SSWMJEL COMmeAW inued er ouAuTY ASSURANCE r

QUALITY ASSURANCE PROGRAM FOR:

SPENT FUEL & WASTE TECHNOLOGY SERVICES om 8/23/90 1 Of I Ralease No. 2 Page

/bHE ATT ACHED PAGES IN THE INDICATED QA PROGRAM MANU AL AND DESTROY THOSE REPLACED O The attached B&W Puel Company (BWFC) Quality Assurance Program Manual for Spent Fuel and Waste Technology Services (Document No.

56-1168014-02) is a amplete revision of the previous manual (56-1168014-01).

It is effective as of August 23, 1990, and it will be fully implemented by October 23, 1990.

The revised manual

reflects, in essence, the same basic QA requirements as the previous manual.
However, the following changes and/or additions are worthy to note 1.

The revised manual includes an organization name change from

" Spent Fuel & High Level Waste Services" to " Spent Fuel &

Waste Technology Services" 2.

The revised manual incorporates the functions and responsibilities of the BWFC QA organization which was formed in June, 1989.

3.

The revised manual changes the relationship between BWFC and the Commercial Nuclear Fuel Plant (CNFP).

It treats CNFP as the manuf acturing and field operations arm of BWFC rather than as a " supplier" to BWFC.

4.

The revised manual replaces the BWFC 09-1212-04 QA Specification a. the BWFC QA requirements for safety related work performed by CNFP.

CNFP will implement the requirements of this manual through lower tier QA plans for its-manufacturing and field operations.

These plans will ultimately replace the existing CNFP QA Program Manuals for Nuclear Fuel & Associated Components and Field Operations.

1 This replacement will take place over the next several months.

5.

The revised manual follows the guidelines of the NRC Standard Review Plan for QA Preycums (NUREG-0800 Rev. 2).

6.

The revised manual contains an Appendix which describes the l

BWFC positions on the quality related NRC Regulatory Guides.

l These positions are basically the same as those in the NRC l

accepted BWFC QA Topical Report 10096A Rev.

4.

7.

The revised manual contains an Addendum which establishes the QA requirements for non-safety related work, i

l l

If there are any comments or questions concerning the revised manual, please contact C. A. Armontrout on (804) 385-2473 or W. ".

Engelke at (804) 385-2437.

SUPERVISOR $ SHALL ENSURE THAT APPLICABLE MATERIAL IN THIS RELEASE IS BROUGHT TO THE ATTENTION OF ALL PERSONNEL UNDER THEIR SUPERVISION WHO ARE NOT ASSIGNED MANUALS.

9009100274 900905

{DR ADOCL 07100506 PDC

l e

BWfC 1006 (6/88) j THIS MANUAL HAS BEEN ASSIGNED TO:

I O Controlled Document No. 561168014 02 O Uncontrolled B&W FUEL COMPANY QUALITY ASSURANCE PROGRAM FOR 1

SPENT FUEL & WASTE TECHNOLOGY SERVICES 1

1 S&W Fuel Company Lync5 burg, Virginia t

__------__~-.--.---...,..-----_-.-..-.n,,_w,.,,.-..n,-.,,-wr,.-,,,,,r-,,c-,,

-..--,,--,.-n,,,,,,-,

B&WFUEL COMPANY 1

QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION i

NO.

NO.

1 ii TABLE OF CONTENTS 2

l COMPLETE MANUAL REVISION RELEASE NO. 2 EFFECTIVE DATE 8/23/90 SECTION TITLE REVISION NO.

