Waste Handling Procedure N1-WHP-9, Solidification Procedure
ML20062H406
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 04/06/1981
From:
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML20062H387 List:
References
N1-WHP-9, NUDOCS 8208160039
Download: ML20062H406 (3)


Text

-

1. . . _ - _ _ _ _

O NINE MILE POLNT NUCLEAR STATION .

WASTE HANDLING PROCEDURE PROCEDURE NO. N1-WHP-9 SOLIDIFICATION PROCEDURE FOR INFORMATION ONLY DATE AND INITIALS APPROVALS SIGNATURES REVISION 0 REVISION 1 REVISION 2 P.adwaste Operations Cordinator 4'-/ J C. A. Gerber Q [ /. ./ Uh/, ls OH Radiochemistry 6 Radiation Protection Supervisor 4-/'I/

J. N. Duell t*%/Is /w &#

/~

p)

( '/ /- f(

OperationsSupervisor[hdII R. B. Abbott [d b Station Superintende NMPNS T. W. Roman (d Asc -

-#1 ['/8/

// /'

General Superintendent Nuclear Generation gg Chairman of S.O.R.C. If ha M T. J. Perkins i$

Quality Assurance Conc rrence Quality Assurance Manager W. M. Bryant MMAwM '< pA

/ 0 Summary of Pages Revision 0, dated March 1981, consists of pages 1 and 2.

NIAGARA M0!iAWK POWER CORPORATION THIS PROCEDURE NOT TO BE USED AFTER April 1983, 8208160039 810417 SUBJECT TO PERIODIC REVIEW.

PDR ADOCK 05000220 G PDR

N1-WHP-9 SOLIDIFICATION PROCEDURE f-)

s- ,

1.0 PURPOSE AND SCOPE The purpose of this procedure is to identify the steps required to provide support for the liquid waste solidification operation by Chem Nuclear Services, Inc. at the Nine Mile Point Unit 1 Nuclear Facility. Included herein are references, prerequisites, required radiation surveys, documents, permits and instructions and a copy of the CNSI Operating Procedures for Solidification.

2.0 TECHNICAL SPECIFICATION REQUIREMENTS None 3.0 REGULATORY REQUIREMENTS 3.1 Refer to: Chem-Nuclear Systems, Inc. Operating Procedure for the CNSI Mobile Solidification System at Nine Mile Point Nuclear Facility (copy attached).

3.2 Chem-Nuclear Systems, Inc. Materials License No. 46-13536-01 Persuant to 10CFR30, 10CFR40 and 10CFR70.

4.0 PREREQUISITES 4.1 Schedule and arrival of CNSI Mobile Solidification Unit.

4.2 Cask located in Rad Waste Building and ready to receive waste according to the Cask Handling Procedure N1-WHP-3 and the Cask Loading Procedure N1-WHP-4.

l 4.3 RWP for the CNSI Solidification Operation 4.4 Place Do Not Operate tag on concentrator transfer control valve while solidification process is in progress.

4.5 Dosimeter issuance to CNSI operator.

4.6 RWP for Rad Waste Building Operation.

S.0 PROCEDURE FOR REQUIRED SUPPORT OF THE CNSI SOLIDIFICATION PROCESS 5.1 Operational Functions 5.1.1 Perform necessary service hookups such as 480 volt 70 amp electrical, 100 psi + 20 plant service air, and service water.

g-)g

\_

N1-WHP-9 -1 March 1981 l

i.

5.1.2 Perform required valving and valve lineups as necessary during es the solidification process according to the Cask Load Procedure N1-WHP-4.

NOTE: Procedure N1-WHP-9 is intended to provide assistance to assure continuity of work; however, it is recognized that procedures cannot anticipate provisions for all eventualities. If questions arise due to changing

, conditions or unforeseen problems the Rad Waste Coor-4 dinator should be consulted.

i a

1 i

4 i

O l-l t

O N1-WHP-9 -2 March 1981 n,--