Category:CORRESPONDENCE-LETTERS
MONTHYEARML20195C5131999-05-28028 May 1999 Forwards Revs to Sections 3.9 & 5.6 of Its,Based on Resolution Telcons Held Between NRC Staff & Util on 990526 & 27 ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20132A8831985-09-12012 September 1985 Responds to 830921 Request That CPPR-167,CPPR-168 & CPPR-169 Be Deleted.Stabilization Plan Has No Significant Environ Impact.Dockets Changed to Canceled Status ML20098G6271984-09-27027 September 1984 Forwards Responses to 840617 Request for Addl Info in Order to Complete Review of Facility Site Stabilization Plan.W/Two Oversize Maps.Aperture Cards Available in PDR ML20095E3971984-08-16016 August 1984 Forwards Duke Power Co & North Carolina Municipal Power Agency 1 1983 Annual Repts LG-84-332, Forwards Most Recent Aerial Photographs of Site for Review of Stabilization Plan.W/O Encl1984-04-24024 April 1984 Forwards Most Recent Aerial Photographs of Site for Review of Stabilization Plan.W/O Encl ML20078C2031983-09-21021 September 1983 Requests Cancellation of CPPR-167,CPPR-168 & CPPR-169 Based on Current & Predicated Economic Conditions.Stabilization Plan Encl LG-83-314, Responds to NRC Requiring Detailed Analysis of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Analysis Will Not Be Submitted,Due to Indefinite Delay in Const of Facility1983-04-0707 April 1983 Responds to NRC Requiring Detailed Analysis of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Analysis Will Not Be Submitted,Due to Indefinite Delay in Const of Facility LG-83-163, Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 19831983-02-18018 February 1983 Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 1983 LG-83-049, Forwards Response to 821210 Request for Addl Info on IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). Monitoring Program for Clams to Be Established1983-01-17017 January 1983 Forwards Response to 821210 Request for Addl Info on IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). Monitoring Program for Clams to Be Established ML20063E6521982-08-24024 August 1982 Forwards Util & Nc Municipal Power Agency Annual Financial Repts for 1981 ML20062K3871982-05-20020 May 1982 Forwards First Quarter 1982 Yellow Book Updates Re Const Status ML20052F0901982-05-0404 May 1982 Informs That Addl Action Will Be Required in Order to Fully Comply W/Asme Code Requirements for Radiography of safe-end Welds.Discrepancy Will Be Resolved by re-radiographing Affected Welds ML20038D1361981-11-0303 November 1981 Responds to NRC 811014 Ltr Re Violations Noted in IE Insp Repts 50-491/81-03,50-492/81-03 & 50-493/81-03.Corrective Actions:Gas Cans Have Been Emptied & Placed in Motor Pool Storage Area ML20009D9001981-07-0808 July 1981 Responds to IE Bulletin 81-03 Re Blockage of Cooling Water to Safety Sys Components by Clams & Mussels.Provisions Will Be Made to Minimize Introduction of Clams Into Raw Water Sys.Fifteen Manhours Expended in Preparation of Bulletin NUREG-0694, Advises That Augmented Natural Circulation Training Should Be Performed.Descriptions of Natural Circulation Tests Should Be Included in Fsar.Detailed Test Procedures Must Be Submitted 60 Days Prior to Scheduled Test Performance1981-06-12012 June 1981 Advises That Augmented Natural Circulation Training Should Be Performed.Descriptions of Natural Circulation Tests Should Be Included in Fsar.Detailed Test Procedures Must Be Submitted 60 Days Prior to Scheduled Test Performance ML20004C2561981-05-28028 May 1981 Requests Authorization to Use ASME Code Cases 1481-2,1592-14 & 1644-8 in Fabrication