DATE i

Cover Page Revision 2 8/23/90 11 Table of Contents Revision 2 8/23/90 lii Statement of Policy & Authority Revision 2 8/23/90 0

Introduction Revision 2 8/23/90 1

Organization Revision 2 8/23/90 2

Quality Assurance Program Revision 2 8/23/90 3

Design Control Revision 2 8/23/90 4

Procurement Document Control Revision 2 8/23/90

)

l 5

Instructions, Procedures, & Drawings Revision 2 8/23/90 l

6 Document Control Revision 2 8/23/90 7

Control of Purchased Items and Services Revision 2 8/23/90 8

Identification & Control of Items Revision 2 8/23/90 9

Control of Processes Revision 2 8/23/90 10 Inspection Revision 2 8/23/90 11 Test Control Revision 2 8/23/90 12 Control of Measuring & Test Equipment Revision 2 8/23/?O 13 llandling, Storage, & Shipping Revision 2 8/23/90 14 Inspection, Test, & Operating Status Revision 2 8/23/90 15 Control of Nonconforming Items Revision 2 8/23/90 Page 1 of 2

e e

B&W FilEL COMP.*WY QUALITY ASSURANCE PR0t RAM SPENT FUEL & WASTE TECHNOLOGY SERVICES I

SECllON SUBJECT REvlSION NO.

NO.

11 TABLE OF CONTENTS 0

SECTION TITLE REVISION NO.

DATE 16 Corrective Action Revision 2 8/23/90 l

17 Quality Assurance Records Revision 2 8/23/90 18 Audits Revision 2 8/23/90 l

APPENDIX A Compliance with Applicable NRC Revision 0 8/23/90 Regulatory Guides APPENDIX B QA Program Policies, Procedures, &

Revision 0 8/23/90 Instructions (Typical Listing)

APPENDIX C Acronyms / Abbreviations / Definitions Revision 0 8/23/90 ADDENDUM A QA Program for Nonsafety Related Revision 0 8/23/90 Products & Services Il i0 Approved: bI'

?w Date W.

T. Engelke,Mynager Qualit Assuranbe 5

N Approved:

Date R. H.

Ihde, President B&W Fuel Company Approved:

h Date M2 Y6 P.

C.

Childress, Manager

/ /

Spent Fuel & Waste Technology Services Page 2 of 2

c BBW NHL COMPANY e

QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

iii STATEMENT OF POLICY & AUTHORITY 0

It is the policy of the B&W. Fuel company to establish total customer satisfaction by:

{

(a)

Delivering products and services that meet or exceed customer requirements and specifications, and comply with applicable regulations, codes, and standards.

(b)

Instilling in all personnel a desire to perform in a quality manner and previding them with feedback on their performance.

(c)

Identifying areas in need of improvement and taking appropriate action.

1 (d)

Imposing applicable requirements through appropriate procurement documents on each B&W Fuel company supplier.

The Quality Assurance practices estat11shed by this Manual describe the B&W Fuel Company method of implementing the above policy and complying with the applicable regulations, codes, and standards for nuclear fuel and related services.

These practices have the unqualified support of all levels within the B&W Fuel Company and are an eLsential activicy of each of the organizations within the B&W Puel Company.

The Manager of Quality Assurance of the B&W Fuel Company has the responsibility, authority, and organizational freedom to enforce and monitor compliance with the above policy and the practices described in this Manual.

This includes direct access to all levels of management by Quality Assurance personnel necessary to accomplish their assigned duties.

In addition, the Quality Assurance organization has the authority and duty to:

identify quality problens; initiate, recommend, or provide solutions; verify implementation of solutions; and limit or control further processing,

delivery, or installation of nonconforming items or unsatisfactory conditions until proper disposition has occurred.

Any quality related problems that arise within the B&W Fuel company that cannot be resolved by the Manager of Quality Assurance will be resolved by the President.

l Page 1 of 1

l B&WFUE COMPANY QUAUTY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

N0_

O INTRODUCTION 2

0.1 PURPOSE AND SCOPE This Manual describes the Quality Assurance Program (QAP) for the Spent Fuel & Waste Technology Services Product Line of the B&W Fuel Company except for ASME Boiler & Pressure Vessel Code Section III items which are covered by separate QAP manuals.

