MONTHYEARML20063N7591982-10-0606 October 1982 Withdrawal of Application for CP ML20063N7471982-10-0606 October 1982 Motion for Termination of Proceedings.Util Decided to Cancel Plant.Certificate of Svc Encl ML20055A7221982-07-15015 July 1982 Memorandum & Order Denying Jf Doherty 820615 Submittals, Treated as Motion to Reconsider ASLB 820602 Order.Motion Untimely Filed & Failed to Show Significance or Gravity of Issues ML20055A3551982-07-12012 July 1982 Amended Contention 59.Certificate of Svc Encl ML20054L5531982-07-0202 July 1982 Response Opposing Doherty 820615 Motion to Reopen Record to Add Contention 59.Motion Should Be Considered Motion for Reconsideration of ASLB 820602 Order.Timeliness & Significance of Issues Not Established.W/Certificate of Svc ML20054L4521982-07-0202 July 1982 Response Opposing J Doherty 820615 Motion to Reopen Record to Add Contention 59.Motion Fails to Establish Timeliness &/Or Significance of Issues Sought to Be Raised.Certificate of Svc Encl ML20054J9371982-06-28028 June 1982 Response Opposing J Doherty 820615 Request to Reopen Record. Request Improper & Insufficient to Support Relief.Commission Rules Cannot Be Circumvented by Refiling Same Argument After ASLB Ruling Issued.Certificate of Svc Encl ML20054F9861982-06-15015 June 1982 Motion to Reopen Record to Take Evidence on Contention 59. Gravity of Issues Warrants Reopening ML20054G0171982-06-15015 June 1982 Contention 50 Re Brown & Root Deficiencies in Quadrex Rept. Certificate of Svc Encl ML20053D6371982-06-0202 June 1982 Memorandum & Order Denying J Doherty 820422 Motion Re Contention 58 on Applicant Conduct on Reporting Violations. Applicant 820519 Motion to Strike Doherty 820514 Reply Granted ML20053A3961982-05-24024 May 1982 Order Extending Commission Time to Review ALAB-671 Until 820601 ML20053D0861982-05-24024 May 1982 Response in Opposition to Util 820519 Motion to Strike Doherty Contention 58 Re Applicant Conduct on Reporting Violations.Contention Should Be Treated as Such,Not as Motion.Certificate of Svc Encl.Related Correspondence ML20052H8621982-05-19019 May 1982 Motion to Strike J Doherty Reply to Applicant 820507 Response to Doherty 820422 Motion to Add Contention 58. Commission Rules Do Not Allow Reply.Certificate of Svc Encl ML20052H4441982-05-14014 May 1982 Reply Opposing Applicant 820507 Response to J Doherty 820422 Motion to Add Contention 58.Contention Should Be Admitted W/Amends.Aslb Should Judge Conduct of Applicants. Certificate of Svc Encl ML20052F9941982-05-12012 May 1982 Response Opposing J Doherty 820422 Motion to Add Contention 58.Intervenor Fails to Meet Required Stds to Reopen Record & for Untimely Filings.Certificate of Svc Encl ML20052F2971982-05-10010 May 1982 Order Extending Time Until 820524 for Commission to Determine Whether to Review ALAB-671 ML20052F3121982-05-0707 May 1982 Response Opposing J Doherty 820422 Motion to Add Contention Re Alleged Failure to Rept Design Defects.Substantively, Motion Is Motion to Reopen Record & Stds Have Not Been Met. Certificate of Svc Encl ML20052D1221982-04-29029 April 1982 Findings of Fact on Supplemental Issues to Tx Pirg Addl Contention 31 Re Technical Qualifications.Certificate of Svc Encl ML20052A4541982-04-22022 April 1982 Submittal of Contention 58 Re Applicant Conduct on Reporting Violations at Plant.Certificate of Svc Encl ML20054E0561982-04-21021 April 1982 Supplemental Findings of Fact on Tx Pirg Addl Contention 31 Re Technical Qualifications.Certificate of Svc Encl