQUIPMENT QUALIFICATION BRANCH ESRs EARLY SITE REVIEW QAB:

QUALITY ASSURANCE BRANCH ETSB: EFFLUENT TREATMENT SYSTEMS BRANCH RAB:

RADIOLOGICAL ASSESSMENT BRANCH F.R.:

FEDERAL REGISTAR RSB REACTOR SYSTEMS BRANCH FDA:

FINAL DESIGN APPROVAL FES:

FINAL ENVIRONMENTAL STATEMENT FSAR: FINAL SAFETY ANALYSIS REPORT

$8L:

SARGENT & LUNDY S8W:

STONE 8 WEBSTER SAB SITING ANALYSIS BRANCH G8H:

GIBBS 8 HILL SAR:

SAFETY ANALYSIS REPORT GHDR: GIBBS 4 HILL SDA:

STANDARD DESIGN APPROVAL GIL:

GILBERT COMMONWEALTH SEB STRUCTURAL ENGINEERING BRANCH GSB:

GEOSCIENCES BRANCH SER:

SAFETY EVALUATION REPORT SIB:

SYSTEMS INTERACTION BRANCH SP SPECIAL PROJECT HGB:

HYDROLOGIC AND GE0 TECHNICAL BRANCH SSC:

SOUTHERN SERVICES COMPANY HTGR HIGH TEMPERATURE GAS COOLED REACTOR SSER: SUPPLEMENT.TD SAFETY EVALUATION TVA:

TENNESSEE VALLEY AUTHORITY ICB:

INSTRUMENTATION AND CONTROL BRANCH UEC:

UNITED ENG. 8 CONSTRUCTORS UFB:

UTILITY FINANCE BRANCH WEST: WESTINGHOUSE-

b M

Z O

>=

0 LL3 m

4 t

E i

I

  • F

PR0 JECT INDEX SECTION II OPERATINS LICENSE REVIEW CONSTRUCTION PERMIT REVIEWS STANDARD DESIGN REVIEWS OTHER REVIEWS 2-1 DELLEFONTE 1 3 2 2-34 ALLENS CREEK 1 2-33 (BOP)EOPSSAR/BSAR-205 2-48 (SP)FNP 1-8 (MANUF.)

2-2 CRAIE200D 1 &2 2-35 CLINCH RIVER 2-39 (BOP)ESSAR/BSAR-205 2-49 BLUE HILLS SITE 2-3 LYRCN 1 3 2 2-36 PEDOLE SPRINGS 1 8 2 2-40 (BOP)ESSAR/CESSAR-80 2-50 CARROLL SITE 2-4 CALLAWAY 1 2-37 SKAGIT/HANFCRD 132 2-41

( B CP ) ESS AR / R ES AR-414 2-5 C A T,i W3 A 1 3 2 2-42 (BOP)GAISSAR 2-6 CLINTON 1 0 2 2-43 (DOP)GIBBSSAR (W) 2-7 COMA"CHE PEAK 1 2 2 2-44 (00P)SWESSAR/BSAR-205 2-3 DIAELO-CANYON 1 1 2 2-45 (NSS)CESSAR SYSTEM 80 2-9 ENRICO FERP.I 2 2-46 (NSS)GESSAR SEVERE ACC 2-10 FERMI 2 (TSAR RESUB) 2-47 (NSS)GESSAR-233 NI 2-11 GRAND GULF 1 22 2-12 HARRIS t & 2 2-13 LASALLE 1 3 2 2-14 LIMERICK 1 & 2 2-15 MCC'JIRE 2 2-15 MIDLAND 1 32 2-17 PALO VERDE 1,2,3 2-13 PERRY 1 & 2 2-19 RIVE 2 SEND 1 &2 2-21 SAN ONOFRE 2 3 3 2-21 SEAB000X 1 3 2 2-22 SUOREHAM 2-23 SLUTH TEXAS 1 12 2-24 ST LUCIE 2 2-25 SUMMER 1 2-26 SUSOUEHANNA 1 &2 2-27 W1,Sl!INGTON NUCL E AR 1 1

2-23 UASHING10H NUCLEAR 2 i

2-29 UASHINGTON NUCLEAR 3 2-30 WATERFORD 3 2-31 UATTS 3AR 1 5 2 l

2-32 UCLF CREEK 1 2-33 ZIMMER 1 1

l l

l

  1. -A NRR LICENSING SY3 TEM PAGE NO: 2-1 BELLEFO::TE 1 &2 0L CURRENT STATUS REP 0RT REPORT AS OF 07/10/82 PLAN T CHARACT ER IST I C 5:

KEY PERS0NNELa DOCKET ND:

043810439 LIC. PM:

D.

SCALETTI ASLB CHAIR N/A A P r'L I C AN T :

TENNESSEE VALLEY AUTHORITY LIC. DC:

E. ADENSAM MEM:ER 1 N/A LOCATION:

6 MI NE OF SCOTTSBORD, ALA LIC. LA.:

M.

DUNCAN MEMBER 28 N/A REGION:

2 AE TVA COUNSEL:

B. PATON CONST. INSP R. CRLENJAK REAC. TYPE: PWR NSSS: BRW ANTITRUST:

J. RUTBERG RESID. INSP J. WILCOX DESIGN Pua: 3760 MMT/1235 MWE CLNST: TVA RM ANALYST:

M. KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE As a result of applicant's ccnstruction delay, the review schedule has been delayed. Tha applicant has ER DCCKETED:

06/12/78 06/12/78C announced a dolay in Icading tual to 12/84.

The ER SITE VISIT COMPLETE:

02/20/82 06/17/82C staff is currently evaluating the inpacts of this INPUT TO DES TO PM:

09/30/82 l

delay on tho safety revica schedulo.

ISSUE DES:

11/22/82 1

RESPONSE TO COMMENTS ON DES:

04/22/83 ISSUE FES:

05/20/83 CURRENT ENV. STATUS:

As a result of applicant's construction delay, the revica schedule was dolayed, and is bainq re-evaluated.

SAFETY / HEARING MILESTONES:

1ho environmental sito visit was completed on 6/17/82.

APPLICATION TENDERED:

02/03/78 02/03/78C SAR DOCKETED:

06/12/78C SAR Q'S RECEIVED BY PM:

07/03/80 04/02/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 08/01/82 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

08/13/82 No hearing is anticipated.

ISSUE DRAFT SER:

INPUT TO SER:

02/11/83 ISSUE SER:

03/10/83 ACRS FULL COMMITTEE MEETING:

04/15/83 INPUTS TO SE SUPPLEMENT 1 05/27/83 ISSUE SE SUPPLEMENT 12 06/24/83 FEt1A LETTER RECEIVED:

CURRENT ANTITRUST:

Pendinq dricrmination HEARING ST/.RTED:

N/A ASLB INITIAL DECISION:

N/A ASLB FINt.L DECISION:

N/A TECH SPECS COMPLETED:

07/29/83 COMMISSION DECISION:

08/00/83 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

09/00/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

On 06/03/82 TVA revised fuel load date to 12/84.

Staff is CONSTRUCTION COMPLETION - APPL.:

12/00/84 06/03/82 ovaluating impact on safety and environmental revicw cchedules.

.- _. ~

NRR LICEN5ING 3YSTEM PdGE HO: 2-2

.BRAIDWOOD 1 &2 0L CURREHT STATUS REPORT REPORT AS OF 07/10/82 PLANT CHARACTERISTICSt KEY P E R S 0 H H E L:

DOCKET NO:

045610457 LIC. PM:

K. KIPER ASLB CHAIR -

M. MILLER APPLICANT:

COMMONWEALTH EDISDN LIC. BC:

J. YOUNGBLOOD MEMBER 1 R. COLE LOCATION:

24 MI SSW CF JOLIET, ILL LIC. LA.:

M. RUSHBROOK

. MEMBER 2:

D. CALLIHAN-REGION:

3 AE:

S&L COUNSEL:

D. HASSELL CONST. INSP J. HEISLER REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID, INSP: L. MCGREGOR DESIGN PWR 3425 MWT/1120 MWE-CONST: CWE RM ANALYST M.

KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Several portions are under contract review.

ER DOCKETED:

11/30/78C PR SITE VISIT COMPLETE:

04/15/83 IdPUT TO DES TO PM:

11/01/83 ISSUE DES:

01/00/84 RESPONSE TO COMMENTS ON DES:

04/01/84 ISSUE FES:

06/00/84 i

CURRENT ENV. STATUS:

Inactive.

l SAFETY /HE/. RING MILESTONES:

APPLICATION TENDERED:

06/26/78 06/26/78C SAR DOCKETED:

11/00/78 11/30/78C SAR Q'S RECEIVED BY PM:

12/01/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 03/01/83 CURRENT HRG. STATUS.

' INPUT TO DRAFT SER TO PM:

05/01/83 There will be a contested hearing.

ISSUE DRAFT SER:

09/20/83 INPUT TO SER -

11/01/83 ISSUE SER:

12/01/83 ACRS FULL COMMITTEE MEETING 01/00/84 INPUTS TO SE SUPPLEMENT 13 04/01/84 i

ISSUE SE SUPPLEMENT 1:

05/00/84 i

FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST Applicant has submitted antitrust information pursuant to HEARING STARTED:

10/00/84 Roq. Guide 9.3.

ASLB INITIAL DECISION:

03/00/85 ASLB FINAL DECISION:

04/00/85 TECH SPECS COMPLETED:

09/00/84 COMi11SSION DECISION:

04/00/85 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

04/00/85 FSAR Amendment No. 37 NEW SLIPS / NOTES:

4 CONSTRUCTIDH COMPLETI0H - APPL.:

04/00/85 04/14/82

NRR LICENSZNG SV$ TEN PAGE NO: 3-3 DYRON 1 &2 0L CURRENT STATU$

REPQRT REPORT AS OF: 07/10/82 PLAN T CHARA CTER IST I C 5:

KEY P E R S 0 N N E L:

DOCKET NO:

045410455 LIC. PM:

S. CHESNUT ASLB CHAIR:

M. MARGULIES APPLICANT:

COMMONWEALTH EDISDN LIC. BC:

J. YOUNGBLOOD MEMBER 1:

R. COLE LOCATION:

17 MI SW OF ROCKFORD, ILL LIC. LA.:

M. RUSHSROOK MEMBER 2:

D. CALLIHAN REGION:

3 AE:

53L COUNSEL:

S. GOLDBERG CONST. INSP: M.. RING REAC. TYPE: PWR NSSS: WEST ANTITRUST:

3. V0GLER RESID. INSP: W.

FORNEY DESIGN FW2: 3425 MWT/1120 MWE CONST: CWE RM ANALYST:

M. KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER and Supplement I have been issued.

Several outstanding and confirmatory issues remain to be ER DOCKETED:

11/30/78C resolved prior to licensing.

ER SITE VISIT COMPLETE:

05/31/81 05/31/81C INPUT TO DES TO PM:

03/15/81 08/15/81C ISSUE DES:

11/05/81 11/05/81C l

RESPONSE TO COMMENTS ON DES:

03/01/82 03/01/82C l

l ISSUE FES:

04/05/82 04/05/82C l

I i

CURRENT ENV. STATUS:

Environmental review ccmpleted and FES (HUREG-0848) published in April 1982.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/26/78 06/26/78C SAR DOCKEIED:

11/00/78 11/30/7CC SAR Q'S RECEIVED BY PM:

08/15/81 08/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/15/8 1 10/15/81C l

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

11/07/81 11/07/81C In discovery. Hearing scheduled to commence in ISSUE DRAFT SER:

i l

August 1982.

INPUT TO SER:

01/07/82 01/07/82C ISSUE SER:

02/07/82 02/07/82C ACRS LETTER RECEIVED:

03/10/82 03/10/82C INPUTS TO SE SUPPLEMENT 2:

08/20/82 ISSUE SE SUPPLEMENT 23 09/18/82 FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Applicant has submitted antitrust information pursuant HEARING STARTED:

08/18/82 to Reg. Guide 9.3.

ASLB INITIAL DECISIDH 04/00/83 ASLB FINAL DECISION:

04/00/83 TECtf SPECS COMPLETED:

03/30/83 COMMISSION DECISION:

04/00/83 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

04/00/83 FSAR - Amendment 37 ER - Amendment 3 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

04/00/83 04/14/82

NRR L ICENS ING SYST EM PAGE NO:

2-4 CALLAWAY 1 0L CURR EN T STA TUS R EP0RT REPORT AS OF: 07/10/82 PL ANT CHARACTER I S T I C S:

KEY PERS0NN E L:

DOCKET NO:

05000483 LIC. PM:

G.

EDISON ASLB CHAIR:

J.

GLEASCN APPLICANT:

UNION ELECTRIC LIC. BC:

B. YOUNGCLOOD MEMDER 1:

G.

BRIGHT LOCATION:

10 MI SE OF FULTON. M0 LIC. LA.

M.

RUSHDROOK MEMBER 2:

J.

KLINE REGION:

3 AE:

BECH COUNSEL:

R.

LESSY CONST. INSP:

J.

LONKLIN REAC. TYPE: PWR NSSS: WEST ANTITRUST:

S. V0GLER RESID. INSP: J. NEISLER DESIGN PWR: 3425 MWT/1188 MWE CONST: DANIEL RM ANALYST:

D.

SCHWARZ CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SAR was docketed 08/08/80.

The SER was issued by HRC on 10/07/81 and the SER Supplement No. I was issued on ER DOCKETED:

12/12/80 12/12/80C 01/15/82.

ER SITE VISIT COMPLETE:

12/00/81 12/00/81C INPUT TO DES TO PM:

08/01/31 08/01/81C ISSUE DES:

09/29/81 09/29/81C RESPONSE TO COMMENTS ON DES:

12/01/81 12/01/81C 1

ISSUE FES:

01/29/82 01/29/82C l

CURRENT ENV. STATUS:

ER was docketed 12/12/80.

The DES was issued by HRC on 09/29/81 and the FES was issued on 01/29/82.

SAFETY / HEARING MILESTCHES:

APPLICATION TENDERED:

10/25/79 10/25/79C SAR DOCKETED:

08/08/80 08/08/80C SAR Q'S RECEIVED BY PM:

12/18/80 12/18/8 0C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/81 10/01/81C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

A board has been appointed to rule on the intervention ISSUE CRAFT SER:

N/A petition. Hearings were held on limi ted i ssues during INPUT TO SER:

09/11/81 09/11/81C November 1981.

The hearing on the one remaining ISSUE SER:

10/07/81 10/07/81C contention, emcrqency preparedness, is expected to begin October 12. 1982.

ACRS LETTER RECEIVED:

11/19/81 11/19/81C INPUTS TO SE SUPPLEMENT 1:

01/01/82 01/01/82C ISSUE SE SUPPLEMENT 1:

01/15/82 01/15/82C FEMA LETTER RECEIVED:

09/01/82 CURRENT ANTITRUST:

OL review is in progress.

HEARING STARTED:

11/17/81 11/17/81C ASLB INITIAL DECISION:

01/00/83 ASLB FINAL DECISION:

02/00/83 TECH SPECS COMPLETED:

N/S COMt1ISSION DECISION:

05/00/83 l

l ISSUE LIC. WITH POWER RESTRICTION: 06/00/63 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

10/00/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

The Caseload Forecast Panel has revised construction CONSTRUCTION COMPLETION - APPL.

06/00/83 04/14/81 completion from February 1983 to June 1983.

The June 1983 estimate is based on the applicant's revised fuel load date.

- g

NRR LICENSING SYSTEM PAGE NO: 2-5 CATAWBA 1 &2 0L CURRENT STATUS REPORT REPORT AS OF:-- 07/10/82 PLANT CHARACTERISTICSi~

KEY P E R S-0 N N E Li

~

DOCKET NO:

041380414 LIC. PM:

K.

JABBOUR ASLB CHAIR:

J. KELLEY APPLICANT:

DUKE PCWER LIC. EC E. ADENSAM MEMBER 1:

'D, CALLIHAN REGION:

2 AE DUKE COUNSEL:

G. JOHNSON.

MEM3ER 2:

R.

FOSTER LOCATION:

6 MI NNW OF ROCK HILL. SC LIC. LA.:

M. DUNCAN CONST. INSP: P. VANDOCRN REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP K. VAN DOORN DESIGN PWR 3582 MWT/1145 MWE CCNST DUKE RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

. ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER is scheduled to be completed 01/09/83.

ER DOCKETED:

.06/11/81 06/11/81C ER SITE VISIT CCMPLETE:

10/15/31 10/15/81C.

INPUT TO DES TO PM:

06/25/82 ISSUE DES:

08/05/82 q

RESPONSE TO COMMENTS ON DES:

11/01/82

.i ISSUE FES:

01/05/83 j

CURRENT ENV. STATUS:

DES scheduled to be issued on 08/05/82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

04/07/81-04/07/81C SAR DOCKETED:-

06/11/31:

06/11/81C SAR Q'S RECEIVED BY PM:

12/15/S1 12/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 08/16/82 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

08/31/82 Combined hearing anticipated to start 09/83.

. ISSUE DRAFT SER:

INPUT TO SER:

01/09/83 ISSUE SER:

02/06/83

.ACRS FULL COMMITTEE MEETING:

03/10/82 INPUTS TO SE SUPPLEMENT 1:

'04/12/83 ISSUE SE SUFPLEMENT 1:

04/30/83 FEMA LETTER RECEIVED:

03/30/83 CURRENT ANTITRUST:

Complete.

HEARING STARTED:

09/23/83

'ASLB INITIAL DECISION:

03/00/84 ASLB FINAL DECISION:

TECH SPECS COMPLETED:-

COM:1ISSION DECISION:

09/00/84

-ISSUE LIC. WITH POUER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

10/00/84 SCHED. DATE -RECEIPT DATE NEW SLIPS / NOTES:

CP Amend. Issued 12/23/80 indicating change in ownership.

. CONSTRUCTION COMPLETION - APPL.:

11/00/84 05/00/82 Staff is reassessing standard assumptions for projecting hearing schedules for plants with const, completion dates-bevond '82.

This re-assnss. may re, ult in a new scharfulo.

1

=-

l NRR L ICEN5I NG SYST EM

,PAGE NO: 2-6 CLINTON 1 & 2 0L CURRENT STA TUS REPORT REPCRT AS OF 07/10/82 PL A N T CHARACT ER IST I C S:

KEY P E R S 0 N N E L:

LIC. PM:

H.

WILLIAMS ASLB CHAIR:

H.

CLARK DOCKET ?!O:

346120462 LIC. EC:

J. t11LLER MET 1E ER 1:

G.

FERCUSON APP L I C AtlT :

IL lit!Ols PCUEN LCCATION:

6 it! E CF CLIMTON, ILL TIC. LA.

P.

AtOERSON MEMBER 2:

O. PARIS RLCION:

3 AE:

StL COUNSEL:

R.

00DDA7D CONST. INSP:

H. WESCOTT

E A C. TYPE: C L'R NSSS: GE ANTITRUST:

E. VOCLER R2SID. INSP: H.

LIVERMORE DECIGN Pa : 25 9 '+ f *WT/ 0 95 3 MWE CONST: DALONIN RT1 Atl ALYST :

M.

KIN 3 ENVIRONMEtiT AL f1ILESTONES:

SCHED. DATE ACTUAL DATE CURCENT SAF. STATUS:

FLA7 was docketed 09/03/80.

SER was issued 02/17/32.

Surplcment tio. I was i ssued 06/30/32.

