e OPERATING DATA REPORT 30-321 DOCKET NO.
DATE 12 78 i
i COSIPLETED 11Y S-Ulleon TEl.EPl!ONE 912-3o7-7781 i
OPERATING STATUS 7
Hatch - 1 Notes I. Unit Name:
- 2. Reporting Period:
Nove.ber
- 3. Licensed Thermal Power a\\lbt):
2436
- 4. Nameplate Rating (Gross MWel:
809 786
- 5. Design Electrical RatingINet 5!We):
- 6. Maximum Dependable Capacity (Gross 5!We):
748.6 71'
- 7. $!aximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Give Reasons:
<s i
t
- 9. Power Lesel To Which Restricted.If Any (Net S!We):
- 10. Reasons For Restrictions,if Any:
4 r
This Month Yr..to.Date Cumulatise 720 8015 36961 II. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 720 5914.6 27743.4
- 13. Reactor Reserve Shutdown Hours 0
0 0
l
- 14. Hours Generator On-Line 698.7 5702'.3 25327.1
[
- 15. Unit Resene Shutdown Hours 0
0 0
t
- 16. Gross Thermal Energy Generated (MWH) 1509535 12114934 48047756
- 17. Gross Electrical Energy Generated ('lWH) 496420 3984280 15541141
' ~
- 18. Net Electrical Energy Generated (MWH) 474703 37903 F 147849 T 9#'O
- 19. Unit Senice Factor 71 1
- U*0
- 20. Unit Availability Factor 97.0 71.1 70.8
- 21. Unit Capacity Factor (Using MDC Net) 92.0 66.0 57.0 l
e
- 22. Unit Capacity Factor (Using DER Net t 83.9 60.2 57.0
- 23. Unit Forced Outage Rate 3.0 18.6 18.3
- 24. Shutdowns Scheduled Over Nest f-C b tT,5pe. Date.and Duration of Each e:
Maintenance Outage:
3-;= 1; 6 Weeks 6
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Umts in Test Status (Prior to Commercial Operationi:
Forecast Achiesed 1
g INITI \\L C!llTICALITY t
g INITI \\ L Ell-CT RICITY g
COMM ERCIA L OPER A TION
{
l 7812150G.9([
l' ew7i
AVER ACE DAILY UNIT POWER LEVEL 1
]
DOCKET NO, -- 50-321 i
Hatch-1 UNIT 12-5-78 DATE l
CO31PLETED BY i k'ilson TELEPHONE 912-367-7781 MONTil Noveeber DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL
(.\\f We. Net) iSfWe-Net) y 725 725 g7
't 2
71?
Is 708 3
684 726 39 4
-5 724 20 5
448 723 21 6
655 724 7
645 724 33 g
697 719 24 9
723 414 25 10 717 577 26 717 638 11 37 12 721 695
,8 13 722 621 29 14 723 709 30 j
15 722 3,
16 725 INSITIL'CTIONS Or this tiirmat. list the average Jaily unit power level in.\\lwe. Net for each day in the reportme month. Compute :o t e nearest whole megawatt.
(9/77i
s N
/
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-321 UNIT NASIE 11atch - 1 DATE 32-5-78 REPORT MON Til November COMPLETED ity S. tJitson TELEPIIONE
')t'-167 7791 e.
E c
.! E
}g5M Licensee E r,
{4
'Cause & Connective No.
D.a t e g
3g Event 3,3 a3 Atenen to 5
<5:
Report 8 mU
!O Prevent Recurrence
~t v
Q 78-22 11-4-78 F
21.3 A
1 EB TRANSF Arcing of Center Bushing of Main Transformer 78-23 11-25-78 F
0 A
4 CB PUMPXX MG Set Brush Replacement And On Line Sequence Exchange RC CONROD On I,ine Sequence Exchange 78-24 11-29-78 S
O 31 4
RC CONROD Rod Pattern Change 1
I 2
3 4
F: roeced Reason:
hiethod:
Exhibit C. Instructions S: SiheilutcJ ATeguipment Failure (Explain) l blanual for Pseparation of Data 11 hiaintenance of Test 2-Manual Scram.
Entr> Sheets fin 1.wensee C Reluchng
- 3. Automatic Scram.
Esent Repint (LI Rn File INURI G.
D Rcgulatoiy Hesisiction 4-Other (Explain) 0166l I~-Opes.sion liaining & license Esamina: ion 6
l'.A.lminhtsative 5
G Operanonal Estos IExplain)
Exintnt I - Same Source 19/77)
Il Other llisplam)
I i
we
_ ~.
1 E
l s,
NARRATIVE REPORT UNIT I i
i!