of Primary Sys Components for Facilities ML19347D3491981-03-12012 March 1981 Responds to NRC 810223 Request for Addl Info Re Util Plans for Facilities.Completion of Cherokee 1 & 2 Has Been Indefinitely Delayed.Commercial Operating Dates for Cherokee 3 & Perkins 1,2 & 3 Have Not Been Determined ML19347D0311981-03-0404 March 1981 Forwards 810224 Press Release Re Delay of Facility Completion.Financial Situation Has Pushed Facility Completion Into Indefinite Future ML20008E7621981-02-24024 February 1981 Forwards PWR Const Milestones & Activities for McGuire 1 & 2,Catawba 1 & 2 & Cherokee 1.Key Event Dates Provided ML20003C2891981-02-11011 February 1981 Responds to IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Bulletin Does Not Apply ML19345F3631981-02-0505 February 1981 Forwards Evacuation Time Estimates & Color Overlay Site Map, Per Discussions w/P81 Project Manager.W/O Site Map ML19345G0801981-01-27027 January 1981 Forwards Revision 1 to Response Re IE Bulletin 79-14 Revision 1,Suppl 2, Seismic Analysis for As-Built Safety-Related Piping Sys. Describes Program Which Will Give Assurance That Design Documents Reflect Sys Conditions ML19351F9851981-01-27027 January 1981 Responds to IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. No safety-related Valves Using Specified Valve Yokes Are Used ML20002B9171980-11-11011 November 1980 Forwards Supplemental Responses to NRC 801016 Ltr Re Violations Noted in IE Insp Repts 50-369/80-08,50-370/80-05, 50-413/80-09,50-414/80-09,50-491/80-02,50-492/80-06 & 50-493/80-06.Final Rept to Be Submitted by 810131 ML19340B1411980-10-14014 October 1980 Requests Load Info Re Design Pressure,Loca & SSE Loads & Drawings for Five Containment Vessels Referred to in Statement of Work for FY81 ML19344E9781980-08-29029 August 1980 Responds to IE Bulletin 80-19,Revision 1.No mercury-wetted Matrix Relays Are Used or Planned for Use in Reactor Protection Sys ML19344F1871980-08-26026 August 1980 Responds to IE Bulletin 80-16.No Rosemount Models 1151 & 1152 Pressure Transmitters Are Used in safety-related Applications ML19336A6421980-08-15015 August 1980 Responds to NRC 800718 Ltr Re Violations Noted in IE Insp Repts 50-369/80-08,50-370/80-05,50-413/80-09,50-414/80-09, 50-491/80-07,50-492/80-06 & 50-493/80-06.Corrective Actions: Records Storage Facility Constructed ML19344E5061980-08-14014 August 1980 Responds to IE Bulletin 80-20, Failure of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Review Showed No Westinghouse Type W-2 Switches Used in safety- Related Applications ML19331D3631980-08-0606 August 1980 Submits Response to IE Bulletin 79-03A.No SA-312 or A-312, Type 300 Series Fusion Welded Pipe in Use or Planned for Use Is Subj to Design Stresses Greater than 85% of ASME Code Allowable Stresses ML19338C3401980-08-0404 August 1980 Ack Receipt of IE Insp Repts 50-491/80-09,50-492/80-08 & 50-493/80-08 on 800611-13.No Proprietary Info ML19331B6111980-08-0404 August 1980 Submits Const Completion & Fuel Load Target Dates,In Response to NRC 800711 Ltr.For Unit 1,const Completion & Fuel Load Target Dates Are Jul 1980 & Jul 1991 for Unit 2.OL Application to Be Submitted by Sept 1986 ML19327A5411980-07-31031 July 1980 Responds to 800702 Request for Info Re Evacuation Times for Power Plants W/Current or Pending Cps.Cherokee & Perkins Stations Pose No Population Density Situation Which Would Cause Long Evacuation Times ML19331C2621980-07-28028 July 1980 Ack Receipt of IE Insp Repts 50-491/80-08,50-492/80-07 & 50-493/80-07 on 800624-25.No Proprietary Info ML19326E0641980-07-0707 July 