ER COCKETED:

03/01/81 09/08/80C ER SITE VISIT CCMPLETE:

IN?UT TO DES TO PM:

12/08/31 12/08/81C ISSUE DES:

12/18/81 12/28/81C RESPONSE TO COMMJHTS ON DES:

02/22/82 03/25/82C ISSUE FES:

05/20/G2 05/20/82C CURRENT ENV. STATUS:

l The draft environmental statement was completed Docenbar I?St.

The FES was completed May 1902.

SAFELY / NEARING MILESTONES:

APPLICATION TENDZRED:

12/01/79 12/01/79C SAR DCCKETED:

09/08/80 09/08/80C SAR O'S RECEIVED BY FM SAR APfl. RESPONSE TO Q'S RECEIVED:

INPUT TO DRAFT SER TO PM:

CURRENT URC. STATUS:

Two petitions for leave to intnevene wore filed.

The ISSUE ERAFT SER:

Stato of Illinois filed under 10 CFR 2.715(c).

ItiP U T TO SER:

12/05/81 09/08/80C A prehearing was hold on 04/14/31.

A second ISSUE SER:

01/05/82 02/17 /82C prehaaring was hold 05/04/02.

ACES LETTER RECEIVED:

02/12/S2 03/09/82C INPUTS TO SE SUPPLEMENT 1:

06/11/82 0 6/11/82 C ISSUE SE SUPPLEt1ENT 12 03/31/82 06/30/82C FEMA LETTER RECEIVED:

N/S

(

CURRC'!T ANTITRUST:

l Operating licenso antitrust review completed HEARING STARTED:

11/00/82 March 15, 1902 (SEC(-82-120).

ASLB INITIAL DECISION:

09/00/83 ASLB FINAL DECISI0t::

10/00/83 TECH SPECS CC:1PLETED:

CCM:1ISSION DECISION:

12/00/83 ISSUE LIC. WITH P0MER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

01/00/83 LATEST AMENDMENT:

FStR Amendment #16, 05/82.

SCHED. DATE RECEIPT DATE NEW SLIPS /tf0TES:

IPC anncunced funI load date of 1/34 by letter dated CONSTRUCTION CCMPLETION - APPL.:

01/00/84 04/21/82 04/21/32.

~

NRR LICEN$ING SYSTEM PAGE NO: 3-7 Cat'ANC!!E PEAK 1 12 0L CURRENT STATUS REPQRT' REPORT AS OF 07/10/82 PLAN T CHARACTER IST I C S:

KEY P E R S 0 N N E L:

00CKET NC 0445104%e LIC. PM:

S. BURWELL ASLB CHAIR:

M. MILLER APPLICANi:

TEXAS UTILITIES CENERATING LIC. BC:

B. YOUNGBLOOD l1Ef1 DER 13 R. COLE LOCATION:

4 MI N OF GLEN ROSE, TEX LIC. LA.:

M. RUSHER 00K MEi1BER 2:

K. MCCOLLOM REGION:

4 AE:

G1H COUNSEL:

M. ROTHSCHILD CONST. INSP R.

TAYLOR REic. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP D. KELLY DESIGN ruR' 3411 MWT/1150 MWE CONST: BRRT RM ANALYST:

M.

ANDERSON CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTCHES:

SCHED. DATE ACTUAL DATE The SER uas istund 07/14/81 The staff deferred scheduling the Comancho Penk revico bt the ACRS until sufficient ER DOCKETED:

01/19/79 01/19/79C information vas provided to resolve a largo number of open ER SITE VISIT COMPLETE:

06/20/80 08/07/80C issuns.

S3ER 31 uns issued 10/16 /P 1 Application cas INPUT TO DES TO PM:

08/15/80 04/27/81C revirued by thu ACRS on 11/13/61.

SSER C2 responding to ISSUE DES:

04/30/51 05/22/81C the AORS was issund on 01/23/82.

SSER #3 is scheduled RESPONSE TO COMMENTS ON DES:

07/19/81 08/28/8tc to bo i ssued 09/30/L2.

ISSUE FES:

09/18/81 09/24/81C CURRENT ENV. STATUS:

The DES was issued on 05/22/81.

The EPA Federal Register Fotice was printed on 05/29/81 and the ccenent period SAFETY / HEARING MILESTONES:

ended 07c13/81.

The FES was issued on 09/24/81.

APPLICATION TENDERED:

03/01/78 03/01/78C SAR DUCMETED:

05/12/78 05/12/78C St.R Q'S RECEIVED BY PM:

12/30/78 02/22/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/08/79 01/31/80C CURRENT HRG. STATUS:

INFUT TO DRAFT SER TO PM 04/13/79 03/11/81C The first hnirinq session was hold 12/02/81 in Fort Worth.

ISSUE D7 AFT SER:

03/31/81 0 3/ 31/81C Issues heard were financial c;ualifications and the INPUT 10 SER:

05/22/81 07/08/81C oporating QA prcora.a.

The second hearing sesulon on ISSUE SER:

07/14/81 07/14/81C CA/CC during construction was held 06/07-11/C2.

A third hocrino session is scheduled to bo hold 07/26-30/82.

The ACRS LETTER RECEIbED:

11/17/81 11/17/81C fourth hearing scosion on the remaining contention, INPtITS TO GE SUPPLDIENT 3 09/21/82 c:ncrqency plans, is unscheduled.

ISSUE SE SUPPLEi1ENT 3:

09/30/82 FEMA LETTER RECEIVED:

03/01/83 CURRENT ANTITRUST:

ALJ appointed on 02/23/82 to replaco ASLB.

Prchrq HEARING STARTED:

12/02/31 12/02/81C confcronca hold 04/13/82 to determino status of parties.

ASLB INITIAL [ECISION:

09/00/02 Criofs filed 05/04/32 request inmediate imposition of ASLB FINAL DECISION:

10/00/02 settlement liconco conditions. A t1cmorandum and Order TECH SPECS CO:!PLETED:

05/03/83 05/00/83 epprovinq settienent agreements 2 proposed license COMMISSION DECISION:

. N/S conditiens & di smi ssing proceedings was i ssued 05/06/82.

ISSUE LIC. WITH POWER RESTRICTION:

LATE:T AtEND:ENT:

ISSUE FULL POWER LICENSE ANEND:

06/00/83 32 SCHED. DATE RECEIPT DATE NLM SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.'

06/00/83 10/29/81

MRR L ICENSING SYSTEM PAGE NO: 2-8 DIABLO-CANYOH 1 82 0L CURRENT STA TUS REPORT REPORT AS OF: 07/10/82 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

027510323 LIC. Pit:

1,. BUCKLEY ASLB CHAIR:

J. WOLF APPLICANT:

PACIFIC GAS 8 ELECTRIC LIC. BC:

F. MIRAGLIA T1EM3ER 1:

J.

KLINE LOCATION:

12 MI WSW OF SAN LUIS OBISPO LIC. LA.:

J.

LEE MEM3ER 2:

G.

DRIGHT REGION:

5 AE:

PGAE COUNSEL:

B. JCNES CONST. INSP:

D. KIRSCH REAC. TYPE: PWR NSSS: NEST ANTITRUST:

J.

RUIDERG RESID. INSP: J.

CARLSON I

DESIGN PWR: 333E MWT/1084 MWE CONST: PG1E RM ANALYST:

B.

ST MARY ENVIRCHMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

SSER 15 (Equip. Qualification) was issued on 10-02-81.

SSER 16 (Emergency Prep.) is estimated for 07/82 (indicated ER DOCKETED:

11/09/71 11/09/71C as SSER9 on schedule). ASLB decision on a full power ER SITE VISIT COMPLETE:

license is proiccted for July 1982.

Low powor licenso was INPUT TO DES TO Pf1:

10/09/72 10/09/72C issued on 09-22-81 and suspended on November 19, 1981.

ISSUE DES:

12/12/72 12/12/72C RESPONSE TO COMMENTS ON DES:

04/27/73 c4/27/73C ISSUE FES:

09/15/75 0 5/28/ 76 C CURRENT ENV. STATUS:

Complete SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

07/10/73 07/10/73C SAR DOCKETED:

10/02/73 10/02/73C l

SAR Q'S RECEIVED BY PM:

01/04/74 01/04/740 SAR APPL. RESPONSE TO Q'S RECEIVED: 11/01/74 11/01/74C INPUT TO DRAFT SER TO PM:

01/24/75 01/24/75C CURRENT HRG. STATUS LP hearings were held 05-19-81 through 05-22-81.

A ISSUE DRAFT SER:

favorablo PID on low power operation was issued July INPUT TO SER:

01/24/75 01/24/75C i

i 17, 1981 A full power hearing was completed on January ISSUE SER:

10/04/74 10/16/74C 26, 1982.

ACRS LETTER RECEIVED:

05/00/78 07/13/78C INPUTS TO SE SUPPLEMENT 9:

07/00/82 ISSUE SE SUPPLEMENT 9:

07/00/32 I

fella LETTER RECEIVED:

07/00/32 CURRENT ANTITRUST:

NEARING STARTED:

10/29/75 12/0"/76C Not required ASLD INITIAL DECISION:

07/00/82 ASLB FINAL DECISION:

08/C0/82 TECH SPECS COMPLETED:

09/15/81 09/15/31C CCM:1ISSICN DECISION:

ISSUE LIC. WITH PC'v'ER RESTRICTION: 09/22/81 09/22/81C ISSUE FULL POWER LICENSE AMEND:

N/S LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Est. of datos from and of LP hrq to lic. complete CONSTRUCTION COMPLETION - APPL.+

dependent upon dov./ approval of State and local Emergency Plans.

Ongoing Design Verif. Program likely to identify olant mods.

Const. comoletion dependent en ends.

l

NRR LICEN$ING SYSVEM PAGE NO:

2-9 ENRICO FERMI 2 0L CURRENT STATUS REPORT REPCRT AS OF: 07/10/82 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

05000341 LIC. PM:

L. KINTHER ASLB CHAIR:

G. MILLHOLLIN APPLICANT:

DETROIT EDISON LIC. DC:

J. YOUNGDLOOD MEMDER 1:

P. MORRIS LOCATION:

LAGUNA BEADN, MICH LIC.

LA.'

M.

RUSHDROCK MEMBER 2:

D.

SC?iINK REGION:

3 AE:

S&L COUNSEL:

C. WOODHElD CONST. INSP:

REAC. TYPE: EWR NSSS: GE ANTITRUST A.

H0DGDON RESID. INSP: B. LITTLE DESIGN PWR: 3292 MWT/1093 MWE CONST: DANIEL RM ANALYST:

D. SCHUARZ CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE An interim SER was issued on 09-29-77 and a final SER was issued on 07-10-81 (See second pago for milestone ER DOCKETED:

04/04/75 04/04/75C summary.)

SSER No. I was issued 09-25-81 SSER No. 2 was ER SITE VISIT COMPLETE:

09/27/78 10 /31/78 C issued 01-29-82 with 7 prelicensing issues outstanding.

INPUT TO DES TO Pit:

07/31/81 04/24/81C SSER No. 3 is scheduled for issuance on 09-01-82.

ISSUE DES:

05/01/81 04/30/31C l

KESPONSE TO COMMENTS ON DES:

07/31/31 06/29/81C ISSUE FES:

OG/31/81 09/04/81C CURRENT ENV. STATUS:

Addendum No. I to the FES was issued 03-03-82.

SAFETY / HEARING MILESTONES:

i f

APPLICATION TENDERED:

10/22/74 10/22/74C i

SAR DDCKETED:

04/05/75 04/05/75C l

St,R Q'S RECEIVED BY PM:

06/13/75 08/11/75C SAR APPL. RESPONSE TO Q'S RECEIVED: 08/29/75 01/12/76C 1

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/24/75 03/08/76C A hearing on two issues began on 03-31-82 and ended on ISSUE DRAFT SER:

04-02-82.

The two contentions were: (1) QA/QC during INPUT TO SER:

03/05/76 05/20/77C construction and (2) adequacy of evacuation plans for ISSUE SER:

08/01/77 09/29/77C the local community. Proposed findings completed by by applicant and staff.

ACRS LETTER RECEIVED:

08/23/31 08/11/81C INPUTS TO SE SUPPLEt1ENT 3:

08/15/82 ISSUE SE SUPPLEMENT 3:

09/01/82 FLMA LETTER RECEIVED:

08/01/82 CURRENT ANTITRUST:

An ASLB decision on antitrust matters was issued on HEARING STARTED:

12/02/31 03/31/82C 04-25-78.

ASLD INITIAL DECISION:

08/31/82 ASLB FINAL DECISION:

09/00/82 TECH SPECS COMPLETED:

04/01/83 COM;1ISSION DECISION:

05/01/83 ISSUE LIC. WITN POWER RESTRICTION: N/A LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

05/01/83 The latest final Safety Analysis Report Amendment is number 42.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.+

06/01/83 03/29/82

~

NRR LICENSING

$Y$ TEM

. PAGE NO: 2-10 FERMI 2 (FSAR RESUB)

OL. CURRENT STATUS REPQRT REPORT AS OF 07/10/82 i

PLANT CHARACTERISTICS:

KEY P E R S 0 N N E L:

DOCKET NO:

00007341 LIC. PM:

L. KINTNER ASLB CHAIR

  • G. MILLHOLLIN APPLICANT:

DETROIT EDIS0rt LIC. BC:

J.'YOUNGBLOOD MEMBER 13

-P.

MORRIS LOCATION:

LAGUNA BEACH, MICH LIC. LA.:

M. RUSHBROOK MEM3ER 2:

D. SCHINK REGION:

3

~

AE:

$8L COUNSEL:

C. UOODilEAD CONST. INSP:

REAC. TYPE: BWR HSSS: GE ANTITRUST:

A. H0DGDON RESID. INSP: B. LITTLE i

DESIGN PWR 3292 MWT/1093 MWE CONST: DANIEL RM ANALYST D. SCHWARZ CURRENT SAF. STATUS:

All information on this page reflects the FSAR resubmittal. tho SAR resubmittal was docketed on 06-01-78 and the safety review was completed. A final SER was issued on 07-10-81.

Summary of later milestones is on previous page.

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTGNES:

' APPLICATION TENDERED:

'10/22/74 10/22/74C SAR DOCKETED:

'06/01/78 06/01/78C SAR Q'S RECEIVED BY PM:

07/01/78 08/02/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 08/08/78 10/02/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

09/08/78

-03/27/81C i

ISSUE DRAFT SER:

^

INPUT TO SER:

06/10/81 06/23/81C ISSUE SER:

06/30/81 07/10/81C CURRENT ANTITRUST:

LATEST AMENDMENT:

I

[

NEW SLIPS / NOTES:

i All information on this page reflects the FSAR l

resubmittal. The schedule for input to the SER slipped due to slippage in the fuol load dato because of TMI D3USP.

l l

.m._. _ _

i m

4 _ _ _ _ -.. _.. _

NRR LICENSING SYSTEM PAGE NO: 2-11 GRAND GULF 1 12 LIC CURRENT STATUS REPORT

  • REPORT AS OF 07/10/82 P.L A N T C H A R A C T E R I S T I C S:

KEY PERS0NNEL DOCKET NO:

04168F417 LIC. PM:

D. HOUSTON ASLB CNAIR: N/A APPLICANT:

MISSISSIPPI PCWER & LIGHT COMPANY LIC. BC:

A.

SCHWENCER MEMBER 1:

N/A LOCATION:

25 MI S OF VICKSDURG, MISS LIC. La.:

E. HYLTON MEMBER 23 N/A REGION:

2 AE:

BECH COUNSEL:

M. WAGNER CONST. INSP: R. VANDORN REAC. TYPE: BWR NSSS GE ANTITRUST:

B. V0GLER RESID. INSP:

A. WAGNER DESIGN PWR: 3833 MWT/1250 MWE CONST: BECH RM ANALYST:

B. ST F1ARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER was issued on September 10, 1981.

An initial ACRS mocting was hold Oct. 15, 1981 SSERs were issued in ER DOCKETED:

06/05/78 06/30/78C December 1981 and in June and July 1982.

A second ACRS ER SITE VISIT COMPLETE:

12/14/79C mooting is scheduled for August 1982 on Hydrogen and INPUT TO DES TO PM:

04/30/81 04/30/81C HCU floor loads.

ISSUE DES:

05/31/81 05/31/81C RESPONSE TO COMMENTS ON DES:

08/15/81 08/15/81C ISSUE FES:

09/15/81 10/09/81C CURRENT ENV. STATUS:

DES was issued in May 1981 FES was issued October 9, 1981 SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

04/28/78 04/28/78C SAR DOCKETED:

06/05/78 06/30/78C SAR Q'S RECEIVED BY PM:

04/24/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/01/80 09/30/80C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S Ho hearing is scheduled.

ISSUE DRAFT SER:

09/18/81C INPUT TO SER:

04/01/81 08/14/81C ISSUE SER:

06/00/81 09/10/81C ACRS LETTER RECEIVED:

08/20/82 INPUTS TO SE SUPPLEGENT 48 08/15/81 07/01/82C ISSUE SE SUPPLEMENT 4 09/03/82 1

FEMA LETTER RECEIVED:

08/10/82 CURRENT ANTITRUST:

OL review is in prooress. No significant changos have HEARING STARTED:

N/A occurred since the CP.

ASLB INITIAL DECISION:

N/A ASLB FINAL. DECISION:

TECH SPECS CUMPLETED:

09/01/81 06/16/82C COMMISSION DECISION:

09/00/82 ISSUE LIC. WITH POWER RESTRICTION: 04/23/82 06/16/32C LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

09/00/82 SCHED..DATE RECEIPT DATE NEW SLIPS / NOTES:

An operating license for Unit 1 authorizinq fuel load CONSTRUCTIDH COMPLETION - APPL.:

06/16/82C and up to 5% power operation was issued 06/16/82.

.NRR LICENSZNG SVSTEM PAGE NO: 2-12 HARRIS 1 82 0L CURRENT' STATUS REP 0RT REPORT A'S OF: 07/10/82 PLANT CHARACTERISTICS

. KEY PERS0NNELe DOCKET NO:

0400-0401 LIC, PM:

E. LICITRA ASLB CHAIR:-

J. KELLEY APPLICANT:

CAROLINA POWER 1 LIGHT LIC. BC:

F. MIRAGLIA MEMBER 1:

G. BRIGHT LOCATION:

20 MI SW OF RALEIGH, NC LIC. LA.:

J. LEE MEMBER 2:

J. CARPENTER REGION:

2 AE:

EBASCO COUNSEL:

C..BARTH CONST. INSP:

REAC. TYPE: PWR NSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP G. MAXWELL DESIGN PWR: 2775 MWT/0915 MWE CONST: DANIEL KM ANALYST:

M. ANDERS0H CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE FSAR was docketed on 12/22/81 Review has started.

Questions from most review branches have been sent to ER DOCKETED:

12/22/81 12/22/81C the applicant.

ER SITE VISIT COMPLETE:

04/08/82 04/08/82C INPUT TO DES TO PM:

08/15/82 ISSUE DES:

10/01/82 RESPONSE TO COMMENTS ON DES:

01/08/83 ISSUE FES:

03/31/83 i

CURRENT ENV. STATUS:

ER was docketed on 12/22/81 The site visit was complete on 04/08/82 and questions were sont to applicant on SAFETY / HEARING MILESTONES:

04/28/82.