The QAP outlined in Sections 1-18 of this Manual is mandatory for safety related (refer to Appendix C for definition) products and services.

Addendum A to this Manual describes the requirements for non-safety related products and services.

This QAP is in compliance with and fulfills the requirements of the regulations, codes, standards, and other requirements listed in Section 2.2.

Each section of this Manual describes the controls in place to accomplish compliance.

Typical policies, procedures, and instructions which detail how these controls are implemented i

are listed in Appendix B.

The B&W Fuel Company (BWFC) is headquartered at 3315 Old Forest Road, Lynchburg, Virginia, with manufacturing and field operations activities at its Commercial Nuclear Fuel Plant (CNFP) on Mt. Athos Road, just outside of Lynchburg.

0.2 RESPONSIBILITY l

The President of BWFC has the overall responsibility for the quality of work.

The Manager of Quality Assurance is responsible I

for developing this QAP and assuring its proper implementation.

All personnel are responsible for implementing this QAP for work they perform.

O.3 MANUAL REVISION POLIQX The Manager of Quality Assurance (QA) is responsible for the preparation, maintenance, and revision of this Manual.

The President, the Manager of QA, and the affected staff managers sign and date the Table of Contents of the Manual as evidence of their approval.

A sequential numbering system by release number is used to indicate the Manual effective date.

The Manual is authorized for use on the ctfectivo date and shall be implem9nted within sixty days of that date.

Page 1 of 2 l

,~,

BuW FUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICE $

rhECTION SUBJECT REVISION NO.

NO.

O INTRODUCTION 2

This Manual is reviewed once each calendar year by QA end revised as necessary to assure that it continues to accurately describe the BWFC QAP.

All revisions are prepared by CA and distributed to af fected staf f managerc for review and concurrence.

Results of this review are documented on the Table of Contents by their signatures.

As organizational changes occur, the Manager of QA, or his designee, will notify holders of controlled Manuals of changes that af fect the QAP.

These changes will be incorporated into the Manual during subsequent revisions.

Revisions to this Manual are made by section.

The Manual section revision will be indicated on the Table of Contents.

When a change is made to this Manual, the revised section(s) and a revised Table of Contents will be issued.

The latest changes will be identified by the revision number in the margin opposite the first line of the paragraph changed.

Each revised section will have a higher revision number written on all pages of the section.

When a section is revised extensively, the words " Complete Revision" will be typed in the upper rigVc corner of the first page of the section in place of the margin notations.

This option may also be used for pages that are revised extensively.

In the event this Manual is revised in its entirety, the Table of Contents will indicate this and no notations will be included in individual sections.

O.4 MANUAL ASSIGNMENTS All copies of this M3nual are issued and plainly identified as either " controlled" or " uncontrolled" on the Manual cover page.

0.4.1 Controlled Manuals L

Controlled copies of this Manual are distributed to convenient manual stations located within BWFC.

QA distributes controlled copies to selected BWFC employees and to organizations outside of BWFC.

Individual Manual holders are listed on a controlled distribution list maintained by QA.

QA is responsible for keeping this list up-to-date and for sending any Manual revisions to individuals on the distribution list.

p.4.2 Uncontrolled Manuals Uncontrolled Manuals are issued for information only and will not be kept up-to-date.

Page 2 of 2

B&WFUEL COMPANY QUAUTY ASSURANCE PROGRAM l

SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT I REVISION d-1 ORGANIZATION 2

f 1.1 B&W FUEL COMPANY (FIGURE 1.1)

B&W Puel Company (BWFC) is a partnership in which Babcock & Wilcox (B&W) owns a 51% majority interest.

A French consortium composed of Cogema, Inc., Framatome, and Uranium Pechiney have a minority interest of 49%.

The President of BWFC reports to a partnership board.

The BWFC organizations involved in this QAP are shown in Figure 1.1 and described below.