1980 Forwards Response to IE Bulletin 80-08, Exam of Containment Liner Penetration Welds. Piping Penetrations Are Designed & Fabricated in Accordance w/1977 Edition of ASME Boiler & Pressure Vessel Code,Including Summer 1977 Addenda ML19327A0081980-06-25025 June 1980 Responds to NRC 790627 Ltr Re Violation Noted in IE Insp Repts 50-491/79-10,50-492/79-10 & 50-493/79-10.Corrective Actions:Corrected Procedure for Determining Bulk Density of Test Sand & Increased Testing of Filter Matl ML19318A8361980-06-0909 June 1980 Forwards Response to IE Bulletin 80-05 Re Vacuum Conditions Resulting in Damage to Holdup Tanks.Lists Vacuum Conditions in Low Pressure & Holdup Tanks by Tank Name,Sys,Quantity/ Unit,Design Pressure & Protective Measures ML19323G8791980-05-0808 May 1980 Ack Receipt of IE Insp Repts 50-491/80-05,50-492/80-05 & 50-493/80-05.No Proprietary Info ML19309G2151980-04-0303 April 1980 Ack Receipt of IE Insp Repts 50-491/80-04,50-492/80-04 & 50-493/80-04 on 800304-07.No Proprietary Info ML19309E8061980-03-28028 March 1980 Ack Receipt of IE Insp Repts 50-491/80-03,50-492/80-03 & 50-493/80-03 on 800303-05.No Proprietary Info ML19305D9951980-03-28028 March 1980 Ack Receipt of IE Insp Repts 50-491/80-02,50-492/80-02 & 50-493/80-02 on 800226-29. No Proprietary Info ML19305E1751980-03-19019 March 1980 Submits Response to IE Bulletin 80-03.Review Revealed That No Charcoal Adsorber Cells Have Been Received from Manufacturers ML19294B8521980-02-11011 February 1980 Ack Receipt of IE Insp Repts 50-491/80-01,50-492/80-01 & 50-493/80-01.No Proprietary Info ML19312D1301980-02-0505 February 1980 Responds to IE Bulletin 79-28.No Namco EA180 Limit Switches from Affected Production Period Are Used or Planned for Use ML19262C2231980-02-0404 February 1980 Informs of Change in Projected Commercial Operation Dates for Facilities.Units 1 & 2 Will Be Placed in Commercial Operation in Jan 1990 & Jan 1992,respectively.FSAR Will Be Filed in Jan 1987.Schedules Are Periodically Reviewed ML19312D5911980-01-22022 January 1980 Responds to NRC 791227 Ltr Re Violations Noted in IE Insp Repts 50-491/79-20,50-492/79-20,& 50-493/79-20.Corrective Actions:Samples Taken,Nonconforming Item Report Written & Computer Tickler Sys Implemented ML19305B9131980-01-15015 January 1980 Responds to NRC 791227 Ltr Re Violations Noted in IE Insp Repts 50-491/79-20,50-492/79-20 & 50-493/79-20.Corrective Actions:Concrete Aggregate Samples Taken,Nonconforming Item Rept Written & Computerized Tickler Sys Implemented ML19257D5661980-01-0707 January 1980 Forwards Revision to Response to IE Bulletin 79-02,Revision 2,re Pipe Support Base Plate Designs.Will Account for Base Plate Flexibility in Calculations of Bolt Loads by Using Conservative Hand Calculation Method ML19257D3801980-01-0404 January 1980 Responds to IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety-Related Sys. No Westinghouse Bfd/Nbfd Relays Are Used in safety-related Sys 1999-05-28
[Table view] Category:NRC TO UTILITY
MONTHYEARML20132A8831985-09-12012 September 1985 Responds to 830921 Request That CPPR-167,CPPR-168 & CPPR-169 Be Deleted.Stabilization Plan Has No Significant Environ Impact.Dockets Changed to Canceled Status NUREG-0694, Advises That Augmented Natural Circulation Training Should Be Performed.Descriptions of Natural Circulation Tests Should Be Included in Fsar.Detailed Test Procedures Must Be Submitted 60 Days Prior to Scheduled Test Performance1981-06-12012 June 1981 Advises That Augmented Natural Circulation Training Should Be Performed.Descriptions of Natural Circulation Tests