ML20062C963
| ML20062C963 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 10/06/1978 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| Shared Package | |
| ML20062C957 | List: |
| References | |
| NUDOCS 7811150272 | |
| Download: ML20062C963 (2) | |
See also: IR 05000317/1978026
Text
..
.
,
- y
-
- "'4tg
UNITED STATES
fg
NUCLEAR REGULATORY COMMISSION
y 3 )e(
S
REGION I
-
(
- j
631 PARK AVENUE
0,N'Q*....f
?
g
KING OF PRUSSI A. PENN5YLVANI A 19404
Docket Nos. 50-317
6 OCT 1978
50-318
Baltimore Gas and Electric Company
ATTN:
Mr. A. E. Lundvall, Jr.
Vice President
P. O. Box 1475
c
Baltimore, Maryland
21203
Gentlemen:
Subject:
Inspection 50-317/78-26, 50-318/78-20
This refers to the inspection conducted by Mr. D. Johnson of this office
on September 12-15, 1978, of activities authorized by NRC License No.
DPR-53 and DPR-69 at Calvert Cliffs Nuclear Power Plant, Units land 2,
Lusby, Maryland, and to the discussions of our findings held by Mr. Johnson
with Mr. L. Russell of your staff at the conclusion of the inspection,
and to a subsequent telephone discussion between Mr. Johnson and Mr.
Russell on September 18, 1978.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter.
Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with NRC requirements,
as set forth in the Notice of Violation, enclosed herewith as Appendix
A.
This item of noncompliance has been categorized into the levels as
described in our correspondence to you dated December 31, 1974.
This
notice is sent to jou pursuant to the provisions of Section 2.201 of the
NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within twenty (20)
days of your receipt of this notice, a written statement or explanation
in reply including:
(1) corrective steps which have been taken by you
and the results achieved; (2) corrective steps which will be taken to
avoid further items of noncompliance; and (3) the date when full compli-
ance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and
i
l
l
'2811150x13-
.
.
.
Baltimore Gas and Electric Company
2
6 0CT 1978
the enclosures will be placed in the NRC's Public Document Room.
If
this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure. Any such application must be accompanied by an
affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement
of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of
Section 2.790. The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit.
If we do not
v
hear from you in this regard within the specified period, the report
will be placed in the Public Document Room.
Should yau have any questions concerning this inspection, we will be
pleased :o discuss them with you.
Sincerely,
9
j
E dond,Brunner, Chief
_e
Reactor Operations and Nuclear
Support Branch
Enclosure:
1.
Appendix A, Notice of iolation
2.
Office of Inspection
1 Enforcement Inspection
,
'
Report Number 50-317, 18-26, 50-318/78-20
cc w/ enc 1:
R. W. Davies, Manager, Quality Assurance
,
R. M. Douglass, Chief Engineer
W. Gibson, Supervisor Operational QA
i
,