1 APPLICATION TENDERED:

06/26/80 06/26/80C SAR DOCKETED:

12/22/81 12/22/81C SAR Q'S RECEIVED BY PM:

07/01/82 l

SAR APPL. RESPONSE TO Q'S RECEIVED: 08/02/82 CURRENT HRG. STATUS'

. INPUT TO DRAFT SER TO PM:

10/15/82 Notico for Opportunity for Hearing was published in the ISSUE DRAFT SER:

12/01/82 Federal Rogister on January 27, 1982.

Several petitions INPUT TO SER:

06/01/83 were filed.

Prehoaring conference on petitions was hold ISSUE SER:

07/08/83 on July 13-14, 1982.

ACRS FULL COMMITTEE MEETING:

08/11/83 INPUTS TO SE SUPPLEMENT 1:

12/01/83 ISSUE SE SUPPLEMENT 1:

01/09/84 FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Status to be determined.

HEARING STARTED:

06/01/84 ASLB INITIAL DECISIDH 11/01/84 ASLB FINAL DECISION:

11/00/84 TECH SPECS CCl1PLETED:

11/01/84 COMMISSION DECISION:

11/00/84-ISSUE _LIC. WITH POWER RESTRICTION:

12/01/64 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/01/84 No. 2 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

12/01/84 04/14/82

NRR LICENSING SYSTEM PoGE NO: 3-13 LASALLE 1 1 2 LIC CURRENT STA TUS REP 0R T REPORT AS OF 07/10/82 PL ANT CHARACT ER I5T I C St KEY PERS0NNELa DOCKET NO:

037330374 LIC. PM:

A.

BOURNIA ASLB CHAIR:

M. MILLER APPLICANT:

COMM0HWEALTH EDISON LIC. CC:

A.

SCHWENCER MEMBER 18 F. SNON LOCATION:

11 MI SE OF OTTAMA. ILL LIC.

LA.+

E. HYLTON MEMBER 2:

0. PARIS REGION:

3 AE:

SSL COUNSEL:

C. WOODHEAD CONST. INSP H. WESCOTT B' R NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP: W. GULDEMOND REAC. TYPE:

W DESIGN PWR: 3293 MWT/1078 MWE CONST: CWE RM ANALYST:

D.

SCHUARZ CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTCHES:

SCHED. DATE ACTUAL DATE SSER-1 was issued in June 1981 SSER-2 was issued in February 1982.

$$ER-3 was issued on April 16, 1932.

ER DOCKETED:

01/17/77 05/12/77C SSER-4 was issued on July 14, 1982.

A low powor ER SITE VISIT COMPLETE:

01/12/77 06/15/77C Ilcenso to permit fuel load and low power testing was INPUT TO DES TO PM:

02/t7/78 02/17/78C issued on April 17, 1982.

ISSUE DES:

03/22/78 03/29/78C RESPONSE TO COMMENTS ON DES:

07/14/78 07/t4/78C ISSUE FES:

09/22/78 11/03/78C CURRENT ENV. STATUS:

Envirenmental Protection Plan has been issued.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

09/01/76 09/01/76C SAR DOCKETED:

04/08/77 05/12/77 C SAR C'S RECEIVED BY PM:

07/C8/77 07/27/77C SAR APPL. RESPONSE 10 Q'S RECEIVED: 11/20/77 08/18/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/06/78 11/08/78C No boaring.

ISSUE PRAFT SER:

INPUT TO SER:

12/29/78 02/27/81C ISSUE SER:

09/05/80 03/05/81C ACRS LETTER RECEIVED:

04/09/81 04/16/81C INPUTS TO SE SUPPLtMENT 4:

06/29/82 06/29/82C ISSUE SE SUPPLEMENT 4:

07/14/82 07/14/82C TEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Completo.

HEARING STARTED:

N/A ASLL INITIAL DECISIDH N/A ASLD FINAL DECISION:

N/A TECH SPECS CCMPLETED:

04/12/82 04/12/82C CCUMISSION DECISION:

07/20/82 ISSUE LIC. HITH POWER RESTRICTION: 04/17/82 04/17/82C LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

07/23/82 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Plant criticality was achieved on June 21, 1982.

CONSTRUCTION COMPLETION - APPL.:

0 4/17/82C 04/17/82

_x m

HRR LICEHSIHG SVSTEM PAGE HO: 2-10 LIMERICK 1 & 2 0L CURRENT STAVUS REPORV REPOR7 AS OF: 07/1c/82 PLAHT C H A R A C T E R I S T I C S:

KEY P E R S 0 H H E Lt.

DOCKET NO:

035210353 LIC. PM:

H. ABELSON ASLB CHAIR:

L. BRENNER APPLICANT:

PHILADELPHIA ELECTRIC LIC. DC:

.A.

SCHWENCER '

MEM3ER 1:

R. COLE LOCATION:

35 MI HW OF PHILALELPHIA, PA LIC. LA.:

E. HYLTON MEM3ER 2:

P. f102RIS REGION:

1 AE BECH COUNSEL:

S.

LEWIS CONST. INSP REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP DESIGH PWR 3440 MWT/106S MWE CONST: BECH RM ANALYST M. ANDERSON CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE i

Applicant submitted Probabilistic Risk Assessment with i

FSAR on March 17, 1981.

SAR was docketed on 07/27/81.

ER DOCKETED:

07/27/81 07/27/81C PRA under review by Brookhaven Hattonal Laboratory; ER SITE VISIT COMPLETE:

08/20/82 HUREG/CR on PRA scheduled for issuance 11/30/82.

INPUT TO DES TO FM:

03/25/83 ISSUE DES:

05/06/83 RESPCNSE TO COMMENTS ON DES:

09/06/83 ISSUE FES:

10/31/83 CURRENT ENV. STATUS:

ER was tendered with the FSAR on March 17, 1981 and i

was docketed on 01/27/81 ER site visit is scheduled to SAFETY / HEARING MILESTONES:

i take place on 8/20/82.

APPLICATION TENDERED:

01/00/88 03/17/81C SAR DOCKETED:

07/27/81 07/27/81C SAR-Q'S RECEIVED BY PM:

07/03/82 SAR APPL. RESPONSE TO Q'S. RECEIVED: 10/07/82 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM 01/07/83 Notice of Oppor.tunity of Hearing was published in the ISSUE DRAFT SER:

02/04/83 Federal Register on August 21, 1981 Pre-hoaring INPUT TO SER:

07/01/83 conference held January 6-8, 1982.

A special pre-hearing ISSUE SER:

08/08/S3 conference order was issued on June 1, 1982.

ACRS FULL COMf1ITTEE MEETING:

09/08/83

' INPUTS TO SE SUPPLEMENT 1:

10/07/83 ISSUE SE SUPPLEMENT 1:

10/30/83 FEMA LETTER RECEIVED:

10/07/83 CURRENT ANTITRUST Status to be determined.

HEARING STARTED:

04/00/84

'ASLB INITIAL DECISION:

09/00/E4 ASLB FINAL DECISION:

10/00/84 TECH SPECS C0ftPLETED:

N/S C0flMISSION DECISION:

10/00/84 ISSUE LIC. WITH POWER RESTRICTION:

10/00/84 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

N/S 29,, March 31, 1982 (ER OL) 35, June 30, 1982 (FSAR)

SCHED. DATE RECEIPT DATE-i NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

10/00/84 04/27/82

NRR L1CENS1NG SVSTEM PAGE NO: 2-15 MCGUIRE 2 0L CURRENT STATUS REPQRT REPORT AS OF: 07/10/82 PLANT CHARACTERISTICS:

KEY P E R S 0 N N E L:

DOCKET NO:

05000370 LIC, PM:

R. BIRKEL ASLB CHAIR:

R. LAZO APPLICANT:

DUKE POWER LIC. BC:

E. ADEMSAM MEMBER 1:

X. HAND LOCATION:

17 MI N OF CHARLOTTE, NC LIC. LA.4 M.

DUNCAN MEMBER 2:

E. LUEBKE REGION:

2 AE:

DUKE COUNSEL:

J. CUTCHIN CONST. INSP: M. HUNT REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B.

V00LER RESID. INSP:

P.

BEMIS DESIGN PWR: 3411 MWT/1180 MWE CONST: CUKE Rf1 ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Input for SSER 6 (SSER for unit 2) is due to DL on 12/01/82. with issuance of tho supplement scheduled ER DOCKETED:

05/31/74 05/31/74C for 01/01/83.

ER SITE VISIT COMPLETE:

01/30/75 01/30/75C INPUT TO DES TO PM:

08/29/75 03/29/75C ISSUE DES:

11/07/75 10/29/75C RESPONSE TO COMMENTS ON DES:

ISSUE FES:

05/07/76 04/20/76C CURRENT ENV. STATUS:

Complete.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

04/05/74 04/05/74C SAR DOCKETED:

04/29/75 05/05/75C SAR Q'S RECEIVED BY PM:

SAP APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

Complete.

ISSUE DRAFT SER:

INPUT TO SER:

06/01/77 01/16/78C ISSUE SER:

02/21/78 03/01/78C ACRS LETTER RECEIVED:

04/14/78 04/14/78C INPUTS TO SE SUPPLEMENT 6:

12/01/82 ISSUE SE SUPPLEMENT 6:

01/01/83 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

Completo.

HEARING STARTED:

03/15/77 03/28/77C ASLD INITIAL DECISION:

06/00/81 06/08/81C ASLB FINAL DECISION:

TECH SPECS COMPLETED:

COM:1ISSION DECISION:

03/01/83 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE. FULL POWER LICENSE AMEND:

04/01/83 SCnED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CCNSTRUCTION COMPLETION - APPL.:

04/01/83 05/20/82

N R.R L I C E.H S I N G SYSTEM PAGE NO: 3-16 j

MIDLAND 1 &2 0L CURRENT. STATUS REP 0RT REPORT AS OF: 07/10/82 PLANT CHARACTERI$TICSt KEY PERS0NNELa DOCKET NO:

033080329 LIC. PM:

R. HERNAN ASLB CHAIR:

C. BECHHOEFER APPLICANT:

CONSUMERS POWER LIC. BC:

E. ADENSAM.

MEMSER 1:

F. COWAN 1

LOCATION:

SW BOUNDARY OF MIDLAND, MICH.

LIC. LA.:

M.

DUNCAN MEMBER 2:

J. HARBOUR REGIGN 3

AE:

BECH COUNSEL:

W. PATON CONST. INSP: R. CC0K i

REAC. TYPE: PWR NSSS: B8W ANTITRUST B. V0GLER RESID. INSP R. COOK DESIGN PWR: 24S2 MUT/0818 MWE CCNST: BECH RM ANALYST:

M. ANDERSON

]

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTCNES:

SCHED. DATE ACTUAL DATE Utilization of National Laboratorios or otner agencies to completo somo review arcas is currently ER DOCKETED:

04/01/78 04/14/78C in progress. CP extension was issued 12/28/81. ACRS ER SITE VISIT COMPLETE:

09/08/73-09/08/78C' Full Ccmmitteo Mcoting was hold 06/3-S/82.

SSER #1 INPUT TO DES TO PM:

N/S responding to ACRS letter was issued 6/30/82.

ISSUE DES '

02/05/82 02/05/82C RESPONSE TO COMMENTS ON DES:

07/08/82 07/08/82C,

ISSUE FES:

07/20/82 4

CURRENT ENV. STATUS:

The DES was issued 02/05/82. FES to be issued in July, 1?82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

08/31/77 08/31/77C SAR DOCKETED:

09/30/77 11/18/77C SAR Q'S RECEIVED BY PM:

03/20/78 10/02/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/08/78 12/08/78C-i CURRENT HRG. STATUS:

INPUT.TO DRAFT SER TO PM:

11/01/78 12/01/78C i

Throo prehearings ending 04/27-28/81 woro held for a ISSUE' DRAFT SER:

s:parato hearing on soils settlemont. Hearing'on soils INPUT TO SER:

04/23/89 04/23/82C settlement began July 7, 1981 and is continuing.

ISSUE SER:

05/11/82 05/11/82C l

Discovery phaso for LL hearing is in progress.

i ACRS LETTER RECEIVED:

06/15/82 06/08/82C l

INPUTS TO SE SUPPLEMENT 1:

06/10/82 06/10/82C ISSUE SE SUPPLEMENT 1:

'06/30/82.

06/30/82C FEMA LETTER. RECEIVED:

07/30/82

~

CURRENT ANTITRUST:

Proceeding completed. License was amended 10/20/80.

HEARING STARTED:

11/16/82 ASLB INITIAL DECISION:

06/30/83 ASL3 FINAL DECISION:

07/00/83 i.

TECH SPECS COMPLETED:

06/25/82

.CCMMISSION DECISION:

07/00/83 ISSUE LIC. WITH POWER RESTRICTIDH LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMENDS.

~

103 l

SCHED. DATE - RECEIPT DATE l

NEW SLIPS /HOTES:

l CONSTRUCTION COMPLETION - APPL.:

07/31/33-

.12/31/81

~ ~--.

~

4 1'

NRR LICENSING SY$ TEM PAGE NO 2-17 PALO VERDE 1,2,3 0L CURRENT STATUS REPORT REPORT AS OF: 07/10/82 PLANT C H A R A C T E R I S T I C S:

KEY P E R S O N N E L:

DOCKET NO:

0528-OS3C LIC. PM:

E. LICITRA ASLB CHAIR:

R. LAZO APPLICAMT:

ARIZONA PUBLIC SERVICE LIC. EC:

F. MIRAGLIA MEMBER 1:

R. COLE LOCATION:

36 MI W OF Fi!0ENIX, AZ LIC. LA.:

J. LEE met 13ER 2:

D. CALLIHAN REGION:

5 AE:

BECH COUNSEL:

'L.

DEWEY CONST INSP: L. VBRUEGGEN REAC. TYPE: PWR NSSS: COMR ANTITRUST:

B. V0GLER RESID. INSP: G..FIORELLI i

DESIGN PMR: 3817 MMT/1304 MWE CONST: BECil Rf1 ANALYST:

D. SCllWARZ CURRENT SAF. STATUS:

ENVIRON 1 ENTAL MILESTONES:

SCHED. DATE ACTUAL DATE

?

The safety OL review is in progress.

Several "Independant Design Review" moatings have bcon completed. The SER ER DOCKETED:

07/01/80 06/20/80C was i ssued en Novembnr _11, 1931 The SER supplomont ER SITE VISIT COMPLETE:

01/30/81 01/30/81C Nos. 1 and 2 were issued on February 5,'1982 and May 17, INPUT TO DES TO PM:

10/05/81 10/05/81C-I 1932, respectively. SSER-3 is scheduled to bo issued on ISSUE DES:

10/26/81 10/26/81C July 30, 1982.

RESPONSE TO COMMENTS CN DES:

02/25/82 02/25/82C ISSUE FES:

03/11/32 03/11/82C CURRENT ENV. STATUS The ER (OL) revice i s complete. A site visit was completed on January 30, 1931.. The DES was issued on SAFETY / HEARING MILESTONES:

October 26, 1981 and the FES was issued on March 11, 1982.

APPLICATION TENDERED:

10/05/79 10/05/79C 1

SAR DOCKETED:.

06/20/80 06/20/80C-SAR C'S RECEIVED BY PM:

f SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

IMPUT TO DRAFT SER TO PM:

Fivo contentions were initially admitted. Two contentions ISSUE DRAFT SER:

i have been subscauently dropped by the intervenor end two INPUT TO SER:

10/30/81 10/30/81C 4

ethers were summerily dispesed of by the Board.

T ho -

ISSUE SER:

11/11/81 11/11/81C remainino contention deals with water availability.

The hearing started April 27-30, 1982, resumod on May ACRS LETTER RECEIVED:

12/18/81 12/18/81C 25-28, 19C2 and again on June 22, 1982.

Hearing record INPUTS TO SE SUPPLER 1ENT 3:

07/09/82 has been closed.

ISSUE SE SUPPLEMENT 3:

07/30/82 FET1A LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Antitrust CL review is in progress.

HEARING STARTED:

04/27/82 04/27/82C ASLB INI;IAL DECISION:

10/30/82 ASLD FINAL DECISION:

11/00/82 TECll SPECS COMPLETED:

11/01/82 C0f01ISSION DECISION:

11/00/82 ISSUE LIC MITH POWER RESTRICTION: N/S LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

11/01/82-FSAR Amenduont No. 3 ER Supplenent No. 4 SCHED. DATE RECEIPT DATE NEM SLIPS / NOTES:

-11/01/82 05/12/82 Caseload Forecast Panel estimates for construction CONSTRUCTION COMPLETION - APPL.:

ccepletion on Units 1,

2, and 3 are being re evaluated as a result of a March 1982 site visit.

t 8 2 E

1 8

T

/

E 0

T C CC; CC CCCC A

2 1

A 1

22 01 2222 D 2

/

D 8 88' 88 8888 8

7

/ ///

//

////

T

/

O 0

R L

9 160 60 4604 P 2 N

E A

1 023 23 2212 I

2 HE N

U / ///

//

////

E /

E F CNN D T

6 126 61 2255 C 2 G O OIO L

C 0

000 00 0000 E

0 R

A LLH I

A P S BKS G A

E E

T T

PJF M T

R A

1 2222 01 2222 2222 23333 3 A 3 O

D 8 8888 88 8888 8888 88888 8 D 8 PP

/ ////

//

//// //// ///// /

/

P 605 69 4600 6690 00000 0

0 E

R SS 6

1 R

I: : NN D 2 0230 20 2211 1120 00000 0

D 0

A12II E

/ ////

//

//// ////

/////S/

E

/

H H

6 1267 61 2245 7772 14560/0 H

1 CRR..

C 0

0000 00 0000 0001 10001N1 C

1 S

EETD S

BBBSI D

LMMNS E

N SEEOE AMMCR V

O I

I:

E TD L

C CN P

E IE P

S R

RM A

TA R

E E

D S

1 S

M EE 0C N Z

Q P

T RS N

L NNNIRR N

M N2 RE I

E O

S N

O AEOSEA N

E FWTSLW S

T E

PO O

E1 :

T EHLEGH E

E

- S N D T

T DM D O: D: EC T

N TCYH0C N

L:

T O E Y EETE INENWI E

R SSHTVS O

PM N T

R BE R VLNV SOTOOL L

N T

MP E S E S

E IPEI IIEIP P

CSLS R M

S O

M E D -DN S:

EPME M O 0 JAEJBD E

CO M L

N EO R

CUEC DEIPIHE O

E P L

T O

I E VP TE ESLE EDCMCTW C

S I

T C

M T: IS FS:

R PR T EOEIO

IS DEE A R EP RLDCDWP N

M T

E R

T DSE O G NECR RTE RSUR AA O

TS L

EID: T:

N OTE DFS:

E SE TILSN

.L I

S R

.:SY A TV S S I

IER.

A R TO T

STACOCL T

E : :

Y MCALUL T

E OEEE R

TK L

OROE TTET INEIIU C

P PBLERA N KETDSF A ACSP TDTS E SE GNIPSLF U

S S STN E

CT N

E CO' P LS L

NIFSS R

...NIA M OITEOE H

IDQA TETE TE I

IEE T

U CCCUT N DSUUPU

/

L UUUU SUUA RBBHMUU S

Y IIIONM O

PSSS Y PRRR PSPS RPSM ALLCMSS N

G T

LLLCAR R RRNSES T

PAAA NSNS CNSE ESSEOSS O

E I

EEIIRI E ASSS IIII AIIF HAATCII C

N A V

F K

N A

I T

E S

5 S g

N n

i E T 2.

, r 82 1

a C N 98 19 8

e e

9 h

t I

E 1

n 1

s L R 29,

u ss u

828 J

n,na r

R 9-S i8o t

8y nE 2id i

1 1

te t

R U R

2l oF E

y u 8 ynt n

R C S

aeJ d

9l et a

G L

I Mn e.