- l1i Nov. 1 Preconditioning I!
l t ?
t Nov. 4 Off line for transformer bushing replacement 0016 l'I CST e
Nov. 6 Liminted by MFLPD Nov. 7 Rod adjustment 202S CST i
4 I
Nov. 9 Limited by MFLPb I !
I' Nov. 24 Load reduction for MG set brush replacement and g'
rod sequence exchange 2200 CST I
Nov. 28 Rod pattern exchange 2200 CST Nov. 29 Preconditioning t
i f
i t
x I
L i
4 i
f l
l i
l I
f l Y l,
i
._ ~
8 t
i e
There was no single release of radioac tivity or single radiation exposure which accounts for more than 10 percent of the allowable annual values during the month of September.
- f f-e h
O
.l i
v, i
i HATCH 1 SAFETY - RELATED MAINTENANCE REOUESTS l
TO BE REPORTED FOR NOVEMBER 1978 i
1 i
r NUMBER DATE COMPLETED DESCRIPTION I
76-5892 11-29-78 Replace existing main flange nuts l
and studs per DCR-76-111 L
76-5949 10-23-78 Repair leaking blowdown valve j
B21-N015C 77-1020 11-26-78 Remove brace from tubing tray f
Recire lube oil cooling water valve 78 408 11-22-78 Reroute conduit and cable to valves l
P33-F006 & P33-F014 to correct control room switch.
~
78-977 11-27-78 Move H2 analyzcal gas bottles to 130 ele. per DCR-78 40 78-2870 11-2-78 Repair main steam line monitor D 78-2912 11-1-78 Perform calibration of all LCO instruments covered by ENP 1-832 78-3035 10-31-78 Install automatic lock and 2
emergency release on doors R59 and R59A per DCR-77-194 78-3036 11-3-78 Install automatic lock and 2
emergency release on doors R60 and R60A per DCE-77-194 78-3037 10-31-78 Install automatic lock and 2
emergency releases on doors R1 and R2 per DCR-77-194 78-3038 11-3-78 Install automatic lock and 2
emergency releases on doors R30A and R308 per DCR-77-194 78-3039 10-31-78 Install automatic lock and 2
emergency releases en doors R62 &
R62A per DCR-77-194
^
78-3205 11-3-78 Perform yearly inspection of transformer e
's, s
HATCH 1 SAFETY - RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR NOVEMBER 1978 NUMBEP DATE COMPLETED DESCRIPTION 78-3247 11-30-78 calibrate the D/G jacket coolant Hi 5
temp switch 78-3298 10-23-78 Repair audible alarm 1D21-R754 78-3362 11-27-78 Repair.B Gemac level gauge 78-3470 11-26-78 Install brace to tubing tray on Recire lube oil. cooling water valve 78-3537 11-2-78 Replace indicating lights of TIP drive control machine 78-3580 11-21-78 Repair packing leak on E41-F036 78-3581 11-20-78 Repair packing leak on E41-F037 78-3596 10-31-78 Trim bracket on door R54 per
~
DCR-77-194 78-3623 10-30-78 Repair filter paper take up reel 1Dp1-R755.
78-3625 11-13-78 Repair varible pot on Recombiner vent Rad monitor 78-3626 11-2-78 Adjust Hi alarm set point on Reactor Bldg vent Rad monitor
(. >
78-3638 11-21-78 Inspect and repair the vacuum pump on the Barometric condenser 78-3654 11-2-78 Calibrate the RHR service water pump pnessure indicator 78-3656 11-2-78 Reduce operating voltage from 100V to 50V on LPRM 36-37 A, B, C, & D 78-3657 11-2-78 calibrate LPRM 1C51-K605 78-3662 11-16-78 Perform P/M per HNP-1-6310 78-3699 10-30-78 Change setpoints as per H'IP-7450 i
7
w S
HATCH 1 SAFETY - REATED MAINTE!!ANCE REQUESTS TO BE REPORTED FOR NOVEMBER 1978 i
i NUMBER DATE COMPLETED DESCRIPTION 78-3707 11-3-78 Repair leak on Recire drain line to main cond.
78-3708 11-3-78 Repair leak on Recire drain line to main cond.
l 78-3710 11-21-78 Repair leaking level switch vent valves.