ML20054D5251982-04-20020 April 1982 Order Incorporating ASLB Rulings at 820412 Hearing Re Tx Pirg 820405 Motion to Enter Counsel for cross-examination & to Reconsider 820128 Order.Motion Denied But Tx Pirg Permitted to Submit Written cross-examination Questions ML20054B6981982-04-14014 April 1982 Transcript of 820414 Hearing.Pp 21,787-22,027 ML20050E2181982-04-0808 April 1982 Order Ruling on Doherty Motions.Request for Production of Bechtel Quadrex Rept Review Moot Since Applicant Furnished Rept on 820316.Motion of 820315 for Subpoena of Quadrex Corp Employees Denied W/O Prejudice ML20050J1111982-04-0606 April 1982 Answers to Second & Third Sets of Interrogatories,Questions 29 & 8 Respectively,Re Quadrex Rept.Certificate of Svc Encl. Related Correspondence ML20050E2891982-04-0505 April 1982 Answers & Objections to Doherty Sixth Set of Interrogatories.Related Correspondence ML20050E2961982-04-0505 April 1982 Answers & Objections to Seventh Set of Interrogatories. Certificate of Svc Encl.Related Correspondence ML20050C4211982-04-0202 April 1982 Objections to Request for Admissions.Requests Untimely, Irrelevant to Issues Before ASLB & Extremely & Unduly Burdensome.Certificate of Svc Encl.Related Correspondence ML20050B1141982-03-31031 March 1982 Decision ALAB-671,affirming ASLB Decision Denying R Alexander Petition to Intervene.Aslb Assessment of Untimeliness of Petition Free of Matl Error.Issue Raised No Longer Cognizable ML20050C4081982-03-31031 March 1982 Answers & Objections to Fifth Set of Interrogatories. Certificate of Svc Encl.Related Correspondence ML20042C5661982-03-30030 March 1982 Reply Opposing Tx PIRG,810315 Proposed Findings of Fact & Conclusions of Law.Proposed Findings Are Collection of Disjointed Thoughts & Facts W/No Rational Assessment of Effect on Problem or Issue Discussed.W/Certificate of Svc ML20042C6431982-03-29029 March 1982 Motion for ASLB to Call DE Sells as Witness for Tx Pirg Addl Contention 31 & Quadrex-related Matters.Testimony Needed to Explain Why NRC Did Not Immediately Obtain Quadrex Rept. Certificate of Svc Encl ML20042C6181982-03-29029 March 1982 Response Opposing J Doherty 820315 Motion for ASLB to Subpoena Quadrex Corp Employee Witnesses as ASLB Witnesses. Request Is Based on Misperception of Scope of Reopened Hearings.Certificate of Svc Encl ML20050C4791982-03-29029 March 1982 Answers & Objections to Jf Doherty Fourth Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Matters. Certificate of Svc Encl.Related Correspondence ML20050C5011982-03-26026 March 1982 Supplemental Testimony of Jh Goldberg on Technical Qualifications.Brown & Root Terminates Due to Lack of Engineering Productivity,Not Due to Allegations in Quadrex Rept ML20050C5041982-03-26026 March 1982 Testimony of Lj Sas on Tx Pirg Addl Contention 31 Re Quadrex Rept.Rept Raises No Issue as to Whether Ebasco Can Properly Engineer Project.Prof Qualifications Encl ML20050C5091982-03-26026 March 1982 Response to Jf Doherty 20th & 21st Requests for Documents. Certificate of Svc Encl ML20049K0801982-03-25025 March 1982 Answers & Objections to Interrogatories.Certificate of Svc Encl ML20049K0671982-03-25025 March 1982 Reply to Tx Pirg 820315 Addl Proposed Findings of Fact & Conclusions of Law.Certificate of Svc Encl ML20042C5201982-03-25025 March 1982 Motion to Compel Discovery from Applicant & to Postpone Evidentiary Presentations at 820412 Hearings.Applicant Objections to Interrogatories Unsupported & Necessitate Hearings Be Delayed.Certificate