1 uti

,Jnm L

4 N IEA un t1 id O

I GGK nJo e8 i

l92 3d a

L TO nd p18 et AI m

2the o,9 NH

T dol 0

1 agr d

S IO SS e e edi e e

SN udh c9',

M 1

n ew t

C U ESO sl LEANC ses s

3 us e

I LL iha ae1 Jr.s l

IL w

wn e2n p

T I

ss ut dd8 o -

m CV aag wJs lr9i o

S IS E

wwn e u eO1t c

idg h

a RE W

i I

TN M

t gt veu d,c n

CI rne eta sr3i e

R EA S

oi e re aa f

e LP 0

ptm kr wohi b

E E

2 ee eco B cl Ree cof e ra s'.

F 1

T 1DO

/

me nd cyau aw 4N T

n t

a d nBM q he C 4AE W

oet tse e

i r

wv e.dl 0LN M

i ei pal na ee

)

ewu A

8E ttm

c d
foai ir 2

atm 0VI 8

R 4EM R5 S ui o ScRe Sni c

v

. 8 er 4L W7 Ul mc UaEh Uoh1 n A

0C73B3 Tam T

c TcO8a Tre

7 Avol Ales A

9n S d T2 H

TEcl Tah Tg,1i Utn N-S Rsu E5 E S bu StTs Sne,f il Tu M(

T ER yuf n i C

OT:

PW

.t s

.e

.rl2g Irs D

O NNN YP Fe S Vm.e Gai n

Tti N7 N 2

AO:T AfSR Nn1 c Revri.

Ni E

/

T TCIN N

SaRC Eo8n Hhseds Ats Mr S 4

EITO

.G SCA r9a eebue nu Ae P u

Trnolu Tat b

I N

KLAICI T A Ti1 1

CPCGAS Ne e Nv s N pit c s N

a Tm L

A OPOEEE Ehnh En,s E

acns EPt Su S Y

DALRRD RTAT RE9I RAPOii RCs EN R

L R

R R

R T

W R

U U

U U

A E

E P

C C

C C

L N

P l

l*

l!l l1 l

lil l

j il Ill' jll1li)ll

,lll llllllIl'lll1llIlI1 ll 11 9

2 1

8 E

/

E T

0 T

CC CCC A

D A

12 112 D 2 2

1

/

E D 88 888 8

7 N

//

/ / /

T

/

O 0

G L

52 456 P 5 N

RK I

A 22 221 I

1 EC SH U //

/ //

E /

E F T1 ESC T

81 482 C

4 1

G O TtLAA C

00 001 E

0 A

OEONE A

R P S CRCUB A

E E

T BFR A T

T R

A 1234 4

1112 3

33 444 455 5

5 A

5 O

D 8888 8 8888 8 88 888 888 8 8 D 8 P

PP

//// /

//// / // ///

/// / /

/

E R

SS 5299 8

4571 4

42 303 000 0

0 0

R I: :NN D

2200 0

2200 0

00 100 000 0

0 D

0 A12II E

//// /

////

/S//

///S

/// / /

E

/

H H

8121 6

4828 3/12 145/

034 4

4 H

4 CRR..

C 0010 0

0010 0N11 000N 100 0

0 C

0 EETD S

S BBBSI LtMNS D

1 SEEOE E

N AMMCR V

O I

I:

E TD-L C

CN P

E IE P

D S

R G

RM A

ER E

N TA NE D

S I1 S

M T

EE GC L

INH R

N M

EN1 N

O

Q P

ET RS N

SECYE E

O S

E SWIELG S

T E

PO O ME1 :

N :

RE I

T AHLMGN E

E S

N D T

T M D O:D EC T

N NCYE0I N

L:

T O

E Y

ELTE INEHWI E

R USHDVK O

PM N T

R BE R ELNV SOTDOL L

N T

MP E

S E

S E TPEI IIEIP P

M 0 S

O M

E D DN S:

TPME

CSLS R

M 0

AELBM E

CO M

L N

EO R

IUEC DEIPIHE O

E P L

T O

I E

VP TE MSLE EDCMCTW C

S I

T C

M T: IS FS:

M PR T

EOEIO T

E M : IS DEE A

R OEP RLDCDWP N

R

T DSE O G NECR RTE CSUR AA O

S R TS L

EID: T:

N OTE DFS:

SE TILSN

.L I

E

.SY A

TV S S I

IER A R LO T

STACOCL T

Y MCALUL T

E OEEE R

TK L

OROE LTET INEIIU C

P PBLERA N

KETDSF A

ACSP TDTS U SE GNIPSLF U

S S STN E

CT N

E CO P FS L

NIFSS R

...NIA M

OITEOE H

I D 'Q A TETE TE I

IEE T

U CCCUT N DSUUPU

/

L UUUU SUUA RBBHMUU S

Y IIION1 O

PSSS Y PRRR PSPS RPSM ALLCMSS N

t R

RRNSES T

PAAA NSNS CNSE ESSEOSS O

G T

LLLCAR E

I EEIIRI E ASSS IIII AIIF HAATCII C

N A V

F K

N A

I T

E S

$ S N

c E

T u

d C N 4

r 8

e o

I E

o

/

h s

f 9

t a

L R

0 c

.d

/

n R

1 e 1

i s

8t 0

i d

h R U

/o 1

4g 8r e

t R C 2r

/o h

W W

/a 4f s

n N

8E8 4t 2

l o.

5G5 0

/d I

L A

R 4e b

wo L

nE 0t u

el 0

t

T oS e

p iu S

, SS ng vd E SN gt or s

eo C

CESO nf a

a rh UANC i a gt w

c I

SO tr n

es ER eD iS g

h T

I k

tE n

tn eD i

o TN c.

o k

r fi S

IG E

a.

ot LT W

d1 c.

o e1 c

I IA M

8 TB r/

d1 H8 yu R

U 4

o5 8

/

tr F

3 f2 r/

r4 it E

SO 9

/

o5 o0 rs E

0 R8 f2 f/

d on T

9TW

/

A0

/

9 e

io 5AN T

S R8 y0 n

rc C

4TN W

Fn E0 t

i p

0S M

o n

m n

A 1

I d

dn ino r

ei

  • eo
u e

h 8FM 5

ed R

5L R1 Sro Sr Str t

tp 4U4 W0 Uet Ued Ure e

i A 0G24B3 Tde Tde Tot Td dl Ank Ant A ps S

T

es 2

H Tec Tee T pi Ue N

Ss Sto Stk SOg Rb E

Eih 8

C : :

ER d

c e

T M. Oen Tvt OT:

PW

.t

.t o

.fR I o D

NNN YP Fns Vnd Go Tt N3 Nro 1

AO: T Aaa Na R

l N

E

/ m

.N Scw.

Ecs Hoa As Mr SL D

T TCIN G

i 3

ia cr u

Ae P08 N

EITO E

N KLAICI TlR8 Tlw Tie Tt b

I/1 B

CPCGAS N pA /

Np Ntd Na Tm LR A

OPOEEE E pS 3 E pR Eoe Et Su SRo R

DALRRD RAF0 RAE RNF RS EH Nt E

L R

R R

R T

W V

U U

U U

A E

I P

C C

C C

L N

R

NRR LICENSING SV5 TEM

,PAGE NO: 2-30 SAN ONOFRE 2 8 3 LIC CURRENT STATUS REP 0RT REPORT AS OF 07/10/82 PLANT CHARACTER I5T I C S:

KEY PERS0NNEL:

DOCKET NO:

0361A0362 LIC. PM:

H. RCOD ASLB CHAIR:

J. KELLEY APPLICANT:

SOUTHERN CALIFORNIA EDISON LIC. BC:

F. MIRAGLIA MEM3ER 1:

C. HAND LOCATION:

S MI S OF SAN CLEMENTE, CA LIC. LA.:

J. LEE MEMBER 2:

E. JOHNSCH REGION:

S AE:

BECH CCUNSEL:

L.

CNANDLER CONST. INSP: D. KIRSCH REAC. TYPE: PWR NSSS: CCt1B ANTITRUST:

B. VOCLER RESID. INSP:

A. CHAFFEE.

DESIGN PWR 3410 MWT/1100 MWE CONST: BECH RM ANAL)ST:

M. ANDERSON CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER on geolooical and soismological matters was issued on 12/31/80.

ACRS subcommittcc mcoting was hcId 01/30/81, and ER DOCKETED:

03/01/77 03/23/77C full committee montings woro hold 02/5/81 and 03/12/81 ER SITE VISIT COMPLETE:

05/20/77 05/20/77C l

SER (Hen-TMI matters), was issued on 02/06/81.

SER INPUT TO DES TO PM:

10/01/77 12/01/80C supplement on TMI issues was issued on 02/25/81 SER ISSUE DES:

01/27/78 01/20/81C supplomont No. 2, 3, 4, 5, and 6 addressing open items were RESPONSE TO COMMENTS ON DES:

04/C6/8t C4/06/81C '

issued 05/08/81, 09/16/81, 01/22/82, 02/16/82, and 06/30/82.

ISSUE FES:

04/00/81 C4/29/81C A partial initial decision was rondered on 01/11/82 and an ASLB ini ti al deci sion was issued on 05/14/82.

A low power GL was issued on C 2/16 /82.

CURRENT ENV, STATUS:

DES addressing class 9 accidents was issued 0 ?-20-81 FES was issued 04-29-81.

SAFETY / HEARING MILESTCNES:

APPLICATION TENDERED:

11/29/76 11/29/76C SAR DOCKETED:

03/01/77 03/23/77C SAR Q'S RECEIVED BY PM:

08/15/77 09/29/77C SAR APPL. RESPONSE 10 Q'S RECEIVED: 11/18/77 12/08/77C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

02/10/78 08/11/78C Motions for summary disposition were granted by ASLB.

ISSUE DRAFT SER:

01/15/81 01/15/81C Hearing started 06/22/81 and crded 99/31/81.

A INPUT TO SER:

06/23/78 01/15/81C decision on loa power operation has issued on 01/11/82.

ISSUE SER:

08/01/80 02/06/81C An ASL3 initial decision on full powcr operation was issued on 05/14/E2.

ACRS LETTER RECEIVED:

03/17/81 03/17/81C INPUTS TO SE SUPPLEMENT 7:

07/16/82 ISSUE SE SUPPLEMENT 7:

07/30/82 FEi1A LETTER RECEIVED:

12/01/81 12/01/81C CURRENT ANTITRUST:

The Staff is reviewing tho CL' antitrust information.

HEARING STARTED:

--06/22/81 06/22/81C AStB INITIAL DECISION:

05/14/82 05/14/82C ASLB FINAL DECISION:

06/C0/82 TCCN SPECS COMPLETED:

102/16/82 02/16/82C COMMISSICN DECISION:

' 07/0:/82 ISSUE LIC. WITH PCuER RESTRICTION:.

LATEST'AMENCMENT:

ISSUE FULL POWER LICENSE AMEND: ~

08/09/82

-SCHED. DATE RECEIPT DATE

~

~'

NEW SLIPS / NOTES:

i CONSTRJCTION COMPLETION - APPL.:

02/16/82C l

"\\

w NQR LICENSING SVSTEN PAGE NO: 2-21 SEAER00K 1 &2 0L CURRENT STATUS REPQRT REPORT AS OF: 07/10/82 PLANT CHARACTERI5 TIC $8 KEY P E R S 0 N N E L:

DOCKET NO:

044310444 LIC. PM:

L. WHEELER ASLB CHAIR:

H. H0YT APPLICANT:

PUBLIC SERVICE OF NEW HAMPSHIRE LIC. DC:

F. MIRACLIA MEMBER 1:

E. LUEEKE LOCATICN 10 f11 S OF PORTSMOUTH, NH LIC. LA.:

J.

LEE MEM3ER 2:

D. PARIS REGION:

1 AE:

UEC COUNSEL:

R. LESSY-CONST. INSP:

A.

TOTH REAC. TYPEt PWR NSSS: UEST ANTITRUST:

A.

HODGDON RESID. INSP: A. CERNE DESIGN PWR: 3411 MWT/1198 MWE' CONST: UEC RM AMALYST:

B. ST MARY CU2 RENT SAF. STATUS:

INVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Ihc FSAR.acceptanco reviou was ecmpleted in Scotember 1931 The FSAR cas dochoted October 5, 1981 Applicant has ER DCCKETED:

10/05/ti..

10/05/81C responded to round 1 Q's.

SER isvaance has moved from ER SITE VISIT COMPLETE:

09/07/S2 to 11/08/82.

INPUT TO DES TO PM:

03/01/82 03/0!/82C f

ISSUE DES:

05/14/82 05/14/82C i

RESPONSE TO COMMENTS ON DES:

03/18/82 E'

ISSUE FES:

10/05/82 CURRENT ENV. STATUS:

EX was tender ed June 1981.

ER acceptance review was completed September 1931.

Tha ER was docketed LAFETf/ HEARING MILESTONES 8 October 5, 1981 DCS was issued May, 1932.

Ccmments are bainq evaluated.

APPLICATION TENDERED:

06/29/81 06/29/81C SAR DOCKETED:

10/05/81 10/05/81C SAR Q'S RECEIVED BY PM:

01/20/82 03/05/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/12/82 04/13/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

07/20/82 Notico for Opportunity for Hearing was published in ISSUE D2 AFT SER:

07/30/82 the Fedoral Register on October 19, 1981 First prehearing INPUT TO SER:

10/08/82 ccnferenco was hold May 6-7, 1982.

Second prehearing ISSUE SER:

11/03/82 conferenco is scheduled for July 15-16, 1982.

ACRS FULL COMMITTEE MEETING:

12/10/82 INPUTS TO SE SUPPLEMENT 1:

12/10/82 ISSUE SE SUPPLEMENT 1:

12/30/82 FEMA LETTER RECEIVED:

12/20/82 CURRENT ANTITRUST:

Status to be determined.

HEARING STARTED:

06/00/83 ASLB INITIAL DECISION:

04/00/84 ASLB FINAL DECISION:

05/00/84 TECH SPECS COMPLETED:

COM:11SSION DECISICH:

05/00/84 ISSUE LIC. WITH PCWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

05/03/84 44 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Applicant critical path construction progress is behind CONSTRUCTION COMPLETION - APPL.:

05/31/84 06/23/82 l

schedulo. Licensing schedule has boon expanded six months.

l l

I

NRR LICENSING SVSTEM PAGE NC: 2-22 SHOREHAM 0L CURRENT STATUS REPQRT REPORT AS OF 07/10/82 PLANT C H A R A C T E R I 5 T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

05000322 LIC. PM:

R. GILBERT ASLB CHAIR:

L. 3RENNER APPLICANT:

LONG ISLAND LIGHTING CO.

LIC. 3C:

A. SCHWENCER MEMLER 1:

P. MORRIS LOCATION:

BROOKHAVEN, NY (LI)

LIC. LA.:

E. HYLTON MEMBER 2:

J. CARPENTER REGION:

1 AE SIW COUNSEL:

B. BCRDENICK CONST. INSP L. NARRCO REAC. TYPE: BWR NSSS: GE ANTITRUST:

J. RUTBERG RESID. INSP:

J. HIGGENS DESIGN PWR: 2436 MWT/0849 MWE CONST: S&W RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTCNES:

SCHED. DATE ACTUAL DATE The ACRS mooting was held in October 1981 SER Supplement 2 was issued in March 1982.

An additional ER DOCKETED:

01/26/76 01/26/76C SSR Supplement i s scheduled for Sept. 1982 or earlier ER SITE JISIT COMPLETE:

08/06/76 0 8.'0 3/ 7 6 C to address resolution of outstanding matters.

INPUT TO DES TO PM:

11/22/76 11/29/76C ISSUE DES:

03/11/77 03/24/77C RESPONSE TO COMMENTS CN DES:

07/22/77 07/22/77C ISSUE FES:

10/21/77 10/18/77C CURRENT ENV. STATUS:

The enviroamental review is complete.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

09/00/75 09/04/75C SAR DOCKETED:

12/15/77 01/26/76C SAR o'S RECEIVED BY FM:

06/04/76 07/09/76C SAR APPL. RESPONSE 10 Q'S RECEIVED: 07/23/76 07/23/76C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

07/15/77 08/01/77C Hoarino sessions are scheduled for July 20-23, 1982, ISSUE DRAFT SER:

and July 27-30, 1982.

INPUT TO SER:

03/10/81 03/10/81C ISSUE SER:

04/10/81 04/10/81C ACRS LETTER RECEIVED:

09/18/88 10/19/81C INPUTS TO SE SUPPLEMENT 3 N/S ISSUE SE SUPPLEMENT 32 09/00/82 FEf1A LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Not required.

HEAR *NG STARTED:

05/04/82 05/04/82C ASLB INITIAL DECISION:

04/00/83 ASLB FINAL DECISION:

TECH SPECS CCitPLETED:

CC : MISSION DECISION:

03/00/83 ISSUE LIC. WITH POWER RESTRICTION: 03/00/83 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

FSAR Amendment 26 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

The current estimate for a partial initial ASLB decision CONSTRUCTION COMPLETION - APPL.:

09/20/82 04/30/82 on all matters except offsite emergency planning is tho end of Decembor, 1982.

A complete initial decision may not be available orier to March, 1953.

.~.

NRR LICEN$ING SYSVEM PAGE NO: 2-23 SOUTN TEXAS 182 0L CURRENT STATUS REP 0RT REPCRT AS OF: 07/10/82 i

PLANT CHARACTERISTICS KEY P E R S O N N E L:

DOCKET NO:

3498t0499 LIC. PM:

D. SELLS ASLB CHAIR:

C. BECHHOEFER APPLICANT:

HOUS.ON LIGHTING AND POWER COMPANY LIC. BC:

F. MIRAGLIA MEMBER 12 J.

LAM 3 LOCATION:

12 MI SSW OF BAY CITY, TEX LIC. LA.:

J. LEE MEMSER 2:

E. HILL REGION:

4 AE:

BECH COUNSEL:

J.

GUTIERREZ CONST. INSP:

REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP* W. HILL DESIGN PWR: 3300 MWT/1250 MWE CONST: EBASCO RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTCNES:

SCHED. DATE ACTUAL DATE Limited work being parformed due to higher priorities.

BRRT has been replaced by Bechtel as the A/E, BRRT ER DOCKETED:

07/17/78C has been replaced by Ebasco as the constructor.

ER SITE VISIT CCMPLETE:

09/26/78 09/26/78C Non safety related construction restarted on June 15, 1982.

INPUT TO DES TO PM:

03/01/83 i

Restart of safety related construction scheduled about July ISSUE DES:

04/01/83 15, 1982.

Current FLD is 12/86.

Changes in revised RESFONSE TO COMMENTS ON DES:

08/15/83 schedulo will be received in July 1982.

ISSUE FES:

09/02/83 CURRENT ENV. STATUS:

No activity scheduled pending revision of construction complation data by applicant in July '82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDEPED:

0S/10/78 05/10/78C SAR COCKETED:

07/l7/78C SAR Q'S RECEIVED BY PM:

01/22/79 02/08/82C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

12/01/82 As provided in a Commission Order of 9/22/80, an ISSUE DRAFT SER:

12/27/82 expeditnd hoaring on QA programs and manaqcmont was INPUT TO SER:

06/04/83 held.

The record of this phaso of tho hearing ISSUE SER:

07/01/83 was closed on Juno 17, 1982. Phase II of hearing will considor all aspects of Quadrex Report.