1.1.1 Soent Fuel & Waste Technoloav Services (SFWTS)

The Manager of SFWTS reporto to the President of the B&W Puel Company.

The President has delegated to the Manager of SFWTS the responsibility for the quality assurance, project management, engineering, and manufacturing of items and services related to the handling, transportation, storage, and disposal of spent fuel and other radioactive waste.

The Manager of SFWTS assigns Project Managers to manage SFWTS contracts.

They are responsible for coordination and monitoring of contract activities including licensing and engineering activities, subcontractor selection, determining the personnel assigned to the various functional groups under their management and for implementing the necessary cost, schedule, and quality assurance mechanisms to ensure performance on their contracts.

They may also function as the cognizant Engineering or Technical Manager for the performance of technical activities such as those described in Section 1.1.2.

These activities may be performed within the project organization or by functional units under the direction of the Project Manager.

1.1.2 Fuel Enaineerina The Manager of Fuel Engineering reports to the President and is responsible for (as may be assigned):

(a)

Design of SFWTS components such as casks or canisters for transportation or storage of spent fuel or other radioactive l

waste and associated equipment including computer program analytical model development and verification as well as preparation of Design Requirements DocumentM, Design Analysis and Verification Documents, Manufacturing Specifications and

Drawings, Procurement Authorizations, and Release Authorizations to CNFP.

(b)

Design Analysis (nuclear, thermal, hydraulic, mechanical) including computer program analytical model development and Page 1 of 6

B&W FUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

1 ORGANIZATION 2

verification as well as preparation of Topical Reports for Licensing.

(c)

New Product Design including Research and Development activities.

1.1.3 Commercial Nuclear Fuel Plant (CNfP) (Ficure 1.2)

The Manager of CNFP reports to the President.

CNFP is the manufacturing and field operations arm of BWFC and as such, the Manager of CNFP is responsible for the procurement, fabrication, assembly, and inspection of BWFC manufactured products and design, construction, deployment, and operation of BWFC field service equipment.

As determined by the Manager of SFWTS, CNFP may be involved in the fabrication of SFWTS items and in the supply of other services.

The Manager of CNFP, through his staff managers and the Manager of CNFP Quality & Safety, is also responsible for:

(a)

Development and implementation of processes and equipment which will produce and confirm the required level of quality.

(b)

Establishment of process control points and inspection requirements to insure product conformance to applicable requirements.

(c)

Performance of inspection and verification activities to confirm that an activity has been correctly performed.

1.1.4 Ouality Assurance (Ficure 1.2)

The Manager of QA reports to the President.

He directs the QA activities summarized in Figure 1.2 and assures compliance with the Statement of Policy and Authority in the front of this Manual.

The structure and functional responsibilities of the QA organization are shown in Figure 1.2.

Page 2 of 6

B&WRJEL COMPANY l

QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJEC1 REVISION No.

, yo.

1 ORGANIEATION 2

1.1.4.1 Qua ity & Safety (Picure 1.2)

The Manager of Quality & Safety (Q&S) reports to the Manager of CNFP.

He has the responsibility for iuplementing this QAP in the manufacturing and field operations of CNFP through separate QA plans approved by the Manager of QA.

The Manager of Q&S is independent of other CNFP operations, thus assuring his independence in carrying out the functions of checking, inspecting, or otherwise verifying that work has been performed satisf actorily and that the product or service conforms to applicable regirements.

He has the authority to withhold from further processing any items which do not meet applicable requirements..

The structure and functional responsibilities of the Q&S organization are shown in Figure 1.2.

1.2 B&W NUCLEAR SERVICE COMPANY (FIGURE M The B&W Nuclear Service Company (BWHS) is a major supplier of items and services to nuclear power plants.

It is headquartered at the same location as BWFC and provides certain services to BWFC under a cervices agreement.

These services are:

Document Control <and Records Management, Employee Relations, Engineering Services, and Nondestructive Examination Services.

