Forwards IE Inspec Repts 50-491/78-08, 50-492/78-08 & 50-493/78-08 on 781030-1102 & Notice of Violation
ML20062E939
Person / Time
Site: Cherokee  Duke Energy icon.png
Issue date: 11/24/1978
From: Murhpy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML20062E936 List:
References
NUDOCS 7812130289
Download: ML20062E939 (2)


See also: IR 05000491/1978008

Text

w

.

~ ~ - - - - -

, ~ .

. - - . ~

, .

. _ , . _ .

.

~ -

6

,

,

,

,

.

g* "8%g

UNITED STATES

e

NUCLEAR REGULATORY COMMISSION

,og

g

w

g

REGloN il

E

101 MARIETTA STREET, N.W.

-

-

f

ATLANTA, GEORGIA 30303

%,

4

      • '

November 24, 1978

<

j

In Reply Refer To:

RII:JKR

'

!

50-491/78-8

i

50-492/78-8

I

50-493/78-8

1

l

1

Duke Power Company

Attn:

Mr. L. C. Dail, Vice President

,

,

Design Engineering

'

!

(~

P. O. Box 33189

!

\\ -

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by J. K. Rausch of this office on

October 30 - November 2, 1978, of activities authorized by NRC Construction

Permit Nos. CPPR-167, CPPR-168 and 'CPPR-169 for the Cherokee Nuclear Station

  • ecility, and to the discussion of our findings held with C. B. Aycock at

the conclusion of the inspection.

.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted

of setEetive examinations of procedures and representative records, inter-

views with personnel, and observations by the inspectors.

We have examined actions you have taken with regald to previously identi-

(,j

fied enforcement matters. These are discussed in tSe enclosed inspection

3

report.

,

During the inspection, it was found that certain activities under your

'

license appear to be in noncompliance with NRC requirements. These items

and references to pertinent requirements are listed in the Notice of

l

Violation enclosed herewith as Appendix A.

This notice is sent to you

i

pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations. Section 2.201 requires you

to submit to this office, within 20 days of your receipt of this notice, a

written statement or explanation in reply including:

(1) corrective steps

,

!

which have been taken by you and the results achieved; (2) corrective steps

!

which will be taken to avoid further noncompliance; and (3) the date when

I

full compliance will be achieved.

,

.

7812130A59

'

. ..

_

_

.

,

_ _ _ _

_

_ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

-____

..--

. ..

. .. . . . .

'

---

.

.

.. . - . . - . . . _ . . . _ _ . _ _

. _ .

.

<

'

'

,

.

Duke Power Company

-2-

November 24, 1978

'

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

t

Title 10, Code of Federal Regulations, a copy of this Letter and the

enclosed inspection report wiLL be placed in the NRC's Public Document

i

Room. If this report contains any information that you (or your contractor)

'

believe to be proprietary, it is necessary that you make a written applica-

}

tion within 20 days to this office to withhold such information from public

8

disclosure. Any such application must include a full statement of the

,

f

reasons on the basis of which it is claimed that the information is pro-

prietary,,and should be prepared so that proprietary information identi-

e.

fied in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period,

i

'

the report wiLL be placed in the Public Document Room.

f' ,

Should you have any questions concerning this letter, we will be glad to

-

discuss them with you.

Sincerely,

f

-__ '

C. E. Murphy, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

i

(1) Appendix A, Notice of Violation

(2) Inspection Report Nos. 50-491/78-8,

50-492/78-8 and 50-493/78-8

.

cc w/encts:

(_/

Mr. J. T. Moore, Project Manager

Cherokee Nuclear Station

.

'

P. O. Box 422

Gaffney, South Carolina 29340