of Svc Encl ML20049J9651982-03-24024 March 1982 Testimony of Fr Allenspach & JW Gilray Per ASLB 810128 Order Re Doherty Renewed Motion for Addl Evidence on Tx Pirg Addl Contention 31.Quadrex Rept Does Not Alter Previous Conclusions That Applicant Technically Qualified ML20049J9701982-03-24024 March 1982 Answers to First Set of Interrogatories Re Tx Pirg Contention 31.Certificate of Svc Encl ML20049J9671982-03-24024 March 1982 Response to First Set of Interrogatories & Request for Production of Documents Re Tx Pirg Contention 31 ML20049K0841982-03-23023 March 1982 Answers & Objections to Third Set of Interrogatories. Certificate of Svc Encl ML20049K0941982-03-23023 March 1982 Answers & Objections to Second Set of Interrogatories. Certificate of Svc Encl ML20042C5481982-03-23023 March 1982 Fourth Set of Requests for Admissions Re Quadrex Rept & Tx Pirg Contention 31.Certificate of Svc Encl ML20042A2721982-03-18018 March 1982 Order Scheduling 820412-16 Evidentiary Hearing to Receive Addl Evidence in Houston,Tx ML20042A2771982-03-18018 March 1982 Memorandum & Order Denying J Doherty 820310 Motion for Postponement of 820412 Hearing on Tx Pirg Addl Contention 31 & Quadrex-related Matters.Ample Time to Complete Discovery Given.Personal Obligations Are No Excuse ML20042B2351982-03-17017 March 1982 Seventh Set of Interrogatories Re Tx Pirg Addl Contention 31 & Quadrex Rept Matters.Certificate of Svc Encl ML20042A4791982-03-17017 March 1982 Response Opposing J Doherty 820310 Motion for Postponement of 820412 Hearings.Sufficient Grounds Not Provided to Justify Delay.Certificate of Svc Encl ML20041G1711982-03-17017 March 1982 Response Opposing J Doherty 820310 Motion to Postpone 820412 Hearing on Quadrex Rept.Doherty Cannot Profit from Failure to Comply W/Aslb Order Re Completion of Discovery by Postponing Hearing.Certificate of Svc Encl 1982-07-02
[Table view] Category:PLEADINGS
MONTHYEARML20063N7471982-10-0606 October 1982 Motion for Termination of Proceedings.Util Decided to Cancel Plant.Certificate of Svc Encl ML20054L5531982-07-0202 July 1982 Response Opposing Doherty 820615 Motion to Reopen Record to Add Contention 59.Motion Should Be Considered Motion for Reconsideration of ASLB 820602 Order.Timeliness & Significance of Issues Not Established.W/Certificate of Svc ML20054L4521982-07-0202 July 1982 Response Opposing J Doherty 820615 Motion to Reopen Record to Add Contention 59.Motion Fails to Establish Timeliness &/Or Significance of Issues Sought to Be Raised.Certificate of Svc Encl ML20054J9371982-06-28028 June 1982 Response Opposing J Doherty 820615 Request to Reopen Record. Request Improper & Insufficient to Support Relief.Commission Rules Cannot Be Circumvented by Refiling Same Argument After ASLB Ruling Issued.Certificate of Svc Encl ML20054F9861982-06-15015 June 1982 Motion to Reopen Record to Take Evidence on Contention 59. Gravity of Issues Warrants Reopening ML20053D0861982-05-24024 May 1982 Response in Opposition to Util 820519 Motion to Strike Doherty Contention 58 Re Applicant Conduct on Reporting Violations.Contention Should Be Treated as Such,Not as Motion.Certificate of Svc Encl.Related Correspondence ML20052H8621982-05-19019 May 1982 Motion to Strike J Doherty Reply to Applicant 820507 Response to Doherty 820422 Motion to Add Contention 58. Commission Rules Do Not Allow Reply.Certificate of Svc Encl ML20052H4441982-05-14014 May 1982 Reply Opposing Applicant 820507 Response to J Doherty 820422 Motion to Add Contention 