Should Be Included in Fsar.Detailed Test Procedures Must Be Submitted 60 Days Prior to Scheduled Test Performance ML19351F9851981-01-27027 January 1981 Responds to IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. No safety-related Valves Using Specified Valve Yokes Are Used ML20147J2401978-12-19019 December 1978 Forwards IE Bulletin 78-14 ML20204C7901978-11-24024 November 1978 Forwards IE Bulletin 78-12A,suppl to IE Bulletin 78-12. W/Encl ANO:7811300055 ML20062E9391978-11-24024 November 1978 Forwards IE Inspec Repts 50-491/78-08, 50-492/78-08 & 50-493/78-08 on 781030-1102 & Notice of Violation ML20148R4361978-11-16016 November 1978 Lists Staff Review Categories 2,3 & 4 for Consideration in Preparation of FSAR & Lic Review.W/Encl Descriptions of Categories 2,3 & 4 ML20148H9701978-11-0606 November 1978 Forwards IE Circular 78-18 ML20062C7171978-11-0202 November 1978 Finds Method for Modelling Piping Sys for Static & Dynamic Analysis Was Acceptable for Criteria Used in Analysis of Subj Facil.When Technique Is Used in Future It Must Meet Requirements Listed in Encl NRC Ltr ML20062C6921978-11-0202 November 1978 Requests Addl Info in Order That Review of Appl Can Continue:Az State Water Plan Phase II & III as Available, Mag Documents on Water Resources Mgt for Maricopa County & Phoenix Area Water Resources & Supply Planning ML20062C4101978-10-30030 October 1978 Provides Interim Eval of 780629 Util Class IE Equip Qualification Prog.Recommends Rev of Rept Per Info Requirements in Encl Question 1985-09-12
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20132A8831985-09-12012 September 1985 Responds to 830921 Request That CPPR-167,CPPR-168 & CPPR-169 Be Deleted.Stabilization Plan Has No Significant Environ Impact.Dockets Changed to Canceled Status NUREG-0694, Advises That Augmented Natural Circulation Training Should Be Performed.Descriptions of Natural Circulation Tests Should Be Included in Fsar.Detailed Test Procedures Must Be Submitted 60 Days Prior to Scheduled Test Performance1981-06-12012 June 1981 Advises That Augmented Natural Circulation Training Should Be Performed.Descriptions of Natural Circulation Tests Should Be Included in Fsar.Detailed Test Procedures Must Be Submitted 60 Days Prior to Scheduled Test Performance ML20147J2401978-12-19019 December 1978 Forwards IE Bulletin 78-14 ML20204C7901978-11-24024 November 1978 Forwards IE Bulletin 78-12A,suppl to IE Bulletin 78-12. W/Encl ANO:7811300055 ML20062E9391978-11-24024 November 1978 Forwards IE Inspec Repts 50-491/78-08, 50-492/78-08 & 50-493/78-08 on 781030-1102 & Notice of Violation ML20148R4361978-11-16016 November 1978 Lists Staff Review Categories 2,3 & 4 for Consideration in Preparation of FSAR & Lic Review.W/Encl Descriptions of Categories 2,3 & 4 ML20148H9701978-11-0606 November 1978 Forwards IE Circular 78-18 ML20062C7171978-11-0202 November 1978 Finds Method for Modelling Piping Sys for Static & Dynamic Analysis Was Acceptable for Criteria Used in Analysis of Subj Facil.When Technique Is Used in Future It Must Meet Requirements Listed in Encl NRC Ltr ML20062C6921978-11-0202 November 1978 Requests Addl Info in Order That Review of Appl Can Continue:Az State Water Plan Phase II & III as Available, Mag Documents on Water Resources Mgt for Maricopa County & Phoenix Area Water Resources & Supply Planning ML20062C4101978-10-30030 October 1978 Provides Interim Eval of 780629 Util Class IE Equip Qualification Prog.Recommends Rev of Rept Per Info Requirements in Encl Question 1985-09-12
[Table view] |
See also: IR 05000491/1978008
Text
w
.
