MONTHYEARHL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5493, Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant HL-5475, Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5447, Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5416, Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5393, Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5364, Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 2 HL-5332, Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant1997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant HL-5314, Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant1997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant HL-5296, Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5283, Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 2 HL-5265, Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5249, Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 2 HL-5237, Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20116J3821996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5202, Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20112J0661996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Ehnp ML20116J3971996-05-31031 May 1996 Revised MOR for May 1996 for Ei Hatch Nuclear Plant Unit 1 ML20112J0691996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant ML20116J3901996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant Unit 1 ML20111B0061996-04-30030 April 1996 Monthly Operating Repts for April 1996 for Ei Hatch Nuclear Plant HL-5144, Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant1996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant ML20111B0131996-03-31031 March 1996 Revised Pages E2-4 for March 1996 for Ei Hatch Nuclear Plant Unit 2 ML20101B1911996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5111, Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant ML20101B2001996-01-31031 January 1996 Revised Page E1-2 for Monthly Operating Rept for Jan 1996 for Ei Hatch Unit 1 HL-5098, Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant HL-5085, Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D3061999-10-13013 October 1999 SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A6641999-09-13013 September 1999 Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With ML20210J9631999-08-0202 August 1999 SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9271999-08-0202 August 1999 SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207E7631999-06-0303 June 1999 Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with ML20206G1691999-05-0404 May 1999 SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207M1891999-03-11011 March 1999 SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20206P6981999-01-0707 January 1999 Ehnp Intake Structure Licensing Rept HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20196J4931998-12-0707 December 1998 Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With ML20155B6121998-10-28028 October 1998 Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20153G2481998-09-24024 September 1998 SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request ML20239A2531998-09-0303 September 1998 SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20238F7131998-08-31031 August 1998 9,change 2 to QAP 1.0, Organization HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5657, Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures1998-07-30030 July 1998 Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures ML20236W3441998-07-30030 July 1998 Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2 ML20236V5191998-07-28028 July 1998 Safety Evaluation Accepting Proposed License Amend Power Uprate Review ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20236L1821998-07-0707 July 1998 Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3) HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20248B8651998-05-15015 May 1998 Quadrennial Simulator Certification Rept HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20216B2711998-02-28028 February 1998 Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20199B0561997-12-31031 December 1997 Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 HL-5581, Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 21997-12-31031 December 1997 Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20212A1981997-10-16016 October 1997 Safety Evaluation Denying Licensee Request for Relief from Implementation of 10CFR50.55a Requirements Re Use of 1992 Edition of ASME Code Section XI for ISI of Containments ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H5311997-10-0101 October 1997 Rev 2 to Unit 1,Cycle 17 Colr ML20211H5251997-10-0101 October 1997 Rev 3 to Unit 1,Cycle 17 Colr 1999-09-30
[Table view] |
Text
_
i m
OPERATING DATA REPORT DOCKET NO. 50-321 DATE _11-5-78 COMPLETED BY S. Wilson
. 5- TELEPIIONE 912-367-7781 i OPERATING STATUS I. Unit N1me: Hatch - 1 Notes >
- 2. Reporting Period: - October 1978
- 3. Licensed Thermal Power I\lWt): 2436
- 4. Nameplate Rating (Gross MWel: 809
- 5. Design Electrical Rating (Net MWe): 786
- 6. Maximum Dependable Capacity (Gross MWe): 748.6
- 7. Maximum Dependable Capacity (Net MWel: 717
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
1 9; Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr to.Date Cumulative
- 11. Hours In Reporting Period 745 7296 36242
- 12. Number Of Hours Reactor Was Critical 704.9 5194.6 26999.4
- 13. Reactor Reserve Shutdown Hours 0 0 0
- 14. Hours Generator On-Line 695.9 5003.6' 24628.4
~
-- 15. Unit Reserve Shutdown Hours . 0 0 0
- 16. Gross Thermal Energy Generated (MWil) 1465541 10605399 46538221 3 17. Gross Electrical Energy Generated (MWH) 484010 j 3487860 15044721 -
- 18. Net Electrical Energy Generated (MWH) 462221 3315685
- 19. Unit Sersice Factor 93.4 _ 14310269 68.6 70.2
- 20. Unit Availability Factor 93.4 68.6 70.2
- 21. Unit Capacity Factor (Using MDC Net) 86.5 63.4 56.4 I
- 22. Unit Capacity Factor (Using DER Net) 78.9 57.8 51.9
- 23. Unit Forced Outa;:e Rate 6.6 20.4 __
18.6
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):
Maintenance Outage; 3-3-79: 6 weeks I
- 25. If Shut Down At End Of Reimrt Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): __
Forecast Achiesed INITIA L CRITICA LITY INITI \L ELECTRICITY {
CminERCia L OPER AriON (
i 7811160CM '"# "
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-321 UNIT - Hatch - 1 DATE 11-5-78
-s.