ACRS FULL COMMITTEE MEETING:

08/07/83 Phase II is expected to begin in lato '82 or early '83.

INPUTS TO SE SUPPLEMENT 12 08/14/83 ISSUE SE SUPPLEMENT 12 05/31/83 FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Memo and Order issued May 6.

1982 approving settlemonts and HEARING STARTED:

01/00/84 proposed license conditions and dismissing proceeding.

ASLB INITIAL DECISION:

06/03/84 ASLD FINAL DECISION:

TECH SPECS COMPLETED:

08/1S/83 COMMISSION DECISION:

11/08/06 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENCMENT:

ISSUE FULL PCWER LICENSE # MEND:

12/00/86 Amendmont 025 was issued 03/15/82.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Further slips and.-dditional staf f review will be CONSTRUCTION COMPLETION - APPL.:

82/00/86 03/00/82 required as a result of AE change.

PAGZ NO: 2-24 NRR LICEHSING SVSTEM 0L CURR ENT STATUS REPQRT REPORT AS OF: 07/10/82 ST LUCIE 2 PLANT CHARACT ERIST I C S:

K EY P E R S 0 N N E L:

LIC. PM:

V. NERSES ASLB CHAIR:

E. BOWERS LIC. BC:

F. MIRAGLIA MEMEER 1:

P. MORRIS DOCKET NO:

05000389 APPLICANT:

il0RIDA POWER & LIGHT LCCATION:

12 til SE OF FT. PIERCE, FLA LIC. LA.

J.

LEE T1 EMBER 2:

O. PARIS REGION:

2 AE:

ESASCO COUNSEL:

J.

THESSIN CONST. INSP:

R. WRIGHT REAC. TYPE: PWR NSSS: CCM3 ANTITRUST:

B.

V0GLER RESID. INSP: S.

ELROD DESIGN PWR: 2700 r1MT/0842 MWE CONST: EBASCO U1 ANALYST:

M.

ANDERSON ENVIRONMENTAL MILESTCHES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

Status of Q-1 and Q-2 revica is completo.

The SER was 02/17/81C issued on 10/09/81.

SE Supplement No. 1 was issued ER DOCKETED:

on 12/30/81.

SE Supplement No. 2 is scheduled to be ER SITE VISIT CCMPLETE:

02/18/81 02/18/81C INPUT TO DES TO PM:

08/07/81 08/07/81C 10/16/81 10/16/81C issued on 8/27/82.

ISSUE DES:

RESPONSE TO COMMENTS CN DES:

02/08/82 02/08/82C ISSUE FES:

04/23/82 04/23/82C CURRENT ENV. STATUS:

The DES was issuod on 10/16/81 and the FR Notice was published 10/30/81. The FES was issued on 04/23/82.

SAFETY / NEARING MILESTONES:

APPLICATION TENDERED:

03/31/80 03/31/80C 02/17/81C SAR DOCKETED:

SAR Q'S RECEIVED BY PM:

06/15/81 06/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED:

INPUT TO DRAFT SER TO PM:

08/03/81 08/03/81C 1

CURRENT NTG. STATUS:

ISSUE DRAFT SER:

08/10/81 08/10/51C There have been no petitioners on matters dealing with INPUT TO SER:

09/11/81 09/11/81C health, safoty and environment.

ISSUE SER:

10/09/81 10/09/81C ACRS FULL COMMITYEE F.EETING:

11/12/81 11/12/8tC INPUTS TO SE SUPPLEMENT 2:

07/30/82 l

ISSUE SE SUPPLEMENT 2 08/27/82 FEMA LETTER RECEIVED:

08/01/82 CURRENT ANTITRUST:

SottIcment mmong the Department of Justice, the NRC Staff NEARING STARTED:

N/A and the licensoo has born agreed upon.

Case dismissed ASLB INITIAL DECISIDH N/A 3/82 following summary disposition and settlement agreement.

ASLB FINAL DECISION:

N/A TECH SPECS COMPLETED:

09/30/82 CCit:1ISSION DECISION:

09/30/82 ISSUE LIC. WITH POWER RESTRICTION:

N/A ISSUE FULL POWER LICENSE AMEND:

10/31/82 LATEST AMENDMENT:

No.

'O (FSAR); No. 4 (ER)

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL..

10/28/82 12/31/81 Caseload Forecast Panel estimate for construction completion on Unit 2 is being reovaluated as a result of the June, 1982 site visit.

,NRR LICENSING SY$ TEM PAGE N0: 2-25 SUMMER 1 0L CURRENT STATUS REPORT REPORT AS OF 07/10/82 PLANT CHARACTERISTICS KEY PERS0NNEL' DOCKET NO:

05000395 LIC. PM:

W. KANE ASLB CHAIR:

H. GROSSMAN APPLICANT:

SOUTH CAROLINA ELECTRIC & GAS CD.

LIC. BC:

B. YCUNGBLOOD MEMBER 1:

G. LINENBERGER

. LOCATION:

26 MI NW OF COLUM3IA. SC LIC. LA.:

M. RUSHER 00K MEMBER 2 F. HOOPER REGION:

2 AE GIL COUNSEL:

S. COLDBERG CCNST. INSP:

REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP: J. SK0LDS DESIGH PWR: 278S MWT/0900 MWE CONST DANIEL RM ANALYST D. SCHWARZ CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER Supplement No. I was i ssued 04/28/81 Supplement No. 2 to thn SER was issued on 05/28/81. Supplcacnt No.

ER DOCKETED:

01/21/77 02/24/77C 3 was issued in January 1982.

Tho estimated dato for ER SITE VISIT COMPLETE:

06/30/78 06/07/78C.

issuanco of Supplement No. 4 is July 16, 1982.

Frojected INPUT TO DES'TO PM:

09/21/78 05/29/79C.

dato for issuance of a license with power rostriction ISSUE DES:

10/30/78 06/22/79C is July, 1982.

RESPONSE TO COMMENTS ON DES:

07/01/80 07/24/80C ISSUE FES:

05/15/81 05/21/81C CURRENT ENV. STATUS:

DES supplement on Class 9 accidents was issued in November 1980.

The FES was issued.in May, 1981.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

12/10/76 12/10/76C SAR DOCKETED:

01/21/77 02/24/77C SAR Q'S RECEIVED BY PM:

02/03/78 03/08/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 04/21/78 0 9/18/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

06/16/78 02/21/79C i

On 04/31/81 the AaLB by order granted the FUA intervention ISSUE DRAFT SER:

N/A j

on 10 contentions. The ASLAB on 06/01/81 reversed the ASLB INPUT TO SER:

06/02/80 12/15/30C 1

decision to ad. nit FUA as an intervonor. The contestod ISSUE SER:

08/01/80 02/06/81C-hearing began 06/81 and was completed in January 1982.

1 ASLB initial decision is estimated for 07/82, ACRS LETTER RECEIVEC:

03/18/81 03/18/81C INPUTS TO SE SUPPLEMENT 42 07/14/82 07/14/82C ISSUE SE SUPPLEMENT 4:-

07/16/82 I

FEMA LETTER RECEIVED:

11/13/81 ft/13/81C CURRENT ANTITRUSTt l

l The Attorney general sont his advice on significant HEARING STARTED:

06/22/81 06/22/81C chances to the Commission on 10/10/80.

The Commission ASLB INITIAL DECISION 07/C0/82 on 06/26/81 denied Central Electric Power Coop., Inc.

ASLB FINAL DECISION:

07/00/82 petition for antitrust review.

TECN SPECS COMPLETED:

07/00/82 COM:1ISSION DECISION:

08/00/82 ISSUE LIC. WITN PCMER RESTRICTION: 07/00/82 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

09/00/82 Humber 32.

SCHED. DATE RECEIPT DATE MEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

07/00/82

~

PAGE NO: 2-2G NRR L ICEN5ING SVSTEN SUSQUEHANNA 1 82 0L CURRENT STATUS REPQRT REPCRT AS OF: 07/10/82 KEY P E R S O N N E L:

PLANT C H A R A C T E R I $ T I C S:

LIC. PM:

R.

PERCN ASLB CHAIR:

J. GLEASON DOCKET NO:

038780388 LIC. BC:

A.

SCliUENCER MEMSER 1:

G. 3RIGHT LIC. LA.

E. HYLTON MEMGER 2:

P.

PURDCM APPLICANT:

PENNSYLVANIA POWER 8 LIGHT REGION:

1 AE:

BECN COUNSEL:

J.

CUTCNIN CON 3T. INSP:

L. HARR0;J LOCATION:

7 MI NE OF BERWICK, PA ANTITRUST:

A.

H0DCDON RESID. INSP:

G.

RNDADS REAC. TYPE: BWR HSSS: GE DESIGN PWR: 3440 MWT/1052 MWE CONST: BECN RM ANALYST:

L.

LANIER ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

SER was issued 04/06/81 SSER #1 was issued 07/07/81.

06/10/78C Post ACRS SSER #2 was issued 09/10/81. SSER #3 was ER DOCKETED:

issued 07/17/82. Full power Iicenso with a fuel load ER SITE VISIT COMPLETE:

10/20/78 10/20/78C 03/30/81 03/30/81C and low power testir.g restriction was issued on 07/17/82.

INPUT TO DES TO PM:

03/30/81 03/30/8tC ISSUE DES:

RESPONSE TO COMMENTS ON DES:

05/21/81 O S / 21/ 01 C C6/1S/81 07/02/01C ISSUE FES:

CURREET ENV. STATUS:

DES was issued on 03-30-81.

FES was issued 07-02-82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/05/78 04/10/78C 07/31/78 07/31/78C SAR DOCKETED:

11/17/78 CS/IS/79C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED: N/S INPUT TO DRAFT SER TO PM:

04/07/80 04/07/80C CURRENT HRG. STATUS:

The OL hearing is complete; Initial decision issued on ISSUE CRAFT SER:

ItiPU T TO SER:

03/23/81 03/23/81C 04/06/81 04/06/81C 04-12-82.

IS3UE SER:

08/15/81C ACRS LETTER RECEIVED:

l INPUTS TO SE SUPPLEMENT 3:

04/30/82 ISSUE SE SUPTLEMENT 3:

07/00/E2 C7/17/020 FEMA LETTER RECEIVED:

C6/0C/S2 l

10/06/81 10/06/81C CURRENT ANTI' RUST NEARING STARTED:

ASLB INITIAL DECISIDH:

04/12/82 04/12/82C ASLB FINAL DECISION:

TECH SPECS COMPLETED:

OS/30/82 C0" MISSION DECISION:

ISSUE LIC. WITH POWER RESTRICTION: 07/01/82 07/17/82C ISSUE FULL POWER LICENSE AMEND:

LATEST AMENEMENT:

FSAR:

No. 30; ER:

No. S SCFED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.

07/17/32C 05/11/82 l

m HRR L 2 C.E N S I R G SYSTEM PAGE NO: 2-27 WASHINGTON NUCLEAR 1 PCP C U R R.E N T STATUS REPQRT REPORT AS OF 07/10/82 i

PLANT C II A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

1 DOCKET NO:

05000460 LIC. PM:

UNASSIGNED ASLB CHAIR:

APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:

E. ANDERSON MEM3ER 1:

4 LOCATION:

30 MI NW OF RICHLAND, WASH LIC. LA.:

M. CUNCAN MEMBER 2:

REGION:

'5 AE:

UEC COUNSEL:

M. YOUNG CONST. INSP: P. NARBUT ~

REAC. TYPE: PWR NSSS: B&W ANTITRUST:

RESID. INSP: A.

TOTH DESIGN PWR 3760 MWT/1267 MWE CONST: BECH' Rf1 ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Application was tendered on 11-25-81.

This schedule is being reconsidered in light of a notice of deferral from ER DOCKETED:

07/00/82 07/16/82C the applicant. A review schedule will be established ER SITE VISIT CCMPLETE:

following construction resumption. Application was INPUT TO DES TO PM:

docketod on July 16,-1982.

ISSUE DES:

N/S RESPONSE TO COMMENTS ON DES:

ISSUE FES:

N/S I

CURRENT ENV. STATUS:

DES issuance will be scheduled following resumption of construction.

SAFETY / HEARING MILESTONES:

SAR DOCKETED:

07/00/82 07/16/32C APPLICATION TENDERED:

11/25/81 11/25/81C SAR O'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PMt Notice of Opportunity for Hearing is to be published ISSUE DRAFT SER:

in the Federal Register.

INPUT TO SER:

ISSUE SER:

N/S ACRS FULL COMMITTEE MEETING:

N/S INPUTS TO SE SUPPLEMENT 1

,~

ISSUE SE SUPPLEMENT 13 N/S FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

t HEARING STARTED:

N/S ASLB INITIAL DECISION:

N/S ASLB FINAL DECISION:

TECH SPECS COMPLETED:

C07. MIS.SION DECISION:

ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/00/85 SCHED. DATE. RECEIPT DATE NEW SLIPS / NOTES:

Construction delay of from 2 to 5 years was announced CONSTRUCTION CCMPLETION - APPL.:

12/00/85 G5/07/82 on 4/29/82.

I l

l lIlilIl ll l

G 2 E

2 8 T

/

E 0

T CCCCCC CCCC CCCC A

1122 D 2 1

A 771111 6899 2

/

D 778888 7777 8883 8

7

//////

//// / ///

T

/

O 0

L 040181 0276 2701 P

7 N

S A

213323 3202 1133 I

0 R

U / /////

//// / ///

E /

E F EELHL T

476792 2637 01S3 C 5 G O WLLTI C

000001 1000 11O0 E

0 R

A OOIOE A

P S BCHTF A

E E

T T

EREAR T

R A

771111 6899 1122 2222 23 3 A 3

O D 778388 7777 8888 8838 88 8 D 8 P

PP

/ /////

/ /// //// / ///

// /

/

SS 830181 01S1 2701 9461 00 0

0 E

R

NN D

213323 3001 1133 0200 30 0

D 0

R I:

A12II E / /////

/ /// //// / ///

AA

// /

E

/

H 276792 2415 0153 9980

//

88 9

H 9

H 1000 1100 0001 NN 00 0

C 0

C 000001 CRR S

EETD S

BBBSI LMMNS D

E N

SEECE AMMCR V

O I

I:

E TD L

C CN P

E IE P

S R

G RM A

R E

N' TA E

D S :

I1 S

M T

EE N

'Q C

P ET RS N

L KNN RR N

O CEONEE E

O S

M ENt RE I

N E

UWTOLI S

T E

PO O met T

LHLTGN E

E S

N D

T T

M D O: D: EC T

N UCYA0A N

L:

T O

E Y

EETE INENWI E

R ASHPVL O

PM N T

R BE R ELNV SOTOOL L

N T

PP E S

E S

E TPEI IIEIP P

S U

M E D DN S:

TP1!E

CSLS R

M M Q O RAEWBL E

C0 M L

N EO R

IUEC DEIPIHE O

E P L

7 O

I E VP TE MSLE EDCMCTW C

S I

T C

M T: IS FS:

M PR T

EOEIO M : IS DEE A

R OEP RLDCDWP N

T E

T DSE O G NECR RTE CSUR AA

.L I

O R

TS L

EID: T:

N OTE DFS:

SE TILSN S

R

.: SY A

TV S S I

IER E

A R

LO T

STACOCL T

V MCALUL T

E OEEE R

TK L

OROE 2TET INEIIU C

P PBLERA N

KETDSF A

ACSP TCTS h SE GNIPSLF U

CO P

fS L

NIFSS R

S S STN E

CT N

E I D 'Q A TETE TE I

IEE T

...NIA M

CITEOE H

U CCCUT N

DSUUPU

/

L UUUU SUUA RBBHMUU S

Y IIIDNf O

PSSS Y PRRR PSPS RPSM ALLCMSS N

1 G

T LLLCAR R

RRNSES T

PAAA NSNS CNSE ESSEOSS O

E I

EEIIRI E ASSS IIII AIIF HAATCII C

N A

V F

K N

A I

T E

S 5 S N

E T

C N I

E ts L

R su.

M ug R

E cue T

iA8 R U S

v 9

Y en1 R C S

H ri R

C r

N Y

8EE yde L

BCB geb L

P oum P

l se 0

UH : T ost S

SS SS ni p A: SN s e oS C

RWESO iob E,AHC S

s I

W OD

/oi T

PN yt A

g e S

CL E

oI t IH W

l a

I LC M

o

.d BI eo R

UR 3

GNt P

0 o

Rg E

F 1

1 NO 1

.Er T

O

/

2Sa 8

7TW T

8St C 9GN W

/

1 ng 3

3N M

1 A

0II 3in 0HM 3

/ i
2 2

R 0S R2 S3dt S1 S

5A0 W3 U

eo U

U R

A 0W3SB3 Tddo Td T

T A

Aeum Ae A

S T

E H

Tul Tu Td Ud N

S L

SscS Ss Se Re E

E C

C : :

ER snR s

r Tr M

T U

OT:

PW

.iiC

.i

.i Ii D

O N

NNN YP F

A V

Gu Tu N

N AO: T Ase Ns Rq Nq E

/

N T

TCIN N

Sab Ea He Ae M

S w

r r

A P

O EITO

.G w

T N

KLAICI T

I2 T

T T

I G

CPCGAS NRI8 NS Nt Nt T

L N

A OPOEEE EEi9 EE Eo Eo S

S I

DALRRD RSw1 RF RN RN E

H L

R R

R R

T W

S U

U U

U A

E A

P C

C C

C L

N W

(lIl'l'l ll,

NRR L7 CENSING SYSTEM PAGE NO: 2-29 WASHINGTON NUCLEAR 3 0L CURRENT STATUS REPQRT REPORT AS OF: 07/10/82 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

05003S08 LIC. PM:

. UNASSIGNED ASLB CHAIR:

R. LAZO APPLICANT:

UASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:

F. MIRAGLIA MEMBER 1:

E. LUEBKE LOCATION:

26 MI W OF OLYMPIA. WA LIC. LA.:

J. LEE MEMBER 2:

D. SCHINK REGION:

5 AE:

EBASCO COUNSEL:

D. SWANSON COMST. INSP D. KIRSCH REAC. TYPE: PWR NSSS: COMB ANTITRUST:

B. V0GLER RESID. INSP W. ALBERT DESIGN PWR: 3800 MWT/1242 MWE CONST: EBASCO RM ANALYST:

L. LANIER 1

l l

I CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE J

Application was tendered on June 2, 1982, and is estimated to be docket:d on 08/82.

ER DOCKETED:

08/00/82 ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

05/00/83 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

10/00/83 CUARENT ENV. STATUS:

l Apnlication was tendered on June 2, 1982, and is estimated to be docketed on 08/82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/02/82 06/02/82C SAR DOCKETED:

08/00/82 SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

Notice of Opportunity for Hoaring is to bo published ISSUE DRAFT SER:

in the Fodoral Register.

It:PUT TO SER:

ISSUE SER:

04/00/84 ACRS FULL COMMITTEE MEETING:

05/00/84 INPUTS TO SE SUPPLEMENT 1:

ISSUE SE SUPPLEMENT i:

06/00/84 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

HEARING STARTED:

10/03/84 ASLB INITIAL DECISION:

05/00/85 ASLB FINAL DECISION:

TECH SPECS COMPLETED:

CCNMISSION DECISION:

06/00/85 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

06/00/85 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Tenativo milestono schedule assumes favorable results CONSTRUCTION COMPLETION - APPL.:

06/00/85 05/07/82 of acceptance review (to be completed August, 1982).

Schedule will be completed after docketing and manaqcmont noorovat.

