. pn atco.
I-UNITED STATES t
,. [*-
,j NUCLEAR REGULATORY COMMISSION f
WASHINGTON, D.C 205Ei6-0001 I
PUBLIC SERVICE ELECTRIC & GAS COMPQi1 PHILADELPHIA ELECTRIC COMPANY DELMARVA POWER AND LIGHT COMPANY-l ATLANTIC CITY ELECTRIC COMPANY I
DOCKET NO. 50-311 l
SALEM NUCLEAR GENERATING STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE i
Amendment No. 128 j
License No. DPR-75 j
1.
The Nuclear Regulatory Comission (the Comission or the NRC) has found that:
A.
The application for amendment filed by the Public Service Electric &
.i Gas Company, (the licensee) dated August 30, 1993, complies with the j
standards and requirements of the Atomic Energy Act of 1954, as 1
amended (the Act), and the Comission's rules and regulations: set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission-4 C.
There is reasonable assurance: (1) that the activities authorized by this amendment can be conducted without endangering the health and -
safety of the public, and (ii) that such activities will be conducted-in compliance with the Comission's regulations set forth in 10 CFR -
Chapter I; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51.of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment, and 4
paragraph 2.C.(2) of Facility Operating License No E DPR-75 is hereby amended to read as follows:
9402030256 940121 PDR ADOCK 05000311 P
(2)-Ig.chnical Soecifications and Environmental Protection Plan The Technical Specifications contained in Appendices A and B, as revised through Amendment No.128, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment.is effective as of its date of issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION cdn I INdI '
E Charles L. Miller, Director Project Directorate I-2 Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications i
Date of Issuance:
January 21, 1994 i
l l
f 1
1
p-AIBCHMENT TO LICENSE AMENDMENT NO. 128 FACILITY OPERATING LICENSE NO. DPR-75 DOCKET NO. 50-311 Revise Appendix A as follows:
Remove Paaes Insert Paaes-3/4 6-15 3/4 6-15 3/4 6-17 3/4 6-17 3/4 6-19 3/4 6-19 3/4 6-20 3/4 6-20 I
i h
l
L t
i 1
s CONTAINMENT SYSTEMS 1
o SURVEILLANCE REQUIREMENTS (Continued) l 4.6.3.2 Each isolation valve specified in Table 3.6-1 shall be l
demonstrated OPERABLE during the COLD SHUTDOWN or REFUELING MODE at f
least once per 18 months by:
a.
Verifying that on a Phase A containment isolation test signal, each Phase A isolation valve actuates to its isolation position.
.t b.
Verifying that on a Phase B containment isolation test signal, each Phase B isolation valve actuates to its isolation position.
l c.
NOT USED d.
Verifying that on a Containment Purge and Pressure-Vacuum Relief isolation test signal, each Purge and Pressure-Vacuum i
Relief valve actuates to its isolation position.
e.
Verifying that the containment Pressure-Vacuum Relief Isolation valves are limited to s 60* opening angle.
4.6.3.3 At least once per 18 months, verify that on a main steam isolation test signal, each main steam isolation valve specified in Table 3.6-1 actuates to its isolation position.
4.6.3.4 The isolation time of each power operated or automatic valve of Table 3.6-1 shall be determined to be within its lLmit when tested pursuant to Specification 4.0.5.
4.6.3.5 Each containment purge isolation valve shall be demonstrated OPERABLE within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after cach closing of the valve, except when the valve is being used for multiple cyclings, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying that when the measured leakage rate is added to the leakage retes determined pursuant to Specification 4.6.1.2d. for all other Type B and C penetrations, the combined leakage rate is less than or equal to 0.60La.
4.6.3.6 A pressure drop test to identify excessive degradation of resilient valve seals shall be conducted on the a.
Containment Purge Supply and Exhaust Inolation Valves at least once per 6 months.
b.
Containment Pressure - Vacuum Relief Isolation Valves at least once per 3 months.
SALEM - UNIT 2 3/4 6-15 Amendment No.jpg
TABLE 3.6-1 (Contd.)
l CONTAINMENT ISOLATION VALVES VALVE NURBER FUNCTION ISOLATION TIME (Seconds)
D.
NOT USED t
E.
STEAM GENERATOR BLOWDOWN ISOLATION 1.
21 GB 4#
Steam Generator Blowdown
$10 Sec.
2.
22 GB 4#
Steam Generator Blowdown 510 Sec.
3.
23 GB 4#
Steam Generator Blowdown slo Sec.
