O NINE MILE POINT NUCLEAR STATION WASTE HANDLING PROCEDURE PROCEDudE NO. N1-WHP-11 PROCESS CONTROL PROCEDURE FOR INFORMATION ONLY DATE'AND INITIALS APPROVALS SIGNATURES REVISION 0 REVISION 1 REVISION 2 Radwaste Operations p, p Coordinator C. A. Gerber h,

./1/ 31 C ff Radiochemistry 6 Radiation Protection Supervisor 4-- / -f/

J. N. Duell 1"W[ad J@

rag s

t Operations Supervisor V-/- Fi R. B. Abbott kh M

l l

Station Superintendent l

NMPNS j

T. W. Roman

  • /

/

' f()

f) / r General Superintendent Nuclear Generation Chairman of S.0.R.C.

l T. J. Perkins N NLhkQ M }#

I 1

Quality Assurance Concurrence l

Quality Assurance Manager M4/f/

W. M. Bryant

j. M M MdrA_

~ /

V

/

Summary of Pages Revision 0, dated March 1981, consists of pages 1 and 2.

I I

NIAGARA MOHAWK POWER CORPORATION l

THIS PROCEDURE NOT TO BE l

USED AFTER April 1983, 8208160042 810417 SUBJECT TO PERIODIC REVIEW.

PDR ADOCK 05000220 Q

PDR

N1-WHP-11 JD (j,

PROCESS CONTROL PROCEDURE 1.0 PURPOSE AND SCOPE The purpose of this procedure is to provide support to the pro-cess control program for satisfactory solidification of radio-active liquid waste by Chem-Nuclear Services, Inc. (CNSI) at the Nine Mile Point Unit 1 Nuclear Facility.

Included herein are references, prerequisites, required radiation surveys, documents, permits, instructions, and a copy of the CNSI Operating Procedure for Process Control of Solidification.

2.0 TECHNICAL SPECIFICATION REQUIREMENTS None 3.0 REGULATORY REQUIREMENTS Refer to:

Chem-Nuclear Systems, Inc.

Operating Procedure for the CNSI Process Control Program at the Nine Mile Point Nuclear Facility O

4.0 PREREQUISITES 4.1 RWP for the CNSI Solidification Operation inclusive of the process control sampling operation.

4.2 Dosimetry issuance to CNSI Operator.

4.3 Cask Loading Procedure N1-WHP-4.

4.4 Concentrator Analysis Data Sheet completed.

l 4.5 Tag "Do Not Operate" Concentrated Waste Tank transfer ralve

control during solidification operation.

(g N1-WHP-11

-1 March 1981 V

i

5.0 PROCEDURE FOR REQUIRED SUPPORT OF THE CNSI PROCESS CONTROL PROGRAM DURING SOLIDIFICATION 5.1 Operational Functions 5.1.1 Perform necessary service hookups such as 480 Volt 70 Amp electrical, 100 psi 1 20 plant service air and service water.

5.1.2 Perform required valve lineups for the solidification process.

5.1.3 Provide the CNSI Operator with the Concentrator Analysis Data Sheet.

NOTE:

Procedure N1-WHP-11 is intended to provide assistance to assure continuity of work; however, it is recognized that procedures cannot anticipate provisions for all eventualities.

If questions arise due to changing conditions or unforeseen problems the Rad Waste Coor-dinator should be consulted.

O f

l l

t I

I I

1 l

N1-WHP-11

-2 March 1981 l