CO5fPLETED BY Wilson
.; TELEPl!ONE 912-367-7781 MONTil October i DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We-Net) (3twe. Net)
I 766 g7 732
) 2 766 gg 734
) 3 768 39 732 4 766 595
, 20 5 628 '570 21 6 -14 22 625 7 -5 428 23 8 330 415 3
9 634 25 683 10 71 9 707 26 I1 706 696 27 12 651 2g 674
, ), 13 730 29 736 I4 619 715 30 IS 702 718 3,
16 734 INSTRUCTIONS On this format. list the average daily unit power levelin NtWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
, (9/77)
- - .TL
s >
\ s .
da .
UNITSIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-321 i
UNIT NAME _.fatch-1 DATE 11-5-78 REPORT MON Hg _ October COMPLETED By s. wiisc,n TELEPIIONE 912- % 7-7781 l
No. Date t .! ?
gg 3g Y Licensee ,E s;,
- h. Cause & Corrective
$E 5 Action to i j5 Report # (E C
[U Prevent Recurrence Q
78-20 .10-5-78 F 49.1 A 3 N/A CII INSTRU Feedwater Control Failure Rx. Iligh Water Level 78-21 10-22-78 F 0 A- 4 N/A CB PUMPXX Recirc Pump MG Set Exciter Repair f
l 2 F: Forced 3 4 Reason:
S: Scheduled Method:
A-D iuipment Failure (Explain) 1-Manual Exhibit G Instructions ILMaintenance or Test for Preparation of Data 2 Manual Scram. Entry Sheets fer Licensee C Refueling D-Regulatory Restriction 3 Automatic Scram. Event Report iLE R) File (NUREG-4 Other(Explain) 0161)
E-Opesator Training & License Examination F-Administrative G Operational E:ror(Explain) 5 (9/77) ll Other ( Explain) Exhibit I Same Source
NARR ATIVE REPORT HATCH 1 Oct. 1 Normal Operation Oct. 5
' Reac tor Scram 78-10 ( 00- 1 14 ) Due to Feedwater Control Failure at 2102 CDT Oct. 7 On Line 2206 CDT Oct. 8 Preconditioning Oct. 11 System Restriction; Full Core Flow
- Oct. 12 Rod Adjustment Oct. 14 Rod Adjustment Oct. 20 Reducing Load to Repair Reactor Feed Shaft Driven Oil Pump 1520 CDT (3 Oct. 22 Reducing Load to Repair Recire Pump MG Set Exciter 2120 CDT Oct. 25 Preconditioning Oct. 27 Rod Adjustment There was no single release of radioactivity or single radiation exposure which accounts for more than 10 percent of the allowable annual values during the month of October.
\
4
)
. i N
'k
HATCH 1 SAFETY - RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR OCTOBER 1978 NUMBER DATE COMPLETED DESCRIPTION 1079 5- 11-77 Perform cable terminations and
, changes per DCR-77-90.
1080 5 77 Perform cable terminstions and changes per DCR-77-30.
