Forwards IE Insp Repts 50-259/82-15,50-260/82-15 & 50-296/82-15 on 820426-0525 & Notice of Violation
ML20062J981
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/03/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20062J893 List:
References
NUDOCS 8208160515
Download: ML20062J981 (2)


See also: IR 05000259/1982015

Text

T  ; .

  • ** . ,

/cIIou3

JUN 0 3 1981

Tennessee Valley Authority

ATTN: Mr. H. G. Parris

fianager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

Subject: Report Nos.k259/82-lh0-260/82-15, and 50-296/82-15

This refers to the routine safety inspection conducted by Mr. J. Chase of this

office on April 26 - May 25,1982, of activities authorized by NRC Operating

License Nos. DPR-33, DPR-52, and CPR-68 for the Browns Ferry facility. Our

preliminary findings were discussed with Mr. G. T. Jones, Power Plant

Superintendent, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate HRC requirements. These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A. Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

One new unresolved item is identified in the enclosed inspection report. This

item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter. Such application must be consistent with the requirements of

2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

~

8208160515 820804

PDR ADOCK 05000259

G PDR

_

.

.

.

. .

Tennessee Valley Authority 2 JUN 0 3 ISE

Shculd you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

me.,

R. C. L.wis, Director

Division of Project and

Resident Programs

Enclosures:

1. Appendix A, Notice of Violation

2. Inspection Report Nos. 50-259/82-15,

50-260/82-15, and 50-296/82-15

cc w/ encl:

H. J. Green, Director of Nuclear Power

G. T. Jones, Plant Superintendent

R. E. Rogers, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

bcc w/ encl:

'

i NRC Resident Inspector

Document flanagement Branch

<

State of Alabama

i

!

l

l

RII RII  % RII Y

,

46 Rqucher RII'? r-skn1 gy?

l

JChase:dt B FCantrell E. bewtr U S

s/s /82 6/ / /82 5/ &/82 g/J/82