NRR LZCENSING SYSTEM PAGE NO: 2-30 WATERFORD 3 0L CURRENT STATUS REP 0RT REPORT AS OF: 07/10/82 PLANT CHARACTERI$TICSt KEY P E R S O N N E L:

DOCKET NO:

05000382 LIC, PM:

S. BLACK ASLB CHAIR:

S. WOLFE APPLICANT:

LOUISIANA POWER A LIGHT LIC. BC:

F. MIRAGLIA MEMBER 18

u. JORDAN LOCATION:

20 MI W OF NEW ORLEANS. LA LIC. LA.:

J. LEE MEMBER 2:

H. FOREMAN REGION:

4 AE:

EBASCO COUNSEL:

S. TURK CONST. INSP:. UNASSIGNED REAC. TYPE: PWR NSSS: COMB ANTITRUST:

B. V0GLER RESID. INSP: L. CONSTABLE DESIGN PWR: 3560 MWT/1151 MWE CONST: EBASCO RM ANALYST:

M. KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE-The safety review was expedited. The SER was issued July 9, 1981 Fuel load date delayed until 01/83 by ER DOCKETED:

12/00/78 12/00/78C applicant from 10/82.

ER SITE VISIT COMPLETE:

12/05/30 12/05/80C INPUT TO DES TO PM:

04/06/81 04/06/81C ISSUE DES:

05/01/81 05/01/81C RESPONSE TO COMMENTS ON DES:

07/24/81 08/19/81C i

ISSUE FES:

09/30/81 09/30/81C CURRENT ENV. STATUS:

The DES was completed on May 1981.

FES was completed September 1981.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

09/28/78 09/28/78C SAR DOCKETED:

12/18/78C SAR Q*3 RECEIVED BY PM:

N/S SAR APPL. RESPONSE TO Q'S RECEIVED: 08/08/80 12/15/80C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/03/80 05/15/81C Contested hearing started 03/82. Discovery amono the ISSUE DRAFT SER:

parties has been held.

Hearing record closed 5/12/82.

INPUT TO SER:

05/08/81 05/15/81C ISSUE SER:

07/09/81 07/09/81C ACRS LETTER RECEIVED:

08/08/81 08/08/81C INPUTS TO SE SUPPLEMENT 4:

07/23/82 ISSUE SE SUPPLEMENT 4:

07/30/82 FEMA LETTER RECEIVED:

11/30/82 CURRENT ANTITRUST:

Staff is reviewing OL Antitrust information.

HEARING STARTED:

03/00/82 03/23/82C ASLB INITIAL DECISION:

09/00/82 ASLB FINAL DECISION:

10/00/82 TECH SPECS. COMPLETED:

12/30/82 COMMISSION, DECISION:

12/30/82 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

ER 03 - 8/81 FSAR 027 - 4/82 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

To date State of Louisiana does not have an approved CONSTRUCTION COMPLETION - APPL.:

01/16/83 04/12/82 emergency plan.

__~._______m.

NRR LZCEN5ING

$YSTEM PAGE NO: 2-31 WATTS BAR 1 8'2 0L CURRENT STATUS REPORT REPORT AS OF 07/10/82 PLANT CHARACTERI5TICSt KEY PERS0NNEL DOCKET NO:

0390ID391 LIC. PM:

T. KENYON ASLB CHAIR: N/A APPLICANT:

TENNESSEE VALLEY AUTHORITY LIC. BC:

E. ADENSAM-MEMBER 1:

N/A LOCATION:

10 MI S OF SPRING CITY, TENN LIC. LA.:

M. DUNCAN MEtiEER 28 N/A REGION:

2 AE:

TVA COUNSEL:

M. YOUNG CCNST. INSP R. CRLENJAK 1

REAC. TYPE: PWR HS$$: WEST ANTITRUST:

J. RUTEERG

'RESID. INSP T. HEATHERLY DESIGN PWR 3411 MWT/1165 MWE CONST: TVA PM ANALYST:

M. KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CFP predicted earliest Unit 1 completion dato at 08/83.

SER published 6/82.

ACRS meeting scheduled for 8/82.

ER DOCKETED:

01/05/77 11/23/76C ER SITE VISIT COMPLETE:

03/18/77 02/25/77C INPUT TO DES TO Ptt 07/06/77 08/18/77C ISSUE DES:

11/29/77 06/02/78C RESPONSE TO COMMENTS UN DES:

N/A ISSUE FES:

11/24/78 12/29/78C l

CURRENT ENV. STATUS:

Complete except for environmental toch specs.

APPLICATION TENDERED:

06/30/76 06/30/76C SAR DOCKETED:

10/04/76 10/04/76C SAR Q'S RECEIVED DY PMs 12/15/76 05/20/77C SAR APPL RESPCHSE TO Q'S RECEIVED: 03/23/77 02/10/78C CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

06/18/80 12/18/81C No hearings are assumed.

ISSUE CRAFT SER:

12/30/3s 12/30/81C INPUT TO SER:

06/04/82 06/04/82C ISSUE SER:

07/01/82 07/01/82C ACRS FULL CCMMITTEE MEETING:

08/12/82 INPUTS TO SE SUPPLEMENT 1:

08/27/82 ISSUE SE SUPPLEMENT 18 09/10/82 CURRENT ANTITRUST Complete NEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A ASLB FINAL DECISICN N/A TECH SPECS C0i;PLETED:

11/00/C2 COM!ISSION DECISIGH:

07/00/83' ISSUE LIC. 1,!ITH P0t1ER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL P0WER LICENSE AM;ND:

08/03/83 FSAR Ho. 46 I

NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

08/00/83 04/09/82 4

i

NRR L ICENSIMG SYSTEM PAGE W3: 2-32 WOLF CREEK 1 0L CURRENT ST A TUS REPQRT REPORT AS CF: 07/10/02 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

05000482 LIC. PM:

J. HOPKINS ASLB CHAIR:

J. GLEASCN APPLICANT:

KANSAS GAS 8 ELECTRIC LIC. BC:

B. YOUNG 3LOOD MEM3ER 1 G. ANDERSCN LOCATION:

3.5 MI NE OF BURLINGTON, KAN LIC. LA.

M.

RUSHLPOOK MEM2ER 2:

H. PAXTON REGION:

4 AE:

BECH COUNSEL:

M. KARMtN CONST. INSP:

REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. VCGLER RESID. INSP: T. VANDEL DESIGN PMR2 3425 MWT/1150 MWE CONST: DANIEL RM ANALYST:

D.

S Cl!M

  • RZ CURRENT SAF. STATUS:

EN'11RONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The SER was issued in April 1982.

SSER-1 is expected to bo issued on August 30, 1932.

ER DCCKETED:

11/25/33 11/25/30 C ER SITE VISIT COMPLETE:

G7/23/31 04/21/ SIC INPUT TO DES TO FM:

10/01/81 10/01/31C ISSUE DES:

ct/05/S2 01/05/02C RESPCNSE TO COMMENTS ON DES:

05/14/32 05/14/s2C ISSUE FES:

06/11/32 06/11/02C CURRENT ENV. STATUS:

The DES was issued in January 1982.

The FES was issued in Juno 1932.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

02/21/30 02/21/80C SAR D3CKETED:

0G/07/80 OS/07/30C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

03/12/32 03/12/82C Notice of Opportunity for Hoaring was published in the ISSUE DRAFT SER:

Federal Registor on 12/18/80.

Two petitions for INFUT TO SER:

03/17/32 03/19/E2C 1 cave to interveno were filed. A special combined ISSUE SER:

C4/07/02 04/07/32C prehearing conference was hold on 4/15/31 ACRS LETTER RECEIVED:

05/11/32 05/11/82C INPUTS TO SE SUPPLEMENT 1:

00/10/32 ISSUE SE SUPPLEMENT 1:

03/30/02 FEMA LETTER RECEIVED:

07/30/82 CURRENT ANTITRUST:

OL antitrust review is in progress.

HEARING STARTED:

10/00/32 ASL3 INITIAL DECISION:

03/00/33 ASLB FINAL DECISICN:

04/JC/33 TECH SPECS COMPLETED:

N/S COMMISSION DECISION:

11/ 00/a 3 ISSUE LIC. WITH PCNER RESTRICTICH: N/S LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/00/83 SNUPPS FSAR - No. 9; Wolf Creek Site Addendum - No. 8; ER - No. 3.

SCHED. DATE RECEIPT DATE 1

NEW SLIPS / NOTES:

Casoload Forecast Panel estimates construction CCNSTRUCTION COMPLETION - APPL.4 12/00/33 03/00/82 completion on 6/34.

N !! R LICENSING SYSTEM PAGE NO: 2-33 ZIMMER 1 0L CURRENT STATUS REPQRT REPORT AS CF: 07/10/82 PLANT CHARACTERI$TICSt KEY P E R S 0 N N E L:

DOCKET NO:

05000358 LIC. PM:

G.

EDIS2N ASL3 CilAIR:

J. FRYE APPLICANT:

CINCINNATI GAS 8 ELECTRIC LIC. EC:

B. YCUMG3LOOD f1Ef1D ER 1:

F. N00PER LOCATION:

24 f1I SE OF CINCINNATI, ON LIC.

LA.-

M. RUSNCROOK MLM*lER 2:

II. LIVINCSTON REGION:

3 AE:

SSL COUNSEL:

C. DARTil CCNST. INSP: D. HUNTER REAC. TYPE: BUR NSSS: GE ANTITRUST:

S. LENIS

-RESID. INSP:

F. CHRISTIANSCN DESIGN PWR: 2436 MWT/0810 MWE CONST: KAISER RM ANALYST:

M. ANDERSCN CURRENT SAF. STATUS:

ENVIRONt1 ENTAL MILESTONES:

SCHED. DATE ACTUALDb SE Supplement was issued on 06/04/81 SE Supplenont 2 was issued 10/8 1 SE Supplement 03 is scheduled to be issued ER DOCKETED:

09/10/75 09/10/75C-03/15/82.

E2 SITE VISIT CCMPLETE:

10/01/75 10/09/75C INPUT TO DES TO PM:

C3/20/76 03/19/76C ISSUE DES:

10/15/76 10/15/76C RESPONSE TO COMMENTS ON DES:

03/25/77 C4/01/77C ISSUE FES:

06/1J/77 06/10/77C CURRENT ENV. STATUS:

Corploto SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

03/15/75 OS/09/75C SAR D3CXETED:

09/15/73 09/10/75C SAR C'S RECEIVED BY PM:

1C/29/76 01/06/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/31/76 07/29/77C CURRENT HRG. STATUS:

' INPUT TO CRAFT SER TO PM:

01/20/77 CS/11/77C Hearing was completed March 5, 1932.

Board decision was ISSUE DRAFT SER:

N/A rendered in Juno, 1932.

Hcarino is to be extended.

A INPUT TO SER:

05/20/77 12/07/77C new schedule has not yet bcon set.

Hearings could ISSUE SER:

07/29/77 01/31/790 become the critical path in the licensing schedule.

.ACRS LETTER RECEIVED:

09/16/77 03/13/79C INPUTS TO SE SUPPLEMENT 3:

00/02/32 ISSUE SE SUPPLEMENT 3:

05/15/02

~

FC1A LETTER RECEIVED:

04/15/02 04/15/87C CURRENT ANTITRUST:

Antitrust review is new closed. Federal Register Notico HORING STARTED:

02/26/02 02/26/S2C was published C4/39/82.

ASL': TNITIAL DECISICH:

05/21/02 C6/21/02C ASL3 FINAL DECISION:

07/0J/32 TECil SPECS COMPLETEb:

07/29/02 CCM:iISSION DECISICH:

11/00/52 ISSUE LIC. WITH POU:2 RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL PCMER LICENSE A:1END:

12/00/82 u

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Anplicant has slipped construction completion to 12/82.

CONSTRUCTION COMPLETION - APPL.6 12/03/02 04/19/02 Theraf ore, Zirr.nor is no Ioncor an fenpacted plant.

PAGE NO: 2-34 NRR L ICENSING SYSTEM ALLENS CREEK 1 CP CURRENT 5TA T US REP 0R T REPORT AS OF: 07/10/82 P L ANT CHARA CT ERIST I C S:

KEY PERS0MN E L:

LIC. PM:

C. PCON Asis CHAIR:

S. WOLFE LIC. DC:

E.

ADENSAM MEMLER 1:

E. CHEATUM CCCKET NO:

05300466 API't ! C AN T :

H3U37CN LICHTING AND POWER COPPANY LOCATICI:

45.1I U OF HOUSTCN, TX LIC. LA.

M.

DUNCAN MEMEER 2:

G. LINEN 3ERGER REGIOM:

4 AE:

E0ASCO COUNSEL:

R.

LLACK CCNST. IMSP:

REAC. TYPE: EUR MSSS: GE ANTITRUST:

A.

HODGDON RESID. INSP:

DESIGN PWR: 375G MWT/1150 MNE CONST: E2ASCO RM ANALYST:

B.

ST MARY ENVIP.ONMENTAL MILESTOSES:

SCHED. DATE ACTUAL DATE l CURRENT SAF. STATUS:

SSER3 on TMI i ssues, was i ssued August 6.

ER DOCKETED:

12/07/73 12/07/73C Tha ACRS does not plan to review TMI issues for A11cus Creek.

SSER4 on non-TMI issues including ER SITE VISIT CCMPLETE:

C3/00/74 03/08/74C cacrooncy pl.'oni.1c, financial capability; unresolved safety INPUT TO DES TO PM:

06/07/74 06/07/74C issuo; containment, ul tiriate hea t sink, and fuci deuicns ISSUE EES:

07/05/74 07/05/74C RESPONSE TO CCP.MENTS ON DES:

09/23/74 10/01/74C was issued Octcber 30, 1931 ISSUE FES:

11/?8/74 11/18/74C CURRENT ENV. STATUS:

A draft second FES surpl-ment was issued im December, 1900.

The final second supple nent was issued flarch 13, 1S01.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

08/24/73 08/24/73C StR DCCKETED:

12/07/73 12/07/73C SAR Q'S RECEIVED BY PM:

03/22/74 03/22/74C SAR APPL. RESPONSE TO Q'S RECEIVED: 06/03/74 07/03/74C INPUT TO DRAFT SER TO PM:

08/C9/74 09/20/74C CURRENT HRG. STATUS:

Env. hearing cermenced 01/12/81 and was ccmplated on ISSUE PRAFT SER:

05/15/81 Safety sessions uere held May 18-22 and Juno INPUT TO SER:

10/11/74 11/01/74C 1-12.

Further :cssiens were hold on 10/!i-9/S t,

ISSUE SER:

11/07/79 11/15/74C 10/26-30/31, 11/*6-20/31, 12/7-11/81, 12'14-16/81 and ACKS LETTER RECEIVED:

12/20/74 12/13/74C 09/12-14/32.

INPUTS TO SE SUPPLEMENT 4:

01/10/75 03/28/75C l

ISSUE SE SUPPLEMENT 4:

10/1S/81 10/30/81C A set o f proposed licenso condi tions has born submitted HEA7ING STARTED:

03/11/75 03/11/75C CURRENT ANTITRUST:

to the Licensing Board in the South Texas antitrust ASL3 INITIAL DECISION:

11/00/32 proceeding.

If the South Texas Ecard approves the ASL3 FINAL DECISION:

canditions, tacy uill be attached to the Allons Crcok TECH SPECS CCM?LETED:

CDZtISSION DECISION:

11/00/82 licenso.

CP ISSUED:

11/00/82 i

l

) LATEST AMENDMENT:

l NEW SLIFS/ NOTES:

NRR LICENSING SYSTEM PAGE NO: 2-33 CLINCH RIVER CP CURREHT STATUS REP 0RT REPORT AS OF: 07/tC/82 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

COCKET NO:

05000357 LIC. PM:

STARK LEECH ASL3 CHAIR:

M. MILLER

/.P P L I C A N T :

PROJECT ftAMAGEf1EMT CORP., D3E;TVA LIC. EC:

C.

THCitAS ME!OER 1:

G.

LINEhBERGER LOCATIGN:

25 f!I il 0F KNOXVILLE, TN LIC. LA.:

P. SHUTTLEWORTH ME!!3ER 2:

C. HAND REGION:

2 AE:

B:R CO L'N S E L :

S.

TRE3Y CONST. INSP:

REAC. TYPE: LitFOR tlSSS: REST ANTITRUST:

J. RUIDERG RESID. INSP:

DESIGN FWC: 0975 MUT/03SC t'.NE CONST S&M RM ANALYST:

D. ST T1ARY CURRENT SAF. STATUS:

ENVIRCN:1 ENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Scfety review was reinitiated in October 1931.

A revision to the Sito Suitability Report was issued Juno 11, 1932.

ER COCKETED:

04/11/75 04/11/75C ER SITE VISIT COMPLETE:

INPUT TO CES TO Pf1:

ISSUE DES:

02/12/76C RESIGNSE TO COMMENTS ON DES:

ISSUE FES:

02/07/77 02/07/77C 2

CURRENT ENV. STATUS:

Tho FES uns incued in Febremry 1977.

A document updating the FES was issued on July 19, 1902.

SAFETY / NEARING MILESTONES:

4 APPLICATION TENDERED:

10/15/74 10/15/74C SAR DGCKETED:

06/13/75 06/t3/75C SAR C'S RECEIVED BY PM:

04/09/32 04/09/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/15/82 05/15/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

07/16/82 07/16/82C The ASLB held a prehearing conference on 2/9-10/82, and ISSUE CRAFT SER:

08/27/82 on April 6-7, 1982.

INPUT TO SER:

01/14/83 ISSUE SER:

03/04/33 ACRS FULL COMMITTEE MEETING:

05/06/33 INPUTS TO SE SUPPLEMENT 1:

06/10/83 ISSUE SE SUPPLEMENT 1:

07/01/83 CUP. RENT ANTITRUST:

HEARING STARTED:

03/24/82 ASLB INITIAL DECISION:

05/01/84 ASLB FINAL DECISION:

TECH SPECS COT:PLETED:

COMMISSION DECISION:

06/01/84 CP ISSUED:

06/01/84 LATEST AMENDMENT:

NEW SLIPS / NOTES:

NRR L ICENSING

$YSTEM PAGE NO: 2-36 PEBBLE SPRINGS 1 &2 CP CURRENT STATUS REPORT REPORT AS OF: 07/10/82 PLANT C H A R A C T E R I S T I C 5:

KEY P E R S O N N E L:

LIC. PM:

D. SCALETTI ASLB CHAIR:

I. SMITH DOCKET NO:

051430515 APPLICANT:

PORTLAND GENERAL ELECTRIC LIC. BC:

E.

ADENSAM MEM3ER 1:

O.

PARIS LOCATION:

3 MI NW OF ARLINGTON, ORE LIC. LA.

M.

DUNCAN MEMBER 2:

W.

JORDAN REGIDH:

5 AE:

BECH COUNSEL:

3. LORDENICK CONST. INSP:

REAC. TYPE: PWR NSSS: B3W ANTITRUST:

B.

V0GLER RESID. INSP:

DESIGN PWR: 3760 MWT/1260 MWE CONST: BECH RM ANALYST:

L.

LANIER ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

Amendment 13 to the PSAR in response to 10CFR50.34(f)

(CP/ML rule) was filed 1/29/82.

The staff's review of ER DOCKETED:

08/06/74 08/06/74C the TMI-2 issues is presently in a hold status awaiting ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

10/11/74 12/11/74C a decision by PGE whether or not to continue their 11/15/74 01/ 06/ 7 5 C application at a different site (see Environmental Status).

