ML20062J789

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-275/82-23 & 50-323/82-12 on 820721-23.No Noncompliance Noted
ML20062J789
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/30/1982
From: Book H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML20062J793 List:
References
NUDOCS 8208160466
Download: ML20062J789 (4)


See also: IR 05000275/1982023

Text

,____ _ _

'

$

"

,i

jg 3 01982

,

Docket No. 50-275, 50-323

Pacific Gas and Electric Company

77 Bnale Street

San I,*rancisco, California 94106

Atterction: fir. Philip A. Crane, Jr.

Assistant General Counsel

Gentlemen:

Subje ct: NRC Inspection - Diablo Canyon Units 1 and 2

This refers to the routine inspection conducted by Mr. North of this office

on Jtly 21-23, 1982 of activities authorized by NRC License and Construction

Penn'.t Mos. DPR-76 and CPPR-69, and to the discussion of our findings held

by Mr. North with f1r. Thornberry and other members of your staff at the

conc'iusion of the inspection.

Areas examined during this inspection are described in the enclosed

insrection report. Within these areas, the inspection consisted of

seltsctive examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

No itens of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold infonnation contained therein within thirty days

of the date of this letter. Such application riust be consistent with the

requirements of 2.790(b)(1).

8208160466 82073o

~

PDR ADOCK 0500o275

O

PDR

.,

lf l

'"C'>

N. . .

. . .

..

.

..

.

.

.

.

.. .

.

. . . .

"""> ..NORTE.....

. WENSLAWSKl. .

00K.

.

.

..

.

.

.

..,

~4

. .v.M.82. . . . ..m7/n.....

..vf/.82

.

.

.

. .

..

.

.

..

. . ,

NRCFORM 318 410,00l N R C M O 2 4 0

OFFICIAL RECORD COPY

s e mea 2n2{

_.

- . .

. -

- - -

.

.

.

Pacific Gas'and Electric Company

-2--

JU( 3 01982

,

-

Should you have any questions concerning this' inspection, we will be glad

'

to. discuss them with you.

~

  • ~

Sincerely.

,

Urigin.1! sW By

H.E. Boor

11. E. Book, Chief

Radiological Safety Branch

.,

Enclosure:

' Inspection Report

,fio. 50-275/82-23

50-323/82-12

cc w/o enclosure:

W. A. Raymond, PGAE

R. C. Thornberry, Plant Manager.

bec: DMB/ Document Control Desk (RI'DS)

,

Distributed by RV:

State of CA (Johnson)

Resident Inspector

Engelken

'

Sandra Silver (Report only)

i

1

,

,

t

b

s

,

e

' [p

,

-

,

- -

.

. -.

. .

,

.

p urg

UNITED STATES

~

["

g

NUCLEAR REEULATCRY COMMISSION

g

j

REGION V

C

%,

,o'g

1450 MARIA LANE,SulTE 210

WALNUT CREEK, CALIFORNIA 94596

N

July 30, 1982

!

Docket No. 50-275, 50-323

Pacific Gas and Electric Company

77 Beale Street

San Francisco, California 94106

Attention: Mr. Philip A. Crane, Jr.

Assistant General Counsel

Gentlemen:

Subject: NRC Inspection - Diablo Canyon Units 1 and 2

This refers to the routine inspection conducted by Mr. North of this office

on July.21-23, 1982 of activities authorized by NRC License and Construction

Permit Nos. DPR-76 and CPPR-69, and to the discussion of our findings held

by Mr. North with Mr. Thornberry and other members of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days

of the date of this letter.

Such application must be consistent with the

requirements of 2.790(b)(1).

..

.

. _ . _ .

.

. , _ _ . _ . _ , . . _ _ -

- - _ - _ .

. _

_

. . _

.

-

-

. . _ _

.__ _

_

\\

!

.

Pacific Gas and Electric Company

-2-

July 30, 1982

'

N

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

'

Sincerely,

&

c

.

H. E. Book, Chief

Radiological Safety Branch

i

!

Enclosure:

"

Inspection Report

No. 50-275/82-23

l

50-323/82-12

cc w/o enclosure:

W. A. Raymond, PG&E

R. C. Thornberry, Plant Manager

'