8400 UNITED sT ATEs

. 9'g NUCLEAF4 REGULATORY COMMISSION

s

[, REGloN 11

  • 3 , y ,'$

v. ([* r 101 M ARIETT A sTRE ET. N.W.

o .g ATLANTA. GEORGIA 30303

>

% *.". . . # SEF : 91978

In Reply Refer To:

RII:DRQ

50-302/78-21

-Florida Power Corporation

Attn:- Mr. W. P. Stewart, Director

Power Production

P. O. Box 14042, Mail Stop C-4

  • .

St. Petersburg, Florida 33733

Gentlemen:

This refers to the inspection conducted by Mr. R. H. Wessman of this office

on August 14-18, 1978 of activities authorized by NRC Operating License No.

DPR-72 for the Crystal River 3 facility, and to the discussion of our findings

, held with Mr. G. R. Westafer at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspectors.

We have examined actions you have taken with regard tu previously identified

enforcement matters and unresolved items. The status of these items is

discussed in the enclosed report.

Two new unresolved items resulted from this inspection and are discussed in

the enclosed report. These items will be examined during subsequent inspec-

tions.

i During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. This item and

references to pertinent requirements are listed in the Notice of Violation

enclosed herewith as Appendix A. This notice is sent to you pursuant to the

provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,

l

Code of Federal Regulations. Section 2.201 requires you to submit to this

office, within 20 days of your receipt of this notice, a written statement

or explanation in reply including: (1) corrective steps which have been

taken by you and the results achieved; (2) corrective steps which will be

taken to avoid further noncompliance; and (3) the date when full compliance

will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

.

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed -

inspection report will be placed in the NRC's Public Document Room. If this

~

781110 0 ca3

__

_

. .

,

. .

,

.

.

.

Florida Power Corporation -2- SEP : 31373

report contains any information that you (or your contractor) believe to be

-proprietary, it is necessary that you make a written application within 20

days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the document. If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

!

Sincerely,

-

. J. ,ong

Reactor Operations and

Nuclear Support Branch

Enclosures:

1. Appendix A, Notice of Violation

2. Inspection Report No. 50-302/78-21

cc: Mr. G. P. Beatty, Jr.

Nuclear Plant Superintendent

P. O. Bor 1228

l

Crystal River, Florida 32629

,

l