78-3730 11-2-78 Repair packing leak on inlet drain pot manual isolation valve 78-3731 11-13-78 Change setpoints of Recom51ner Bldg
,s vent monitor A&B per HNP-7450 78-3733 10-30-78 Grease bearing on torus /drywell delta P compressor pumps 78-3736 11-7-78 Replace TIP drive control machines indicating lights 78-3749 11-3-78 Repair motor drive temp recorder 78-3760 11-2-78 Replace clutch on TIP drive mechanism 78-3761 11-8-78 Grease motor bearing and check vibration as per HNP-6383 78-3767 11-8-78 Grease moton bearing and check
\\
vibration as per HNP-6385 78-3769 11-2-78 Clean CRD discharge filters and replace jacket 78-3770 11-2-78 Clean RBM "A" switch in control room 78-3771 11-2-78 Inspect RBM "B" alarm 78-3779 11 4-78 Repair alarm " Fuel oil Hi-Lo on tank water detection" 78-3782 11-2-78 Repair "B"
D/W torus H202 analyzer recorder l
l I
4
.f i
i !
HATCH 1 SAFETY - REl.ATED tdAI'ITENANCE RECUESTS TO BE REPORTED FOR NOVEMBER 1978
}l NUMBER DATE COMPLETED DESCRIPTION 78-3786 11-4-78 Repair scale on "B" seal water flow meter 78-3787 11-7-78 Install check valves in each constant air supply line going to 7
fuel pool gate seals l
78-3794 11-6-78 Repair black p en on Reactor
'l Building vent Rad monitor 78-3804 11-9-78 Inspect Diesel Gen. 1 blower motors I
t r-78-3805 11-9-78 Inspect Diesel Gen. I blower motors 78-3806 11-9-78 Inspect jacket coolant level to alarm 78-3807 11-9-78 Inspect alarm 1-H11-P652 78-3808 11-9-78 Lighten belts on 1C station service I
air compressor j
78-3817 11-10-78 Repair Rx Bldg vent RAD monitor sample pump r
78-3818 11-13-78 Change setpoints of Rx Bldg vent rad monitor per HNP-7450 78-3821 11-9-78 Replace valve on 1C11-F111 78-3822 11-13-78 Repair pretreatment sample pump leak 78-3826 11-8-78 Repair RHR spray flow gauge 78-3828 11-15-78 Inspect & re pai:- pressure control valve 78-38?0 11-9-78 Replace CRD accumulator isolation valve 78-3898 11-14-78 Perform P/M on Control Bldg HVAC system 78-3843 11-9-78 Prepair RBM channel "A"
l r,
I HATCH 1 SAFETY - REATED t'.AINTENANCE REQUESTS TO BE REPORTED FOR NOVEMBER 1978
- l l
NUMBER DATE C0!!PLETED DESCRIPTION 4
78-3868 11-14-78 Repair leaking accumulator valve
)
78-3869 11-17-78 Destroy 2 primer chamber assemblies 78-3877 11-27-78 Repair loose input connection on Rx water demin monitor 78-3878 11-20-78 calibrate head spray pressure transmitter 7^-3885 11-19-78 Replace alarm circuit board on recombiner bldg vent monitor B O
78-3886 11-27-78 Replace lower motor Diesel Gen. 1B 78-3888 11-20-78 Replace bulk core drums with solid state device 78-3889 11-29-78 Replace contact 3/3T N6253 78-3890 11-15-78 Perfcrm F. T. on time delay relays 78-3894 11-13-78 Run saturation curves for LPRM detectors 78-3900 11-20-78 Replace logic board on TIP machine B 78-3925 11-18-78 Test alarm 1H11-P650 78-3926 11-22-78 Repair particulate monitor recorder
-N, 78-3929 11-18-78 Repair "LPRM Upscale" alarm 78-3931 11-20-78 calibrate Rx b1dg vent Rad monitor 78-3942 11-18-78 Repair H11-P650 78-3954 11-19-78 Repair air shock on hopper B 78-3966 11-19-78 Repair LDT A discharge pressure indica tor 78-3968 11-22-78 Perform P/M on accumulate "A"
per HNP-1-6310 4
~
l l
HATCH 1 SAFFTY - RELATED MAINTENANCE REQUESTS TO BE REFORTED FOR NOVEMBER 1978 l
I
)
1 i
NUMBER DATE COMPLETED DESCRIPTION f
78-3969 11-22-78 Perform P/M on accumulate "A"
per j
ICIP-1-6310 t
78-3970 11-19-78 Repair Unit I RW centrifuge "A" log I
78-3971 11-19-78 check calibration or shell pressure
{
indicator iI 78-3983 11-22-78 check calibration of main stack l
[1cu recorder s
78-4002 11-27-78 Replace nuts on 1ARPS M-G set wiring box v
78-4010 11-21-78 Replace annunciator cords on l
1H11-603 i
78-4035 11-21-78 Replace annunciator cord on 1H11-P650 78 4038 11-21-78 Replace pen on D/W torus delta P indicator 78-4040 11-21-78 Repair Unit 1 process cocouter L
78-4072 11-27-78 Lighten clutch on TIP drive unit D i
78-4101 11-29-78 Adjust limit switch on 1E51-F005
(