58.Contention Should Be Admitted W/Amends.Aslb Should Judge Conduct of Applicants. Certificate of Svc Encl ML20052F9941982-05-12012 May 1982 Response Opposing J Doherty 820422 Motion to Add Contention 58.Intervenor Fails to Meet Required Stds to Reopen Record & for Untimely Filings.Certificate of Svc Encl ML20052F3121982-05-0707 May 1982 Response Opposing J Doherty 820422 Motion to Add Contention Re Alleged Failure to Rept Design Defects.Substantively, Motion Is Motion to Reopen Record & Stds Have Not Been Met. Certificate of Svc Encl ML20042C6431982-03-29029 March 1982 Motion for ASLB to Call DE Sells as Witness for Tx Pirg Addl Contention 31 & Quadrex-related Matters.Testimony Needed to Explain Why NRC Did Not Immediately Obtain Quadrex Rept. Certificate of Svc Encl ML20042C6181982-03-29029 March 1982 Response Opposing J Doherty 820315 Motion for ASLB to Subpoena Quadrex Corp Employee Witnesses as ASLB Witnesses. Request Is Based on Misperception of Scope of Reopened Hearings.Certificate of Svc Encl ML20042C5201982-03-25025 March 1982 Motion to Compel Discovery from Applicant & to Postpone Evidentiary Presentations at 820412 Hearings.Applicant Objections to Interrogatories Unsupported & Necessitate Hearings Be Delayed.Certificate of Svc Encl ML20042A4791982-03-17017 March 1982 Response Opposing J Doherty 820310 Motion for Postponement of 820412 Hearings.Sufficient Grounds Not Provided to Justify Delay.Certificate of Svc Encl ML20041G1711982-03-17017 March 1982 Response Opposing J Doherty 820310 Motion to Postpone 820412 Hearing on Quadrex Rept.Doherty Cannot Profit from Failure to Comply W/Aslb Order Re Completion of Discovery by Postponing Hearing.Certificate of Svc Encl ML20041F0871982-03-10010 March 1982 Motion for Postponement of 820412 Hearing on Tx Pirg Addl Contention 31 & Quadrex-related Matters.Addl Time Needed to Complete Discovery.Certificate of Svc Encl ML20041E1541982-03-0808 March 1982 Response Opposing D Marrack 820218 Motion for Review of Dates for Reopening Hearing & Continuance.Aslb Lacks Authority to Order Continuance Until Util Irrevocable Commitment Made.Certificate of Svc Encl ML20041E1741982-03-0505 March 1982 Brief Opposing R Alexander Appeal from ASLB 820112 Order Denying Petition to Intervene.Aslb Did Not Abuse Discretion in Denying Petition.Certificate of Svc Encl ML20041E1201982-03-0505 March 1982 Motion for Order Directing Applicant to Provide Forthcoming Bechtel Quadrex Rept Review.Rept Pertinent to Remaining Issue.Certificate of Svc Encl.Related Correspondence ML20049H8881982-03-0101 March 1982 Response Opposing D Marrack 820213 Motion for Review of Dates for Reopening Hearings & Continuance.No Commission Regulations or Atomic Energy Act Provisions Require Applicant Irrevocable Commitment.Certificate of Svc Encl ML20041C0671982-02-22022 February 1982 Response Opposing Tx Pirg 820209 Motion for Addl Time to File Proposed Findings of Fact & Conclusion of Law.Motion Mooted by Tx Pirg Filing Proposed Findings on 820212. Certificate of Svc Encl ML20041B4821982-02-22022 February 1982 Response Opposing Tx Pirg 820209 Motion for Addl Time to File Proposed Findings of Fact & Conclusions of Law.Schedule Already Extended in Consideration of Length of Record.No New Development Set Forth.Certificate of Svc Encl ML20041B5901982-02-13013 February 1982 Motion for Postponement of All Action on CP Application Until Applicant States That Util Irrevocably Committed to Building Plant If CP Received.Certificate of Svc