- ~ - ~ ~ - - - - - , ~ . . - - . ~ , . . _ , . _ . .
6 , ,
,
, .
e g* "8%g UNITED STATES
,og NUCLEAR REGULATORY COMMISSION
g w g REGloN il
- -
E 101 MARIETTA STREET, N.W.
f ATLANTA, GEORGIA 30303
%, 4
< November 24, 1978
j In Reply Refer To:
' RII:JKR
! 50-491/78-8
i 50-492/78-8
I 50-493/78-8
1
l
1
Duke Power Company
,
Attn: Mr. L. C. Dail, Vice President ,
' Design Engineering
!
(~ P. O. Box 33189
! \- Charlotte, North Carolina 28242
Gentlemen:
This refers to the inspection conducted by J. K. Rausch of this office on
October 30 - November 2, 1978, of activities authorized by NRC Construction
Permit Nos. CPPR-167, CPPR-168 and 'CPPR-169 for the Cherokee Nuclear Station
- ecility, and to the discussion of our findings held with C. B. Aycock at
the conclusion of the inspection.
.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
of setEetive examinations of procedures and representative records, inter-
views with personnel, and observations by the inspectors.
We have examined actions you have taken with regald to previously identi-
3
(,j fied enforcement matters. These are discussed in tSe enclosed inspection
report.
,
'
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. These items
- and references to pertinent requirements are listed in the Notice of
Violation enclosed herewith as Appendix A. This notice is sent to you
l pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice,"
i
Part 2, Title 10, Code of Federal Regulations. Section 2.201 requires you
to submit to this office, within 20 days of your receipt of this notice, a
,
written statement or explanation in reply including: (1) corrective steps
! which have been taken by you and the results achieved; (2) corrective steps
! which will be taken to avoid further noncompliance; and (3) the date when
I full compliance will be achieved.
,
.
'
7812130A59
. .. _ _
.
_ _ _ _ _
_ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -____ ..--
, . ..
. .. . . . .
'
. < --- . .
.. . - . . - . . . _ . . . _ _ . _ _ . _ .
'
,
.
Duke Power Company -2- November 24, 1978
'
t
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
- Title 10, Code of Federal Regulations, a copy of this Letter and the
- enclosed inspection report wiLL be placed in the NRC's Public Document
i Room. If this report contains any information that you (or your contractor)
'
believe to be proprietary, it is necessary that you make a written applica-
}
tion within 20 days to this office to withhold such information from public
,
8
disclosure. Any such application must include a full statement of the
reasons on the basis of which it is claimed that the information is pro-
f
- prietary,,and should be prepared so that proprietary information identi- e.
fied in the application is contained in a separate part of the document.
i
If we do not hear from you in this regard within the specified period,
the report wiLL be placed in the Public Document Room.
'
f' ,
-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
f
C. E. Murphy, Chief
- -__ '
Reactor Construction and
Engineering Support Branch
i Enclosures:
(1) Appendix A, Notice of Violation
(2) Inspection Report Nos. 50-491/78-8,
50-492/78-8 and 50-493/78-8
. cc w/encts:
(_/ Mr. J. T. Moore, Project Manager
.
'
Cherokee Nuclear Station
P. O. Box 422
Gaffney, South Carolina 29340