4.
24 GB 4#
Steam Generator Blowdown slo Sec.
5.
21 SS 94#
SG Blowdown Sampling
$10 Sec.
6.
22 SS 94#
SG Blowdown Sampling
$10 Sec.
7.
23 SS 94#
SG Blowdown Sampling
$10 Sec.
8.
24 SS 94#
SG Blowdown Sampling
$10 sec.
F.
CONTAINMENT PURGE AND PRESSURE - VACUUM RELIEF 1.
2 VC 1 Purge Supply 52 Sec.
2.
2 VC 2 Purge Supply 52 Sec.
3.
2 VC 3 Purge Exhaust
$2 sec.
4.
2 VC 4 Purge Exhaust s2 Sec.
5.
2 VC 5*
Pressure - Vacuum Relief 52 Sec.
6.
2 VC 6*
Pressure - Vacuum Relief 52 Sec.
SALEM - UNIT 2 3/4 6-17 Amendment no. 128
+
9 TABLE 3.6-1 (Contd.)
a CONTAINKENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (Seconds)
'l C.
MANUAL (Contd.)
- 30. 21 SS 181*
Post LOCA Sampling Not' Applicable
- 31. 21 SS 182*
Post LOCA Sampling Not Applicable-
- 32. 21 SS 188*
Post LOCA Sampling Not Applicable l
.33, 21 SS 189*
Post LOCA Sampling Not Applicable
- 34. 23 SS 181*
Post LOCA Sampling Not Applicable 1,
- 35. 23 SS 182*
Post LOCA Sampling Not Applicable
[
36, 23 SS'184*-
Post LOCA Sampling Not-Applicable i
'I
- 37. 23 SS 185*
Post LOCA Sampling Not Applicable
- 38. 21 VC 17*
Post LOCA Sampling Not Applicable
- 39. 21 VC 18*
Post LOCA Sampling Not Applicable
-[
- 40. 21 VC 19*
Post LOCA Sampling Not Applicable 41, 21 SF 20*
Post LOCA Sampling Not Applicable
- 42. 22 VC 17*
Post LOCA Sampling Not Applicable.
- 43. 22 vc 18*
Post LOCA Sampling Not' Applicable 44.~ 22 VC 19*
Pcat LOCA Sampling Not Applicable h
- 45. 22 VC 20*
Post LOCA Sampling Not Applicable l
46, 21 CS 2+
Containment Spray Not Applicable j
~
- 47. 22 CS 2+
Containment Spray Not Applicable H.
CHECK 1.
2 CV 74 CVCS-Charging Line Not Applicable.
2.
2 CV 296 CVCS-RCP Seals Not Applicable 3.
2 CC 119 Component Cooling to RCP Not Applicable 4.
2 CC 186
. Component Cooling to RCP Not Applicable
-j 5,
2 CC 208 Component Cooling to RCP Not Applicable 6.
21 CS 48 Containment Spray
.Not Applicable i
7.
22 CS 48 Containment Spray Not Applicable'
'I 8.
2 DR 30 Domineralized Water System Not Applicable l
9.
2 FP 148 Fire Protection System Not Applicable 10.
2 NT 26 Pressurizer Relief Tk. - Nitrogen Conn. Not Applicable i
11.
2 NT 34 Accumulator Nitrogen Supply Not Applicable 12.
2 SA 119 Compressed Air Supply 13.
2 WR 81 Pressurizer' Relief Tank - Primary ~
Not Applicable Not Applicable
[
Water Conn.
1
- 14. 21 CA 360 Instrument Air Supply Not Applicable l
- 15. 22 CA 360 Instrument Air Supply Not Applicable
- 16. 21 BF 22 Main Feedwater Not. Applicable
[
- 17. 22 BF 22
. Main Feedwater Not' Applicable l
- 18. 23 BF 22 Main Feedwater Not Applicable
- 19. 24 BF 22 Main Feedwater Not Applicable Tj i
May be opened on an intermittent basis under administrative control.
- Not subject to Type C leakage' tests.
')
- Either valve 2 CV 68 or 2 CV 69 must be OPERABLE.
-l Normally closed motor operated containment isolation valve. Valve
+
opens'en Phase B isolation.
SALEM - UNIT 2 3/4 6-19 Amendment No.128 l
1
y, i
5 i
k 4
i PAGE INTENTIONALLY ELANK I
1 I
(
,I i
SALEM - UNIT 2 3/4 6-20 Amendment No.128 i
.