Encl ML20040H0761982-02-0909 February 1982 Motion for 30 Addl Days to File Proposed Findings of Fact & Conclusions of Law.Length of Record Necessitates Extension. Decision Would Not Be Delayed Since Addl Hearings to Be Held in Apr 1982 ML20040E2781982-01-29029 January 1982 Requests for Clarification Re R Alexander 811130 Petition to Intervene.J Silberg Indicates That Order Denying Petition Issued,But No Order Has Been Served.Certificate of Svc Encl ML20039B7481981-12-17017 December 1981 Response Opposing Tx Pirg 811207 Motions for Addl Testimony, Further Development of Record & Admission of New Contention. Motion Superficial Attempt to Delay Proceeding & Totally Devoid of Merit.Certificate of Svc Encl ML20062M6441981-12-14014 December 1981 Response Opposing Doherty 811015 Renewed Motion for Addl Evidence on Tx Pirg Contention 31.Doherty Failed to Comply W/Aslb 811110 Order.Motion Is W/O Merit & Would Cause Unnecessary Delay.Certificate of Svc Encl ML20039B0771981-12-0707 December 1981 Renewed Motion for Addl Evidence on Tx Pirg Addl Contention 31 Re Applicant Technical Qualifications.Specifies Portions of Quadrex Rept,Indicating Organizational Changes That Should Be Made.Certificate of Svc Encl ML20062M6241981-12-0707 December 1981 Motion for Tx Pirg to Present Addl Evidence,To Order Applicant to Serve Tx Pirg W/Quadrex Rept & to Rule That Need for Power Is Tx Pirg Contention.Alternatively,Requests Admittance as Tx Pirg Contention.W/Certificate of Svc ML20033B3381981-11-27027 November 1981 Response Opposing Doherty 811106 Motion to Require Applicant to Submit Addl Testimony on Need for Power.Motion Should Be Considered as Motion to Reopen Record.Issue Not Significant to Warrant Reopening.W/Certificate of Svc ML20033C0201981-11-25025 November 1981 Response Opposing Applicant 811120 Response to Doherty Motion for Addl Testimony.Motion Was Not Motion to Reopen Record Since Motion Filed Prior to Hearing Closing.Burdens Cited Under Motion to Reopen Inapplicable ML20033C0091981-11-25025 November 1981 Request for Leave to File Response to Applicant 811120 Response to Doherty Motion for Addl Testimony on Need for Power.Applicant Response Is Erroneous & Time for Completion of Evidentiary Hearing Short.Certificate of Svc Encl ML20038A8841981-11-20020 November 1981 Response Opposing Doherty 811106 Motion for Addl Testimony on Need for Power.Pleading Construed as Motion to Reopen Record.Burden of Explaining Why ASLB Would Reach Different Result Not Met.W/Certificate of Svc.Related Correspondence ML20032C1801981-11-0505 November 1981 Motion to File NRC Responses to Doherty Motion for Addl Evidence on Tx Pirg Addl Contention 31 One Day Late ML20032B3721981-10-30030 October 1981 Reply Opposing Doherty 811015 Motion to Reopen Record on Tx Pirg Addl Contention 31.Doherty Failed to Establish That Rept Controverts Specific Testimony & That Issues Are Beyond Scope of Contention.W/Certificate of Svc ML20032B3411981-10-30030 October 1981 Joint Motion to Establish Schedule to File Proposed Findings of Fact & Conclusions of Law.Parties Should Be Put on Notice of Schedule for Planning Purposes.Certificate of Svc Encl ML20031H0991981-10-15015 October 1981 Motion for Addl Evidence on Tx Pirg Addl Contention 31 Re Applicant Technical Qualifications.Addl Testimony Sought Due to Recently Released Rept on Design Deficiencies at South Tx Project ML20031A9381981-09-18018 September 1981 Request That ASLB Issue Order Re Mccorkle Contentions 14 & 17,TX Pirg Addl Contentions 