1081 5-11-77 Perform cable terminations and changes per DCR-77-30.
1082 5 77 Perform cable terminations and i i ~j changes per DCR-77-30. .
^
1083 5 77 Perform cable terminations and
(
changes per DCR-77-30.
I 1084 '
5 77 Perform cable terminations and changes per DCR-77-30.
1085 5 77 Perfom cable terminations :
changes per DCR-77-30.
1086 5-11-77 Perform cable terminations and changes per DCR-77-30.
1087' 5- 11 -77 Perform cable terminations and changes per DCR-77-30.
1091 5-11-77 Perform cable terminations and changes per DCR-77-30.
~
1092 5-11-77 Perform cable terminations and changes per DCR-77-30.
, '1093 5-11-77 Perform cable terminations and changes per DCR-77-30.
1094 5- 9-77 Perform cable terminations and changes per DCR-77-30.
i
, . 16 18 5 p-77 neconnect pressure gauges to diesel l 1B l
,w-
I *
. - . - . ~ . _ . . . . . , ,
NUMBER DATE COMPLETED DESCRIPTION 2872 9-30-78 1
Perform change as per DCR-77-210, R1 3967 2 78 Install RHR loop discharge
~
pipe level switch 0125 10 78 i Install keylock switches in panel Hil-P652 per DCR-77-30 0126 10-13-78 Tie in standby PSW pump to diesel generator 1B 0 167 6- 1-78 Recalib ra te flow switches to accomodate new ' low orifice.
, , 0327 10 78 i
y Install and wire pressure indicator per DCR-77-30
~~
0579 10-5-78 Replace LPRM Strings 0580 10- 9-78 Disconnect adjacent LPRM's prior to CRD replacement.
0662 8- 3-78 Remove blind flange installed in place of restricting crifice 0874 10-18-78 Perform preventive maintenance on CRD water pump '
2103 10-8-78 Replace B31-F040A -
2773 10-12 -78 change oil in diesel genera tor and engine [
2774 10-12-78
- Change oil in diesel generator and engine ,
2907 10-12-73 Repair oil leaks on "lC" diesel engine 2997 10- 13-78 Inspect stablizing valves on CRD flow 3001 9 78 Perform P/M on standby liquid
. control pumps i
_ - - - _ a
NUMBER DATE COMPLETED DESCRIPTION 3019 9-29-78 Check limit switch on RCIC turbine trip and throttle valve 3020 10-5-78 Calibrate RCIC low pressure alarm switch i
3030 10-28-78 Replace thermometer temp. sw. on lube oil line 3091 10-9-78 Repair valve knocker on "A" vessel
~
RWCU vent valve 3104 10-17-78 Perform the in place DOP and halogenated hydrocarbon test j 3135 10-13-78 Repair oil leaks in recirc MG set p lube sys. "A" 3150 10-9-78 Repair valve knocker on linkage between handwheel & valve 3151 10-9-78 Repair valve linkage between handwheel & valve 3152 10-9-78 Repair valve linkage between handwheel and valve 3163 10-1-78 Clean connections on- ertiuent rad.
