ML20062E939
| ML20062E939 | |
| Person / Time | |
|---|---|
| Site: | Cherokee |
| Issue date: | 11/24/1978 |
| From: | Murhpy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Dail L DUKE POWER CO. |
| Shared Package | |
| ML20062E936 | List: |
| References | |
| NUDOCS 7812130289 | |
| Download: ML20062E939 (2) | |
See also: IR 05000491/1978008
Text
w
.
~ ~ - - - - -
, ~ .
. - - . ~
, .
. _ , . _ .
.
- ~ -
6
,
,
,
,
.
g* "8%g
UNITED STATES
e
NUCLEAR REGULATORY COMMISSION
,og
g
w
g
REGloN il
E
101 MARIETTA STREET, N.W.
-
-
f
ATLANTA, GEORGIA 30303
%,
4
- '
November 24, 1978
<
j
In Reply Refer To:
RII:JKR
'
!
50-491/78-8
i
50-492/78-8
I
50-493/78-8
1
l
1
Duke Power Company
Attn:
Mr. L. C. Dail, Vice President
,
,
Design Engineering
'
!
(~
P. O. Box 33189
!
\\ -
Charlotte, North Carolina 28242
Gentlemen:
This refers to the inspection conducted by J. K. Rausch of this office on
October 30 - November 2, 1978, of activities authorized by NRC Construction
Permit Nos. CPPR-167, CPPR-168 and 'CPPR-169 for the Cherokee Nuclear Station
- ecility, and to the discussion of our findings held with C. B. Aycock at
the conclusion of the inspection.
.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
of setEetive examinations of procedures and representative records, inter-
views with personnel, and observations by the inspectors.
We have examined actions you have taken with regald to previously identi-
(,j
fied enforcement matters. These are discussed in tSe enclosed inspection
3
report.
,
During the inspection, it was found that certain activities under your
'
license appear to be in noncompliance with NRC requirements. These items
and references to pertinent requirements are listed in the Notice of
l
Violation enclosed herewith as Appendix A.
This notice is sent to you
i
pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations. Section 2.201 requires you
to submit to this office, within 20 days of your receipt of this notice, a
written statement or explanation in reply including:
(1) corrective steps
,
!
which have been taken by you and the results achieved; (2) corrective steps
!
which will be taken to avoid further noncompliance; and (3) the date when
I
full compliance will be achieved.
,
.
7812130A59
'
. ..
_
_
.
,
_ _ _ _
_
_ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
-____
..--
. ..
. .. . . . .
'
---
.
.
.. . - . . - . . . _ . . . _ _ . _ _
. _ .
.
<
'
'
,
.
Duke Power Company
-2-
November 24, 1978
'
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
t
Title 10, Code of Federal Regulations, a copy of this Letter and the
enclosed inspection report wiLL be placed in the NRC's Public Document
i
Room. If this report contains any information that you (or your contractor)
'
believe to be proprietary, it is necessary that you make a written applica-
}
tion within 20 days to this office to withhold such information from public
8
disclosure. Any such application must include a full statement of the
,
f
reasons on the basis of which it is claimed that the information is pro-
prietary,,and should be prepared so that proprietary information identi-
e.
fied in the application is contained in a separate part of the document.
If we do not hear from you in this regard within the specified period,
i
'
the report wiLL be placed in the Public Document Room.
f' ,
Should you have any questions concerning this letter, we will be glad to
-
discuss them with you.
Sincerely,
f
- -__ '
C. E. Murphy, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
i
(1) Appendix A, Notice of Violation
(2) Inspection Report Nos. 50-491/78-8,
50-492/78-8 and 50-493/78-8
.
cc w/encts:
(_/
Mr. J. T. Moore, Project Manager
Cherokee Nuclear Station
.
'
P. O. Box 422
Gaffney, South Carolina 29340
F
&
>
.
i
!
l
!
!
.
+
.
.
I
I
,
_
_ _
__
_
. . , .
.
_ _ _ _ _ _ _ _ _ _ - _