6 & 40 & Doherty Contentions 5, 15,38-B,43 & 44,that Applicant & NRC Statements of Matl Facts Will Not Be Subj to Litigation.W/Certificate of Svc ML20010G1101981-09-0303 September 1981 Response to ASLB Request Re Positions on ALAB-640.Radon Emissions Determined by ALAB-640 Constitute Significant Addl Environ Impact.Certificate of Svc Encl ML20010F4791981-09-0303 September 1981 Response Opposing Further Consideration of Radon Releases. NRC Analysis of Radon Releases in Final Suppl to Fes Satisfies NEPA Requirements,Complies W/Commission 780414 Order & Supplies Sufficient Info.Certificate of Svc Encl ML20010C3341981-08-13013 August 1981 Response in Support of Applicant 810805 Motion to Strike Substantial Portion of D Marrack Supplemental Testimony. Statements Are Arguments & Not Testimony.Certificate of Svc Encl ML20010A1171981-08-0505 August 1981 Motion to Strike Marrack Prefiled Testimony.Testimony Is Not Specifically Responsive to F Sanders 810205-06 Testimony. Certificate of Svc Encl.Related Correspondence ML20009B2001981-07-13013 July 1981 Response Opposing Doherty 810622 Motion to File Contention 57 Re Vulnerability of Control Sys in Nuclear Power Plants to Electromagnetic Pulses Per Nuclear Detonations.Issue Does Not Warrant License Revisions.Certificate of Svc Encl ML20009B2031981-07-0707 July 1981 Response in Opposition to Intervenor Doherty 810622 Request for Leave to File Contention 57.No Good Cause Shown for Late Filing & No Specificity Provided.W/Science News Article & Certificate of Svc ML20005B3801981-06-22022 June 1981 Request for Leave to File & Submission of Contention 57 Re Vulnerability of Control Sys to Electromagnetic Pulses. Issue Has Not Been Made Public Until Recently.W/Certificate of Svc ML20004B6091981-05-27027 May 1981 Response Opposing Doherty 810423 Motion to Add Late Filed Contention 56.Postulated Accident Only Applicable to B&W Design Facility & Allens Creek Has Mark III Containment Design.Certificate of Svc Encl ML19347F4941981-05-0808 May 1981 Reply Opposing Doherty 810423 Filing Re Contention 56, If Filing Is Motion to Add Late Filed Contention. Contention Refs Alleged Problem at Browns Ferry Which Is Not Applicable to Mark III Containments.W/Certificate of Svc ML20008F7671981-05-0808 May 1981 Response Supporting Applicant 810422 Motion to Preclude Jm Scott Testimony.Aslb 810407 Order Forbids Scott to Serve as Counsel & Expert Witness.Certificate of Svc Encl ML19347F4661981-05-0808 May 1981 Response Opposing Doherty 810423 Motion to Reopen Record on Need for Power Contention.Aslb Should Issue Order That Motion Is Moot & Direct Applicant to Update Testimony on Need for Power Testimony Later.Certificate of Svc Encl ML20003H9551981-04-29029 April 1981 Motion for Order Adopting Specific Procedures to Govern Conduct of cross-examination During Health & Safety Phase of Proceeding.Procedures Will Ensure cross-examination Not Cumulative.W/Proposed Order & Certificate of Svc 1982-07-02
[Table view] |
Text
1 O
UNITED STATES OF AMERICA i
NUCLEAR REGULATORY COMMISSION
{
1 BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of S
S HOUSTON LIGHTING & POWER S
COMPANY S
Docket No. 50-466 S
(Allens Creek Nuclear S
Generating Station, Unit S
No. 1)
S APPLICANT'S MOTION FOR
SUMMARY
DISPOSITION ON INTERVENOR DOHERTY'S CONTENTION NO. 28 t
Applicant moves the Board under 10 CFR S 2.749 to grant summary disposition with respect to Intervenor Doherty's l
Contention No. 29 relating to control rod ejection accidents.