monitor 3172 10-4-78 Clean stepping switch on CRD control trip machine A unit 1
~
3186 10-11-78 Inspect control rod scram time s] recorder 3210 9-30-78 Bypass APRM "C" per HNP-1-7708 3221 10-19-78 Repair steam leak on bonne t gasket E41-F029 3232 10-4-78 Repair W32-F002A 3252 10- 10-78 Implement bulk core per DCR 78-185
/
L ' TJ
[
NUMBER DATE COMPLETED DESCRIPTION 3253 10-4-78 Adjust hinges on door at 1C diesel last entrance J
3254. 9-27-78 Replace micro switch on multipoint temp. recorder 3297 10-23-78 Replace bell assembly on 1D21-R165 3306 10-19-78 Check calibration of integrator 3316 9-29-78 Replace bad point card on H11-P657
. 33 17 10-1-78 Clean rull core display cooling air filters 3321 10- 1-78 Repair quad-trip cord on "APRM "A" inop" light 3322 10-13-78 Inspect fission product monitor 3324 10- 13-78 Repair CRD housing HOC 06- 23 solenoid 3325 10-6-78 Repair drive cord on ARM recorder 3360 10- 9-78 Fill and vent transmitter RHR loop "A" flow gauge 3392 10- 10-78 Repair R'4CU outboard isolation valve control switch 3400 10- 4-78 Repair D/W
('~'
~)
isolation valve switch 340 1 10- 3-78 Repair C/R Rx water Yarway indicator 3404 10-7-78 Rerou te and rewire conduit per f DCR-78-219 3406 10-12-78 Check calib ration of 1C D/G oil temp. hi alarm 6
3409 10-5-78 Repair sw on "HPCI compartment sump
. Hi-Hi level" alarm
, i
. s
+-
NUMBER DATE COMPLETED DESCRIPTION 3417 10-6-78 Change setpoints on fission product l monitors per HNP-7450
' 3419 10-12.-78 Replace relay on TIP drive control "A"
i 3423 10-10-78 Repair hinge on torus air /wa ter j temp recorder l 3457 10-7-78 Hepair linkage on RPS trip system
( "B" circuit breaker 1B 3458 10-11-70 Replace amp. cord on feedwater 'B' flow transmitter 1
j 3460 10-7-78 Repack vent valve on 1B31-F025A
(~ 3467 10-15-78 Repair insulation on the exhaust line of emergency diesel B 3468 10- 15-78 Repair insulation on the exhaust line of emergency diesel C 3469 10-15-78 Repair insulation on the ex haust line of emergency diesel A 3476 10- 26-78 Lower setpoint on standby liquid control per DCR-76-203 3484 10-23-78 Replace nipple on RWCU seal water line.
3488 10- 12-78 Install re built valve in CBD
', accumulator k>
3507 10-13-78 Repack C11-F011 valve
' ~
35 12 10-13-78 Repair spent resin pump "B" condensate flow indicator 3513 10- 17-78 Repair spent resin pump "B" condensate flow indicator 3524 10-18-78 Repack cartridge valve 3530 10-16-78 calibra te post LOCA rad , monitor per DCR-78-125
/
l 4
NUMBER DATE C04PLETED DESCRIPTION 3556 10-16-78 Repair broken amp connection i on rudwaste effluent monitor 3561 10-1B-78 Change setpoints on the j offgas pretreatment monitor HNP-1-5100 3566 10-25-78 Inspect SJAE "B" 3 rd stage steam
} flow transmitter 3571 10-23 18 repair RWCU pump 1B 3572 10- 18-78 Replace keys in shaft linkage is Rx. Bldg. airlock 3578 10- 27-78 j
Modify Rx. torque vent monitor per DCR-77-257
{
(') 3583 10-27-78 Adjust R24-S018A breaker handle 3584 10 78 Adjust R24-S019 B breaker handle '
3587 10-24-78 Replace RCIC barometric condenser vacuum pump If 3601 10-25-78 Align Rx. water levol 200" to 500" ,
recorder 3602 10-25-78 Replace amp in pretreatment flux tilt monitor recorder 3606 10-25-78 Inspect alarm for stadnby liquid tank temp Hi/Iow level
, i. 3607
- s' 10-20-78 Clean contacts on trip ref. cord
- for APRM channel "B" 3648 10-25-78 Replace amp for R/F vent filter disch recorder 3669 10-25-78 Repair core flow recorder panel H11-P603 3694 10-25-78 Repair bad connection in input to reciro 20 set temp recorder 3655 10-27-78 Repair R/W centrifuge 1B room door alarm 3664 10-27-78 Repair RMB 'B' 1C51-K605 369 1 10- 28-78 Calibrate N2 flow indicator
-ri