O NINE MILE POINT NUCLEAR STATION WASTE HANDLING PROCEDURE PROCEDudE NO. N1-WHP-11 PROCESS CONTROL PROCEDURE FOR INFORMATION ONLY DATE'AND INITIALS APPROVALS SIGNATURES REVISION 0 REVISION 1 REVISION 2 Radwaste Operations p, p Coordinator C. A. Gerber h,
./1/ 31 C ff Radiochemistry 6 Radiation Protection Supervisor 4-- / -f/
J. N. Duell 1"W[ad J@
rag s
t Operations Supervisor V-/- Fi R. B. Abbott kh M
l l
Station Superintendent l
NMPNS j
T. W. Roman
- /
/
' f()
f) / r General Superintendent Nuclear Generation Chairman of S.0.R.C.
l T. J. Perkins N NLhkQ M }#
I 1
Quality Assurance Concurrence l
Quality Assurance Manager M4/f/
W. M. Bryant
- j. M M MdrA_
~ /
V
/
Summary of Pages Revision 0, dated March 1981, consists of pages 1 and 2.
I I
NIAGARA MOHAWK POWER CORPORATION l
THIS PROCEDURE NOT TO BE l
USED AFTER April 1983, 8208160042 810417 SUBJECT TO PERIODIC REVIEW.
PDR ADOCK 05000220 Q
N1-WHP-11 JD (j,
PROCESS CONTROL PROCEDURE 1.0 PURPOSE AND SCOPE The purpose of this procedure is to provide support to the pro-cess control program for satisfactory solidification of radio-active liquid waste by Chem-Nuclear Services, Inc. (CNSI) at the Nine Mile Point Unit 1 Nuclear Facility.
Included herein are references, prerequisites, required radiation surveys, documents, permits, instructions, and a copy of the CNSI Operating Procedure for Process Control of Solidification.
2.0 TECHNICAL SPECIFICATION REQUIREMENTS None 3.0 REGULATORY REQUIREMENTS Refer to:
Chem-Nuclear Systems, Inc.
Operating Procedure for the CNSI Process Control Program at the Nine Mile Point Nuclear Facility O
4.0 PREREQUISITES 4.1 RWP for the CNSI Solidification Operation inclusive of the process control sampling operation.
4.2 Dosimetry issuance to CNSI Operator.
4.3 Cask Loading Procedure N1-WHP-4.
4.4 Concentrator Analysis Data Sheet completed.
l 4.5 Tag "Do Not Operate" Concentrated Waste Tank transfer ralve
control during solidification operation.
(g N1-WHP-11
-1 March 1981 V
i
5.0 PROCEDURE FOR REQUIRED SUPPORT OF THE CNSI PROCESS CONTROL PROGRAM DURING SOLIDIFICATION 5.1 Operational Functions 5.1.1 Perform necessary service hookups such as 480 Volt 70 Amp electrical, 100 psi 1 20 plant service air and service water.
5.1.2 Perform required valve lineups for the solidification process.
5.1.3 Provide the CNSI Operator with the Concentrator Analysis Data Sheet.
NOTE:
Procedure N1-WHP-11 is intended to provide assistance to assure continuity of work; however, it is recognized that procedures cannot anticipate provisions for all eventualities.
If questions arise due to changing conditions or unforeseen problems the Rad Waste Coor-dinator should be consulted.
O f
l l
t I
I I
1 l
N1-WHP-11
-2 March 1981 l
l
__