l As shown in the accompanying statement of material facts as to which there is no genuine issue to be heard, and the affidavit c
of Donald L.
Peterson there is no issue to try in this i
proceeding and Applicant is entitled under S 2.749 to have i
the contention summarily dismissed as a matter of law.
i e
The contention Doherty's Contention No. 23 states:
Applicant's PSAR does not consider the possibility of a control rod ejection accident adequately.
This endangers Intervenor's interests with a reactivity insertion accident.
Applicant states (p. 15.1-73 of the PSAR) that "In all cases the subsequent withdrawal speeds (that is speeds due to an ' unplanned withdrawal' which are variable) are less than a rod drop accident," ~
inferring the consequences must be less.
But, in a B 0 0 819 0120 18~o
control rod ejection, the rod would be forced out by the containment pressure and possibly the pressure in the SCRAM discharge volume tank (SDVT) would be additional, creating a more rapid rod ejection as opposed to rod drop.
That such SDVT pressures have occurred is set forth in TexPirg's Contention No. 32 of May 16, 1979.
Rapid pulling of a rod, led to a fatal power excursion with the Stationary Low Power Plant S-L-1 reactor in January, 1961.
Applicant should be required to show its control rod system is safe for a control rod ejection accident against transients, calculate the effects on a control rod ejection on the public safety and show why a control rod ejection is impossible.
Argument Intervenor takes issue with the conclusion in the Preliminary Safety Analysis Report that worst-case postulated
~
control rod ejection accidents are bounded by the rod drop accidenr.
The PSAR conclusion is based on the fact that all possible control rod ejection events produce calculated rod withdrawal speeds less than the control rod drop withdrawal speed.
Since reactivity addition rate (rod withdrawal speed) is the determinative factor in resulting energy deposition and, hence, potential fuel damage, the worst-case event is determined by comparing withdrawal speeds in postulated sequences.
Intervenor specifically argues that the above-f described comparison fails to account for three items:
(1)
SCRAM discharge volume pressure acting on a control rod drive (CRD) piston; (2) containment pressure acting on the CRD or CRD piston; and (3) the SL-1 accident.
The affidavit of Mr.
Peterson examines each item in considerable detail. 183
First, the Peterson affidavit describes in detail why it is physically impossible for the SCRAM discharge volume pressure to act on the CRD or CRD piston.
The affidavit also demonstrates that containment pressure likewise cannot add any force to system pressure forces accounted for in the ejection speed calculations.
Most importantly, the Peterson affidavit describes the exacting nature of the calculations performed to determine the rod speeds of those ejections which are theoretically possible, even though probabilistically very remote.
The calculated withdrawal speeds are dependent on known physical quantities such as distance, hydraulic loss, conservation of momentum.
Under the most conservative approach, and assuming the most adverse circumstances, the worst rod ejection event can produce a withdrawal speed of only 2 feet per second.
The rod drop accident analysis conservatively uses 5 feet per second as a rod withdrawal speed.
Hence, the rod drop analysis bounds consideration of rod ejection accidents.
Finally, Intervenor's reference to the SL-1 accident is not relevant to this contention.
The SL-1 reactor was totally dissimilar to a BWR and the accident which occurred there could not be repeated at ACNGS.
There is no genuine issue of material fact to be tried here, and Applicant is entitled to summary disposition on this contention as a matter of law. l 184 l
-.