ML20059L227

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 900701-0811.Violation Noted:Nine Security Guards Failed to Adhere to Posting Requirements
ML20059L227
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/04/1990
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20059L222 List:
References
50-333-90-05, 50-333-90-5, NUDOCS 9009260217
Download: ML20059L227 (1)


Text

_

APPENDIX A Notice of Violation New York Power Authority Docket No.60-333 James A. FitsPatrick Nuclear Power Plant License No. DRP-59 As a result of the inspection conducted on July 1 through August 11, 1990, and-in accordance with NRC Enforcement Policy (10 CFR 2, Appendix C) the following violation was identified.

a.

Technical Specifications 6.11.

requirec, in part, that the -licensee implement procedures for personnel radiation protection.

NYPA's Radiation Protection Manual, Chapter 6,

Exposure Control and Chapter-8, _ Radiation Work Permit require adherence to all radiological postings.

Furtner, ent: y into a posted high radiation area requires. a pre-entry discrosion with radiation technicians and the use of a radiation -

work permit (RWP).

Contrary to the above, on August 1 and 2, 1990 nine security guards, at separate times, failed to adhere to posting requirements.

Specifically, one individual entered the east crescent area, a posted high radiation area, without using an RWP.

The eight other individuals entered the same area without a pre-entry discussion with - a radiation technician and without using an kWP.

This is a Severity Le<el IV violation (Supplement IV).

Pursuant to the provisions of 10 CFR 2.201, the New: York Power Authority is hereby required to submit to this office within thirty days of the date of the letter which transrr.itted this Notice, a written statement or explanation in reply, including:

(1) the corrective steps which been taken and the results achieved, (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved.

Where good cause is known, consideration will be given to extending this response time.

9009260217 900904 PDR ADOCK 03000333 O

PDC

_