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

03/07/75 03/22/75C A decision is expected within 2 months.

ISSUE FES:

04/07/75 04/16/75C l

l CURRENT ENV. STATUS:

l On 4/9/82, PGE withdrew their application, before the Oregon Energy facility siting council, for the Pebble SAFETY / HEARING MILESTONES:

Springs site.

The alternative sites hearing bofore the APPLICATION TENDERED:

06/07/74 06/07/74C ASLB scheduled for 4/20/82 was cancelled.

SAR DDCKETED:

10/18/74 10/18/74 C SAR Q'S RECEIVED BY PM:

12/13/74 Ot/13/75C SAR APPL. RESPONSE TO Q'S RECEIVED: 02/14/75 02/04/75C IhPUT TO DRAFT SER TO PM:

04/11/75 05/23/75C CURRENT MRG. STATUS:

A prehearing conference on alternative sites was held ISSUE DRAFT SER:

INPUT TO SER:

09/01/75 12/08/75C on December 1,

1981 ISSUE SER:

01/05/76 01/12/76C ACRS LETTER RECEIVED:

11/12/76 02/12/76C INPUTS TO SE St1PPLEMENT 6:

09/09/76 12/14/77C ISSUE SE SUPPLEMENT 6:

N/S l

CURRENT ANTITRUST:

HEARING STARTED:

Antitrust review is complete.

ASLB INITIAL DECISICN:

N/S 1

ASLB FINAL DECISION:

l TECH SPECS CCMPLETED:

COMMISSICH DECISION:

N/S CP ISSU D:

N/S LATEST AMENDMENT:

Amendment 13 to the PSAR in response to 10CFR50.34(f).

NEW SLIPS / NOTES:

. ~.

~.

NRR L'Y C E N 5 I N G SVSTEM PAGE NO: 2 !

SKAGIT/HANFORD 112 CP CURRENT STATUS REPORT REPORT AS OF: 07/10/02 PLANT CHARACTERI5TICSt KEY PERS0NNEL:

DOCKET N03-0T2280523 LIC PM:

C. MOON ASLB CHAIR:

J. WOLF APPLICANT:

PUGET SOUND POWER 1 LIGHT LIC, BC:

E. ADENSAM MET 10ER 1:

F. HOOPER i

LOCATION:

30 MI. NW OF RICHLAND, WA.

LIC. LA.:

M. DUNCAN MEM3ER 2:.

G. LINEMEERGER-REGION:.

5 AE EECH COUNSEL:

R. BLACK COMST. INSP:

REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. VCGLER RESID. INSP:

DESIGN PWR 3833 MWT/1277 MWE CONST: BECH RM ANALYST:

D. SCHNARZ l

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Supplement No. 2 to the SER was issued 10/81 on TMI-related action items.

Sito relocation ER amendment and PSAR ER DOCKETED:

09/30/74 09/30/74C i

amendment were submitted on 12/31/81 The applicant is ER SITE VISIT COMPLETE:

02/05/82 02/05/82C relocating the site to the Hanford Reservation.

INPUT TO DES TO PM:

04/09/82 04/09/82C j

Supplcracnt No. 3 to the SER i s expected to bo issued in

. ISSUE DES:

05/04/82 05/04/82C 9/82.

On 7/16/82, the staf f requested addi tional RESPONSE TO COMMENTS ON DES:

00/06/82 geological field date.

This data will requiro an ISSUE FES:

04/03/83 addit. Supplement to SER to be issued 10/82 or latorm i

CURRENT ENV. STATUS:

1 Sito relocation (to Hanford) DES was issue 1 on l

May 4, 1982.

The FES is expected to be issued 04/83.

SAFETY / HEARING MILESTONES:

j f

APPLICATION TENDERED:

08/06/74 08/06/74C SAR DOCKETED:

01/15/75 01/15/75C i

SAR Q'S RECEIVED BY PM:

02/10/22 01.10/*2C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/13/82 03/18/82C I

CURRENT HRG. STATUS:

. INPUT TO DRAFT SER TO PM:

A special prehearing conference was held on May 5, 1982.

ISSUE DRAFT SER:

Hearings are expected to continue in June 1932.

INPUT 10 SER:

07/11/77 07/11/77C

-l ISSUE SER:

08/31/77-08/31/77C

)

ACRS FULL COMMITTEE MEETING:

07/03/82 INPUTS TO SE SUPPLEMENT 3:

08/20/82 ISSUE SE SUPPLEMENT 3:

09/03/82 CURRENT ANTITRUST:

Completo HEARING STARTED:

07/15/75 07/15/75C ASLB INITIAL DECISION:

04/00/83 ASLB FINAL DECISION:

N/S TECH SPECS COMPLETED:

N/A COMMISSION EECISICH:

07/00/83 Cr ISSUED:

07/00/83 LATEST AMENDMENT:

HEW SLIPS / NOTES:

i l

l

NRR L ICEN$ ING SYSTEM PAGE NO: 2-38 (DOP)BOPSSAR/BSAR-205 PDA CURRENT STATUS REPORT REPORT AS OF 07/10/C2 PLANT CNARACTERIST I C S:

KEY P E R S O N N E L:

DOCKET NO:

05003560 LIC PM:

. UNASSIGNED ASLB CHAIR:

APPLICANT:

FLUCR POWER SERVICES LIC. BC:

J. MILLER MEMBER 1:

LUCATION:

N/A LIC. LA.:

P.

ANDERSON MEMSER 2:

REGION:

1 AE:

FLUOR COUNSEL:

N/A CONST. INSP:

REAC. TYPE: DOP HSSS:

ANTITRUST:

RESID. INSP:

DESIGN PWR: 0000 MNT/0000 MWE CONST:

RM ANALYST:

D. SCNWARZ CURRENT SAF. STATUS:

ENVIRCNMENTAL MILESTONES:

SCNED. DATE ACTUAL DATE Review in abeyanco pending the future of standardization.

ER DOCKETED:

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO C0".MENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/31/77 10/31/77C SAR DGCKETED:

10/31/77 10/31/77C SAR Q'S RECEIVED BY PM:

04/14/78 06/20/78C SAR APPL. RESPCNSE TO Q'S RECEIVED: 06/02/78 07/31/78C CURRENT NRG. STATUS:

INPUT TO CRAFT SER TO PM:

05/25/78 07/07/78C ISSUE DRAFT SER:

INPUT TO SER:

08/21/78 10/17/78C ISSUE SER:

10/02/78 12/29/78C ACRS LETTER RECEIVED:

11/17/78 02/16/79C INPUTS TO SE SUPPLEMENT 1:

12/08/78 03/21/79C ISSUE SE SUPPLEMENT 1:

N/S CURRENT ANTITRUST:

HEARING STARTED:

ASLB INITIAL DECISION:

COMt1ISSION DECISION:

SPECIAL PROJECT COMPLETE:

N/S LATEST AMENDMENT:

NEW SLIPS / MOTES:

l l

.-_,--._ - _ _ _ _ _ _ _. _..,._- m m._

_... -.--__ ~._ _ --_.__--..___.

l NRR L2CEN5ING SYSTEM PAGE NO 2-39 (BOP)ESSAR/DSAR-20S PDA CURR NT 5TATUS REPQRT REPORT AS OF 07/10/82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:

i DOCKET NO:

00002591 LIC. PM:

. UNASSIGNED ASLR CHAIR:

i APPLICANT:

EBASCO SERVICES LIC. BC:

J. MILLER MEMBER 1:-

LOCATIDH:

N/A LIC. LA.:

P. ANDERSON MEMBER 2:

REGIDH 0

AE EBASCO COUNSEL:

. UNASSIGNED CONST. INSP i

REAC. TYPE: BOP PSSS:

ANTITRUST:

RESID. INSP:

DESIGN PWR: 0000 MWT/0000 MWE LONST:

RM ANALYST M. KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ' ACTUAL DATE Review in aboyance pending the future of standardization.

't 2

and resources to conduct review.

ER DOCKETED:

ER SITE VISIT COMPLETE:

i i

INPUT-TO DES TO PM:

j ISSUE DES:

{

RESPONSE TO COMMENTS ON DES:

1 ISSUE FES:

I 1

4 CURRENT ENV. STATUS:

I I

1 SAFETY / NEARING MILESTONES:

I i

i APPLICATION TENDERED:

11/23/77 11/23/77C SAR DOCKETED:

'02/02/78 02/02/78C SAR Q'S RECEIVED BY PM:

N/S j

SAR APPL. RESPCNSE TO Q'S RECEIVED: N/S l

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S i,

ISSUE DRAFT SER:

INPUT TO SER:

N/S ISSUE SER:

N/S ACRS FULL CCMMITTEE MEETING:

N/S INPUTS TO SE SUPPLEMENT 1:

N/S

{

ISSUE SE SUPPLEMENT 1:

N/S CURRENT ANTITRUST:

I NEARING STARTED:

ASLB INITIAL DECISION:

i COM:11SSION DECISION:

SPECIAL PROJECT COMPLETE:

. N/S i

2 LATEST AMENDMENT:

l NEW SLIPS /FOTES:

a 1

1

_#m,

~ '

r-

--- -i-,- - - -.

s-, -,.

NRR L2CEN52NG SY$ TEM PAGE NO: 2-40 (BOP)ESSAR/CESSAR-80 PDA CURRENT STATUS REPQRT REPORT AS OF: 07/10/S2 PLANT CHARACTERISTICS:

KEY P E R S O N N E L:

DOCKET NO:

05000591 LIC. PM:

. UNASSIGNED ASLB CHAIR:

APPLICANT:

EBASCO SERVICES LIC. BC:

J. MILLER MEMOE2 1:

LOCATION:

N/A LIC. LA.:

P. ANDERSON MEMBER 2:

REGION:

0 AE EBASCO COUNSEL:

. UNASSIGNED CONST. INSP:

REAC. TYPE: BOP NSSS:

ANTITRUST:

RESID. INSP:

DESIGN PWR: 3800 MWT/0000 MW2 CONST:

RM AtlALYST:

M. KING CURRENT SAF. STATUS:

ENVIRCNMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization, and resources to conduct review.

ER DOCKETED:

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENLERED:

11/23/77 11/23/77C SAR DOCKETED:

02/02/73 C2/02/78C SAR Q'S RECEIVED BY PM:

N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S ISSUE CRAFT SER:

INPUT TO SER:

N/S ISSUE SER:

N/S ACRS FULL COMMITTEE MEETINC:

N/S INPUTS TO SE SUPPLEMENT 1:

N/S ISSUE SE SUPPLEMENT 1:

N/S CURRENT ANTITRUST:

HEARING STARTED:

ASLB INITIAL DECISION:

CC"J1ISSION DECISION:

SPECIAL PROJECT COMPLETE:

N/S LATEST AMENDMENT:

HEW SLIPS / NOTES:

m

.m__.

__._ - -~. _ _..

NRR LICEN5ING' SYSVEM PAGE NO: 2-41 (BOP)ESSAR/RESAR-414 PDA CURRENT STATUS REP 0RT REPORT AS CF 07/10/82 PLANT C H A R A C T E R I S T I C 5:

KEY P E R S O N N E L:

DOCKET NO:

00007S91 LIC. PM:

UNASSIGNED ASLB CHAIR:

4 APPLICANT:

EBASCO SERVICES LIC. BC:

J. MILLER MEMBER 1:

LOCATION:

N/A LIC. LA.:

P. ANDERSON-MEMBER 2:

REGION:

0 AE2 EBASCO COUNSEL:

UNASSIGNED CONST. INSP:

REAC. TYPE: BOP NS$$2 ANTITRUST:

RESID. INSP DESIGN PWR 0000 MWT/0000 MWE CONST:

RM ANALYST:

M. KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE -ACTUAL DATE Review in abeyance pending the future of standardization, l

and resources to conduct review.

ER DOCKETED:

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

i CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

11/23/77 11/23/77C l

SAR DOCKETED:

02/c2/78 02/ 02/78C --'

1 SAR Q'S RECEIVED BY PM:

N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S ISSUE DRAFT SER:

INPUT TO SER:

N/S ISSUE SER:

N/S ACRS FULL CDt21ITTEE MEETING:

N/S INPUTS TO SE SUPPLEMENT 1:

.N/S ISSUE SE SUFPLEMENT 1 N/S CURRLNT ANTITRUST:

HEARING STARTED:

-ASLB INITIAL DECISION:

C0!"tISSION DECISION:

SPECIAL PROJECT COMPLETE:

N/S l

LATEST AMENDMENT:

net 4 SLIPS / NOTES:

a t

1 l

l

i M R R' L ICEN3ING SVSTEN PAGE ND: 2-42 (BOP)GAISSAR PDA CURRENT STATUS REP 0RT REPORT.AS OF: 07/10/22 i

PLANT C H A R A C T E R I 5 T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

05000595 LIC. PM:

. UNASSIGNED ASLB CHAIR:

APPLICANT:

GILBERT CCMMONWEALTH LIC. EC J. MILLER MEMBER 13 i

LOCATION:

N/A LIC. LA.:

P. ANDERSON MEM3ER 2:

REGION:

4 AE:

WEST COU:15EL :

M. KARMAN CCNST. INSP:

RESID. INSP:

REAC. TYPE: BOP NSSS:

ANTITRUST:.

B. ST MARY DESIGN PWR: 0000 MMT/0000 MWE CONST:

RM ANALYST:

1 i

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE' ACTUAL DATE Roview in aboyanco pending the future of standardl=ation i

'and resources to conduct review.

ER DOCKETED:

ER SITE VISIT COMPLETE:

ItiPUT TO DES TO PM:

a ISSUE DES:

i RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

02/24/78 02/24/78C SAR DOCKETED:

08/21/78C SAR Q'S RECEIVED BY PM:

N/S r

SAR APPL. RESPONSE TO Q'S RECEIVED: N/S l

CURRENT HRG. STATUS:

INPUT 10 CRAFT SER TO PM:

N/S ISSUE DRAFT SER:

N/S l

INPUT TO SER:

N/$

4 ISSUE SER:

N/S j.

t j

ACRS FULL COMMITTEE MEETING:

N/S INPUTS TO SE SUPPLEMENT 1:

N/S ISSUE SE SUPPLEMENT 1:

.N/S l

1 l

CURRENT ANTITRUST:

l HEARING STARTED:

ASLS INITIAL DECISION:

CCMMISSICM DECISICN:

SPECIAL PROJECT COMPLETE:

N/S LATEST AMENDMENT:

NEW SLIPS / NOTES:'

.m,

NRR LECENSING SVSTEM PAGE NO: 2-43 (BOP)GIBBSSAR (W)

PDA CURRENT STATUS REPORT REPORT AS OF 07/10/82 PLANT CHARACTE%ISTICSt KEY PERS0NNEL DOCKET NO:

05000534 LIC. PM:

UNASSIGNED ASLB CHAIR:

APPLICANT:

GIEBS 1 HILL LIC. BC:

J. MILLER MEMSER 1:

LOCATION:

N/A LIC.

LA.-

P.

ANDERSON MEf13ER 2:

REGION:

0 AE:

GHDR COUNSEL:

M. WAGNER CONST. INSP REAC. TYPE: BOP NSSS:

ANTITRUST:

RESID. INSPt DESIGN PW2: 0000 MWT/0000 MUE CONST:

RM ANAL'IST:

M. ANDERSON CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Review in abeyanco rending the future of standardization and resources to conduct revicw.

ER DOCKETED:

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

S AFETY/l! EARING MILESTONES:

APPLICATICH TENDERED:

10/15/76 10/15/76C SAR DOCKETED:

04/08/77 05/10/77C SAR Q'S RECEIVED BY PM:

02/03/78 03/16/79C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S ISSUE DRAFT SER:

INPUT TO SER:

N/S ISSUE SER:

N/S ACKS FULL CCMMITTEE MEETING:

N/S INPUTS TO SE SUPPLEMENT 1:

N/S ISSUE SE SUPPLEMENT 18 N/S CURRENT ANTITRUST:

HEARING STARTED:

ASLB INITIAL DECISION:

CCMMISSION DECISION:

SPECIAL PROJECT COMPLETE:

N/S LATEST AMENDMENT:

NEW SLIPS / NOTES'

-~

NRR LICEN5ING SYSTEM PAGE NO: 3-64 (80P)SWESSAR/BSAR-205 PDA CURRENT STATUS REP 0RT REPORT AS OF 07/10/82 PLANT CHARACTERISTICSt KEY PERS0NNEL DOCKET NO:

00000595 LIC. PM:

UNASSIGNED ASLB CHAIR:

APPLICANT:

STONE 8 WEBSTER LIC. BC:

J. MILLER MEMBER 1 LOCATION:

N/A LIC. LA.:

P. ANDERSON MEMBER 2:

REGION:

0 AE:

58W COUNSEL UNASSIGNED CONST. INSP REAC. TYPE: BOP HSSS ANTITRUST:

RESID. INSP:

DESIGN PWR 0000 MWT/0000 MWE CONST: N/A RM ANALYST:

M. KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Review in abeyance panding the future of standardization, and resources to conduct review.

ER DOCKETED:

N/A ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

I j

CURRENT ENV. STATUS:

SAFETY / NEARING MILESTCNES:

APPLICATION TENDERED:

12/15/75 12/22/75C SAR DOCKETED:

12/22/75 12/22/75C SAR Q'S RECEIVED BY PM:

11/12/76 04/04/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 01/14/77 05/20/77C CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S ISSUE DRAFT SER:

INPUT TO SER:

09/09/77 10/13/77C ISSUE SER:

10/19/77 12/02/77C ACRS LETTER RECEIVED:

01/15/78 01/13/78C l

INPUTS TO SE SUPPLEMENT 1:

N/S ISSUE SE SUPPLEMENT 1:

N/S i

CURRENT ANTITRUST:

l HEARING STARTED:

ASLB INITIAL DECISION:

C0!! MISSION DECISION:

SPECIAL PROJECT CCMPLETE:

N/S LATEST AMENDMENT:

NEW SLIPS / NOTES:

NRR LICENSING

$YSTEM PAGE NO: 3-45 (HSS)CESSAR SYSTEM 80 FDA CURRENT

$TATUS REP 0OT REPORT AS OF 07/10/82 PLANT CHARACTERI$ TICS:

KEY PERS0NNELa DOCKET ND:

05000A70 LIC, PM:

C. GRIMES ASLB CHAIR:

APPLICANT:

COMBUSTION ENGINEERING LIC. BC:

J. MILLER MEM3ER 1:

LOCATION:

N/A LIC. LA.:

P. ANDERSON MEMBER 2:

REGION:

0 AE:

COUNSEL:

M. WAGNER CONST. INSP:

REAC. TYPE: PWR NSSS: COMB ANTITRUST:

RESID. INSP:

DESIGN PWR 3800 MWT/1295 MWE CONST:

RM ANALYST M. KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER (NUREG-0852) issued 11/81 Awaiting documentation to resolve ACRS, open, and confirmatory issues.

ER DOCKETED:

ER SITE VISIT COMPLETE:

INPUT TO DES TO Pit:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

i N/A.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/27/78 10/27/78C SAR DOCKETED:

12/21/79 12/21/79C SAR Q'S RECEIVED BY PM:

09/01/80 09/01/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 01/01/81 07/15/81C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S N/A.

