Forwards IE Inspec Rept 50-318/78-22 on 780925-29 & 1017-18 During Which No Items of Noncompliance Were Noted
ML20062G460
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 11/09/1978
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20062G461 List:
References
NUDOCS 7812280313
Download: ML20062G460 (2)


See also: IR 05000318/1978022

Text

_

~~ '

___

-

_ _ _.

W

q

,

,

.

g" ",'o

-

u

UNITED STATES

., s

-,g

NUCLEAR REGULATORY COMMISSION

[

P

S

REGION 1

$,

f

$31 PARK AVENUE

0,

KING OF PRUSSI A. PENNSYLVANI A 19406

%,

p'4

'

+...+

Docket No. 50-318

HOV 9 IMS

Baltimore Gas and Electric Company

ATTN: Mr. A. E. Lundvall, Jr.

Vice President, Supply

P. O. Box 1475

Baltimore, Maryland 21203

_ .. G%tlemen:

Sub,iect:

Inspection 78-22

i

('

This refers to the inspection conducted by Mr. R. A. McBrearty of this

office on September 25-29, 1978 and October 17-18, 1978 at Calvert

'

Cliffs Nuclear Power Plant, Unit 2, Lusby, Maryland of activities author-

'

ized by NRC License No. DPR-69 and to the discussions of our findings

held by Mr. McBrearty with Mr. R. Douglas at the conclusion of thec.'

inspection.

-

'

Areas examined during this inspection are described in the Office of

.

'

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

,

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

(

Ifi accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your con-

'

tractor) believe to be proprietary, it is necessary that you make a

written application within 20 days to this office to withhold such

information from public disclosure. Any such application must be

accompanied by an affidavit executed by the owner of the information,

which identifies the document or part sought to be withheld, and which

contains a statement of reasons which addresses with specificity the

items which will be considered by the Commission as listed in subpara-

graph (b) (4) of Section 2.790. The information sought to be withheld

shall be incorporated as far as possible into a separate part of the

affidavit.

If we do not hear from you in this regard within the speci-

fled period, the report will be placed in the Public Document Room.

78122803l3

b

i

i

l

-

-. -

.

.

-

_

_

.

.

-

__

. ..

.

.

,

,.

.

.

Baltimore Gas and Electric Company 2

NOV 9 WB

No reply to this letter is required; however, should you have any ques-

,

tions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely.

,

. -

7

\\

'l

W

,

Robert T. Carlson, Chief

Reactor Construction and Engineering

,

Support Branch

-

-

~

Office of Inspection and Enforcement Inspection ~

Enclosure:

()

Report Number 50-318/78-22

cc w/ enc 1:

'

l

R. M. Douglass, Manager, Quality Assurance

i

L. R. Russell, Chief Engineer

W. Gibson, Supervisor Operational QA

c

,

%

,k

N

(

.

i' .

-

l

'

\\

,

l

-

)

,

\\

I

\\

k

v

s.

,

.

,

'

',

-

5

, i

'

~,

_

-

[-

,

+

5

h

4 %

v

u,

,