Forwards IE Investigation Rept 50-325/78-29 & 50-324/78-29 on 781023-25 & Notice of Violation
ML20062E964
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 11/07/1978
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML20062E948 List:
References
NUDOCS 7812130300
Download: ML20062E964 (2)


See also: IR 05000324/1978029

Text

'

'

. .

,

% UNITED STATES

[e' 88C o, NUCLE aft REGULATORY COMMISSION

,- ( R EGloN 11

- t 101 M ARIETT A sTRE ET. N W

o  ! ATL ANT A. GEORGI A 303o3

[

....."

% -

In Reply Refer To: NOV 7 1978

II:MVA

50-325/78-29

50-324/78-29

.

Carolina Power and Light Company

ATTN: Mr. J. A. Jones

Executive Vice President

Engineering, Construction

and Operation

336 Fayetteville Street

Raleigh, North Carolina 27602

Gentlemen:

This refers to the investigation conducted by Mr. M. V. Annast of this

office on October 23-25, 1978, of activities authorized by NRC Operating

License Nos. DPR-71 and DPR-62 for the Brunswick Steam Electric Plant, and

to the discussion of our findings held with Mr. A. C. Tolltson, Jr., at the

conclusion of the investigation.

Areas examined during the investigation and our findings are discussed in

the enclosed investigation report. Within these areas, the investigation

consisted of selective examination of records, interviews with personnel,

and field inspection.

During the investigation, it was found that certain activities under your

license appear to be in noncompliance with 57C requirements. This item and

references to pertinent requirements are listed in the Notice of Violation

enclosed herewith as Appendix A. This notice is sent to you pursuant to

the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2

Title 10, Code of Federal Regulations. Section 2.201 requires you to

submit to this office, within 20 days of your receipt of this notice, a

written statement or explanation in reply including: (1) corrective steps

which have been taken by you, and the results achieved; (2) corrective

steps which onll be taken to avoid further noncompliance; and (3) the date

when f ulI comp! s ance wilI be achieved.

In addition to the need for corr-ctive action regarding this specific item

of noncompliance, we are concerned about the administration of the security

force training program discussed ta the enclosed report. Consequently. in

your reply, please describe those actions taken or planned whic h will

improve your management control of the security force training and testing

program.

78121303co

. . .- _ . . _. - - - . _ - . . . . _ ..

.

t

,

.

. .

,

J

l

Carolina Power and 1.ight Company -2- NOV "/ 1978

In accordance with Section 2.790 of the NRC's " Rules of Practice" Part 2,

4

Title 10, Code of Federal Regulations, a copy of this letter will be placed

in the NRC's Public Document Room. If this letter santains any informat:en ,

that you believe to be proprietary, it is necessary t hat you make a writter. t

application within 20 days to this office to withhold such information from

public disclosure. Any such application must include a full statement of -

.

the reasons on the basis of which it is claimed that the informat ion is

proprietary, and should be prepared so that proprietary information identi-

fied in the application is contained in a separate part of the docu:nent.

If we do not hear from you in this regard within the specified period, the

letter will be placed in the Public Documer.t Room. ,

Should you have any questions concerning this letter, we will be glad to

discuss them with you. l

Sincerely,  ;

'

(C hr -

James P. O'Reilly

Director

7__

Enclosures:

1. Appendix A, Notice of Viola

2. Investigation Report Nos. 50-325/78-29

. and 50-324/78-29

cc w/encls:

Mr. A. C. Tullison, Jr.,

Plant-Manager

Box 458

Southport, North Carolina 2S461

>

>