ISSUE DRAFT SER:

INPUT TO SER:

11/01/81 11/13/81C ISSUE SER:

05/01/82 tt/10/8tC ACRS LETTER RECEIVED:

06/21/82 12/15/81C INPUTS TO SE SUPPLEMENT 1 08/01/82 ISSUE SE SUPPLEMENT 1 08/30/82 CURRENT ANTITRUST:

HEARING STARTED:

N/A ASLB INITIAL DECISIGH:

N/A COMMISSION DECISION:

11/00/82 SPECIAL PROJECT COMPLETE:

11/31/82 LATEST AMENDMENT:

NEW SLIPS / MOTES:

l

. _.. _ _ _ _ _, _ _ _ _ _ ~.

._m.

m l

N.P R LICEN$ING SY$ TEM PAGE NO: 2-46 (NSS)GESSAR SEVERE ACC FDA CURRENT STATUS REP 0RT REPORT AS OF 07/10/82 PLANT CHARACTERISTICSt KEY P E R S O N N E L:

DOCKET NO:

00007447 LIC, PM:

D. LYNCH ASLB CHAIR N/A APPLICANT:

GENERAL ELECTRIC COMPANY LIC. BC:

J. MILLER MEMBER 1:

N/A LOCATION:

N/A LIC. LA.:

P. ANDERSON MEMBER 2 N/A REGION:

0 AE BRAUN COUNSEL:

B. BORDENIK CONST. INSP REAC. TYPE: BWR NSSS: GE ANTITRUST:.

RESID. INSP DESIGN PWR: 3579 MMT/1220 MWE CONST:

RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/82; review is in progress.

Some generic issues are beinq identified / resolved in ER DOCKETED:

conjunction with LRG-II.

Dates shown refIcet review ER SITE VISIT COMPLETE:

for the severo accident design. PRA for severe accident INPUT TO DES TO PM:

dosion was submitted 4/82.

Severe accident design ISSUE DES:

modifications were submitted 6/82 in Amendment RESFONSE TO COMMENTS ON DES:

No.

4.

ISSUE FES:

CURRENT ENV. STATUS:

2 SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

03/31/80 03/31/80C

.SAR DOCKETED:

02/22/82.

02/22/82C SAR Q'S RECEIVED BY PM:

09/01/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 02/01/83 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

ISSUE CRAFT SER:

INPUT TO SER:

02/01/84 ISSUE SER:

03/01/84' i

ACR$ FULL COMMITTEE MEETING:

04/06/84 INPUTS TO SE SUPPLEMENT 1:

.04/21/84 ISSUE SE SUPPLEMENT 1:

05/25/84 F

CURRENT ANTITRUST:

FDA antitrust review is in progress.

HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A COMMISSION DECISION:

05/00/84 SPECIAL PROJECT COMPLETE:

05/00/84 LATEST AMENDMENT:

FDA Amendment No. 4 was received in June, 1982.

NEW SLIPS / NOTES:

i f

r 1

J

~ _ -.. -..

._.u

- -.. ~

. ~.. ~ _ -

HRR LICEHS8HG S[ STEM PAGE NO: 2-47 (HSS)GESSAR-233 NI FDA CURRENV,5TATUS R-E P O R,T REPORT AS OF 07/10/82 l

  • LAH T CHARACTERI5 TICS KEY P E.R S 0 N N E L:

DOCKET N3:

050C0447 LIC. PM:

D. LYNCH ASLB CHAIR

  • N/A APPLICANT:

GENERAL ELECTRIC COMPANY LIC. BC:

J. MILLER MEMBER 1 N/A

[

LOCATION:

N/A-LIC LA.:

P. ANDERSON MEMBER 2 N/A REGIOM:

3 AE:

'2RAUN COUNSEL:

B. BORDENICK CONST..INSP:

REAC. TYPE: BWR HSSS: GE ANTITRUST:

RESID. INSP DESIGN PWR: 3579 MWT/1220 MUE CONST:

Rf1 ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE GESSA2 II was docketed 02/32; reviou is in progress.

Somo conoric issues are being identified / resolved in ER DOCKETED:

conjunction with LRG-II.

Dates shown reflect review ER SITE VISIT COMPLETE:

for the 233 NucIcar Island.

INPUT TO DES TO PM:

ISSUE DES:

i RESPONSE TO COMMENTS ON DES:

ISSUE FES:

i CURRENT ENV. STATUS:

t s

SAFETY / HEARING MILESTONES:

APPLICATIONTEUDERED:

03/31/80

'03/31/80C 1

SAR DOCKETED:

02/22/82 02/22/82C

' SAR Q'S RECEIVED BY PM:

07/16/82 SAR APPL. RESPONSE 10 Q'S RECEIVED: 11/26/82 a

[, -

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

ISSUE DRAFT SER:

INPUT,TO SER:

'02/01/83 ISSUE SER:

03/02/83 ACRS F'ULL COMMITTEE MEETING:

04/05/83-INPUTS TO SE SUPPLEMENT 1:

C4/15/83 ISSUE SE SUPPLEMENT 1:

05/12/33 CURRENT ANTITRUST:

FDA antitrust review is in progress.

HEARING STARTED:

N/A l

ASLB INITIAL DECISION:

N/A COMMISSION DECISION:

05/00/83 SPECIAL PROJECT COMPLETE:

05/00/83 I

' LATEST AMENDMENT:

FDA Amendment No. 4 was received in June, 1982.

NEW SLIPS / NOTES:

I L

t

~

NRR LICEN$ING SYSTEM PAGE NO 2-48 (SP)FHP 1-8 (MANUF.)

SPC CURRENT STATUS REPORT REPORT AS OF 07/1,0/82 PLANT C N A R A C T E R I S T I C S:

KEY P E R S 0 N N E La DOCKET NO:

05000437 LIC. PM:

. UNASSIGNED ASLB CNAIR:

S. WOLFE APPLICANT:

OFFSNORE POWER SYSTEMS LIC. BC:

E. ADENSAM MEMBER 1:

D. SCHINK LOCATION:

JACKSONVILLE, FLA.

LIC. LA.:

M. DUNCAM MEMBER 2:

G. BRIGHT REGION:

2 AE OPS COUNSEL:

D. GODDARD CONST. INSP REAC. TYPE: PWR HSSS: WEST ANTITRUST J. RUTBERG RESID. INSP DESIGN PER: 3411 NWT/1150 MWE CONST: OPS RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE ML matters have been addressed by applicant. SSER 4, covering TMI requirements and other previous unresolved ER DOCKETED:

07/05/73 07/05/73C issues, was issued 09-29-81 An ACRS subcommittee ER SITE VISIT COMPLETE:

08/16/73 08/16/73C meeting was held on 10-15-81.

The ACRS sent a favorable INPUT TO DES TO PM:

07/01/74C letter on 10-19-81.

ISSUE DES:

04/12/74 07/24/74C RESPONSE TO COMMENTS OM DES:

ISSUE FES:

10/06/75 10/06/75C

. CURRENT ENV. STATUS:

All envirnnmental statements have been issued.

SAFETY / NEARING MILESTONES:

APPLICC6 ION TENDERED:

05/07/73 05/07/73C 0AR DOCKETED:

07/05/73 07/05/73C SAR Q'S RECEIVED BY PM:

02/15/74 02/15/74C SAR APPL. RESPONSE TO Q'S RECEIVED: 04/08/74 04/08/74C CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

07/25/75 07/25/75C-Suppl. 4 to the SER,was entered into the record on 12-4-81.

ISSUE DRAFT SER:

Hearing reopened and closed on 12-4-81.

Licensing Board INPUT TO SER:

08/22/75 08/22/75C issued an Initial Decision an 6-30-82, authorizing the.

ISSUE SER!

09/30/75 09/30/75C Director of NRR to issue a manufacturing licensa,-subject to a condition, to OPS for the manufacturing by 'the and ~

- ACRS LETTER RECEIVED:

10/19/81 10/19/81C of 1999 of eight standardized floating nuclear riants at' IhPUTS TO SE SUPPLEMENT is 02/20/76 03/05/76C Blount Island, Jacksonville, Florida.

. ISSUE SE SUPPLEMENT 4:

09/00/81

,09/29/81C CURRENT ANTITEUST:

NEARING STARTED:

06/17/76 0 6/15/76C.-

CA5LB INITIAL DECISION:

06/30/82 06/30/82C

-: COMMISSION DECISION:

09/00/82

~

SPECIAL PROJECT COMPLETE:

09/00/82 LATEST AMENDMENT:

~

~

NEW SLIPS / NOTES:

s M *.

s

.S s

(

M

..)..

HRR LICENSING SYSTEM PAGE NO: 2-49 BLL'E HILLS SITE

.ESR CURRENT STATUS REPORT REPORT AS OF: 07/10/82 PLANT C'H A R A C T E R I S T I C St KEY P E R S O N N E L:

I DOCKET NO:

05007510 LIC. PM:

J. WILSON ASLP CHAIR: Ms MILLER APPLICANT:

GULF STATES UTILITIES LIC. BC:

J. MILLEO MEMBER 12-L. KORNLLITH LOCATION:

NEWTON CCUNTY, TEXAS LIC. LA.:

P. ANDERSON MEMBER 26 L. LITTLE REGION:

4 AE BECH COUNSEL:

C. WOODHEAD CONST. INSP REAC. TYPE: PWR NSSSt CCMB ANTITRUST:.

B. V0GLER' RESID. INSI&

DESIGN PWR: 0000 MWT/0000 MWE CONST:

RM ANALYST:

L. LANIER-CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE ER DOCKETED:

08/26/76 08/26/76C ER SITE VISIT COMPLETE:

09/03/76 09/03/76C INPUT TO DES TO PM:

02/25/77 02/25/77C ISSUE DES:

03/21/77 06/02/77C RESPON3E TO COMMENTS ON DES:

03/23/77 05/05/78C ISSUE FESe 10/14/77 07/17/78C CURRENT ENV. STATUS:

Complete SAFETY / HEARING MIL ESTONES:

APPLICATION TEhDERED:

06/28/74 06/28/74C SAR DOCKETED:

08/23/74 08/23/74C SAR Q'S RECEIVED BY PM:

01/31/75 02/13/7SC SAR APPL. RESPONSE TO Q'S RECEIVED: 07/21/75 07/21/75C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

11/20/75 11/20/75C On 04/28/81 the ASLB issued a Parti.! Initial Decision ISSUE DRAFT SER:

approving Blue Hills site as suitable for location of INPUT TO SER:

08/06/76 10/04/76C a nuclear power plant.

ISSUE SER:

03/07/77 01/07/77C ACRS LETTER RECEIVED:

04/15/77 03/16/77C INPUTS TO SE SUPPLEMENT 1:

05/06/77 05/06/77C ISSUE SE SUPPLEMENT 1:

05/27/77 06/23/77C CURRENT ANTITRUST:

Complete HEARING STARTED:

04/05/79 04/0$/79C ASLB INITIAL DECISION:

04/28/81C SPECIAL PROJECT COMPLETE:

N/S LATEST AMENDMENT:

HEW SLIPS / NOTES:

NRR LZCENSING SYSTEM PAGE NO: 2-50 CARROLL SITE ESR CURRENT STA TUS REPORT REPORT AS OF: 07/10/32 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

CS000S99 LIC. PM" J. WILSON ASLB CHAIR:

J. WOLF APPLICANT:

CGi;MONWEALTH EDISON LIC. BC:

J. MILLER MEMBER 1:

G. BRIGHT LOCATION:

CARROLL COUNTY, IL.

LIC. LA.:

P. ANDERSON MEMBER 2:

R. HOLTON REGION:

3 AE COUNSEL:

R. LESSY CONST. INSP:

REAC. TYPE:

NSSS: WEST ANTITRUST:

A. HDDGDON RESID. INSP:

DESIGN PWR: 0000 MWT/1120 MWE CCNST:

RM ANALYST D. SCHWARZ CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The ecmmercial cperation date has been postponed until 1999 - C000.

This license ER DOCKETED:

04/07/79 04/07/79C is not under active review.

ER SITE VISIT COMPLETE:

N/S INPUT TO DES TO PM:

N/S ISSUE DES:

N/S RESPONSE TO COMMENTS ON DES:

N/S ISSUE FES:

N/S CURRENT ENV. STATUS:

Portions of the alternato site study are under review by DOE.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

12/20/78 12/20/78C SAR DOCKETED:

SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

Five intervonors have been admitted.

ISSUE DRAFT SER:

INPUT TO SER:

ISSUE SER:

ACRS FULL COMMITTEE MEETING:

INPUTS TO SE SUPPLEMENT ISSUE SE SUPPLEMENT 4

CURRENT ANTITRUST:

Awaiting updated Antitrust information from applicant.

HEARING STARTED:

N/S ASLB INITIAL DECISIDH:

N/S SPECIAL PROJECT COMPLETE:

N/S LATEST AMENDMENT:

HEW SLIPS / NOTES:

._m 1

i NRR' LICENSING SYSTEM AS OF 07/10/82 REACT 0RS

~

H0N-P0WER INPUT ISSUE EARLIEST ISSUE

  • TO SER ISSUE FES OR START-ISSUE NON-POWER FACILITY DOCKET D11 TO PM lig EIA HEARING QL COMMENTS i

AFRRI, TRIGA 1000.0000W TANK ESTIMATED DATE: 10/80 N/A 01/82 N/S 09/81 N/S CONTESTED CASE ACTUAL DATE:

10/80C 01/82C NBSR 10.0000W T

. ESTIMATED DATE: 12/80 02/82 09/82 07/82 10/82 POWER INCREASE TO 20 MW ACTUAL DATE:

12/80C 02/82C INCLUDED IN REMEWAL TEXAS A8M, TRIGA 1000.0000W POOL ESTIMATED DATE: 07/79 N/A 09/82 N/S 10/82 ACTUAL DATE:

07/79C U. OF FLA., ARGONAUT 100.0000W GRAPH ESTIMATED DATE: 01/81 N/A 06/82 N/S' N/A 07/82 ACTUAL DATE:

01/81C 06/82C U. OF VA.

2000.0000W POOL ESTIMATED DATE: 03/77 N/A 08/82 08/82 N/A 08/82 ACTUAL DATE:

03/77C WORCHESTER POLY TECH 10.000LW ESTIMATED DATE: 07/79 N/A 07/82 N/S N/A 08/82 ACTUAL DATE:

07/79C 07/82C D FOR TEST REACTORS ONLY i

M M

Z O

M O

LLJ 44

NRR LICENSING SYSTEM PAGE N0: 2-0L CURRENY

$TATUS REPORT REPORT AS OF:

PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

Docket No. or Project No'.,if r.ot docketed LIC. PM:

Licensing Project Manager ASLB CNAIR: ASLB Chairman APPLICANT:

Utility LIC. BC:

Licensing Branch Chief MEMBER 1:

on panel 4

LOCATION:

Miles and direction from nearest major town LIC. LA.:

Licensing Assistant MEMBER 28 on penel REGION:

1 through 5 AEr Architect / Engineer COUNSEL:

Attorney assigned to case CONST. INS P : Construction inspector.

REAC. TYPE: PWR, BWR, HTGR or LMFBR NSSS: Nuclear Steam Systems Supplier ANTITRUST:

Antitrust Attorney RESID INSP: Resident inspector DESIGN PWR: Megawatts electric & thermal CONST: Constructor MP A AN ALYST : MPA analyst assigned to track prog,ect CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Safety status for this reporting period only, it consists of accomplishments and schedule changes occurring since the last issue of Blue Book. Outstanding issues and late input from ER DOCKETED:

Environmental Report review branches should be indicated, along with indication of the critical path.

P 0

T Project Manager ISSUE DES:

Draft Environmental Statement RESPONSE TO COMMENTS ON DES:

ISSUE FES:

Final Environmental Statement CUPRENT ENV. STATUS:

Environmental status for this reporting period only. It consists of accomplishments and schedule changes occursing since the last issue of Blue Book. Outstanding issues and late SAFETY / NEARING MILESTONES:

input from review branches should be indicated.

APPLICATION TENDERED:

SAR LCCKETED:

Safety Analysis Report SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRElii NRG. STATUS:

INPUT TO DRAFT SER TO PM:

Changes in the hearing tiates since the last issue of Blue Book. Changes in intervention and ISSUE DRAFT SER Safety Evaluation Report ER:

contentions should be indicated. '

ACRS-LETTER RECEIVED:

Advisory Committee INPUTS TO SE SUPPLEMENT 3:

on Reactor Safeguards ISSUE SE SUPPLEMENT 3:

FEMA LETTER RECEIVED:

Sa'ety Evaluation Supplement CURRENT ANTITRUST Changes in the antitrust status since the last issue of Blue Book.

HEARING STARTED:

ASLB INITIAL DECISICH:

Atomic Safety & Licersing Board ASLB FINAL DECISION:

TECH SPECS COMPLETED:

COMMISSION DECISION:

ISSUE P ARTI AL POWER LICENSE:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE:

The latest amendment submitted by the applicant.

SCHED. DATE RECEIPT DATE i

HEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.

1* Igg

' Slips or potential problems that should be brought to management's attention.

construction in construction completion comple+ ion

-i

l l

"## b 00 #

U $ NUCLE AR REGUL ATORY COMMISSION g,

BIBLIOGRAPHIC DATA SHEET NUREG-0580 Vol.11 No. 7

2. (Leeve stan&J 4 TlT LE AND SUBT ITLE (Add Voturne No, d eproptsare)

Regulatory Licensing Status Sunmary Report a RE CiPiENT S ACCE SSION NO.

(Bluebook)

5. DATE REPORT COMPLE TE D 5 AU T HOR LSI l YEAR MONTH July 1982 OATE RE PORT ISSUE D 9 PE f4F OAMING ORGAN 12ATION N AME AND M AILING AODRESS (/nclude Inp Code /

Office of Resource Management "J u l'y" I $N2

~

Management Infonnation Branch 6"""***'

U. S. Nuclear Regulatory Coninission Washington, D.C.

20555

8. (Leore Nanki
12. SPONSORING ORGANIZ ATION NAME AND M AILING ADDRE SS (factude Inp Codel 10 PROJE CT!T ASK/ WORK UNIT NU.

Office of Resource Management II. CON TR ACT NO.

Management Infonnation Branch U. S. Nuclear Regulatory Conmission Washington, D.C.

20555 PE RIOD COVE RE D (inclus<re deresJ 13 TYPE OF REPORT June 17 - July 10,198/

34 4 *'d "'"'

  • I
15. SUPPLE ME NT ARY NOTES 16 ABSTR ACT QOO *ords or lessl Provide a review of the status of the progress of the licensing reviews for all construction permits, operating license, special project and non-power reactor renewals under review, as reported to Congress.

17a DE SCRIPTORS

17. KE Y WOR DS AND DOCUME NT AN ALYSIS 17b IDE NTIF IE R$' OPE N ENDE D TE RMS 21 NO OF P AGE S 19 SE CURIT Y CL ASS (In s arporff 18 AV AIL ABILIT Y ST ATE ME NT Unclassified 22 PRICE AS} tIr 4 part Unlimited 20 i1Y C O U.S. GOVERNMENT PRINTING OFFICE: 1982 - o-361-302/45

UNITED STATES NUCLEAR RE20LATORY COMMISSION

,$}Ujyf,5,y)[,,

usaac WASHINGTON, D C. 20555 eASM 3C Pfauffto g OFFICIAL BUSINESS PENALTY FOR PRIVATE USE. 4300 12055 W ldt'll 1 ANND US Nkl ADM ;)I V r'l I l i)L Pi,L I L Y r.

PU BL 1 L Al I t T,$ M Lil ak L ij P Y P0H NJR'fi LA /1/

wAsuiNiilLN I)C 2155S 1

1