These services are performed in accordance with the requirements of this Manual and are audited by BWFC QA as part of the internal audit program described in Section 18.

BWNS organizations involved in providing these services are shown in Figure 1.3.

Page 3 of 6

B&WNJEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SLCilON.

SUBJECT REVISION l

NO.

NO.

1 ORGANISATION 2

i PAttattlpit kup i

PettlDENT l

. n u i, irini,Utt Am.,

A=..

l WAlft itCNuoLOGY litvlCtl Futt thGibitRING CapettRICAL IUCLtAR FutL QUAlltf A$$URANCE PLAkt (CafP) l

- s rI w.,.s t

(

I'IGURE 1.1: B&W IH L COMPANY l

t t

i Page 4 of 6

..~

r

(.

h~

BSWFUEL COMPANY a

QUALITY AS$URANCE PROGRAM ADDENDUM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

1 ORGANI2ATION 2

eIAe4Gle, Mantle.

MLlff 4 larlff MLlff 48&4482 mamelf t, antage t, Cert guallf t toGlotte taittf

$tMC mentiff teGlotte

eisaarde, Det A tweLustich leapt (110h Ptff0stimeCF ApelittlfeATOR Pe0Jtti ta

= tif t (t4

= letelvirg inspectlen

= 640 Proerea

= W A.sHt Preeres

= b tiernastp91 erit

= Sel8C hlity Pir

- twatits toneeses

= in procese inseettien

= Capit4L Projette

  • Aditor tellfisellen

= W tragendres a tuaitty lagrevement trej

= leert tre 6heett

= finst Inspectlen

= 1meettlen Presmasrea

= leapiler twelettere

= W frelateg

= RA topical toport

= termente. (estrelleevlbe

= heresentegitive lash.

= esteset'en of to SW6p.

= l@tler lagrevasorit

= Statistitet bothees

= Crittest &

= DustIty lagreveseh4/ Cent

= IISTI Centrol

= lethnitel (gregitet ten

= 5 gplier $legge List

= prescoe (entrol

= e4D freject W

= treriefere/Uggrenset

= instettlen treretheres

= 8tatistiset tantrees

  • Perferetrue lsultestere

= le Altog plans

= 9tet CnC

  • $es. Anprovell/lJanittel
  • l'etef ter beellfleet ten

= lechnigel $evlown

= (stemer helettau

= leghnleel tevleus

= Pressement beggagent $es

= PO teview

= lettino6el testows

- testemer Anellte a testiel Aestreorite

= telease Author, tevlev

= licentier teletters

= hotellurgttet Leb firehr4 hosennees

= Atelgruel hiellte

= Del Partitleotten a

= eeterea

= Correttive Attlen

= &aslity test

= Project tt Piers /trescal.

= GC tecuire enas

= celeser est sevici,

  • Cetener Centract leviser

= Ase ttned he 'Its TIGUHE 1.28 QtALITY ASSURAM2 OECANITATICN

= ta teosteeminie l

l 1

i l'

i Page 5 of 6 i

B&WNIEL CO&PANY QUALITY ASSURANCE PROGRAM t

bPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECi REVISION NO.

NO.

1 ORGANIEATION 2

r r

L PelllMt1 b4W W XLLAR SCtvitt CO.

Vltt*Pt!5tDENT CNitt ADalktlftativt Vitt Petl!Nat tuCIWtittuG & PLANT Offittt, ADMihiliAATIDu

$>tCIAL PRODUCil &

1 Stevitt3 Olvil10h DEPAtintut itSPECTION SitVitts DIVill0m

- NDE Persomel and

- besten Analysis

- ProceWre Duellficetten

- Consuter Programnint

= ttskh Current)

- Craphic besten

- NDE Personnel and

- Proce ere Ouellfication

- Processing af P.ellsin.

NAh4GER, MANAGER,

= laf ety Cana,rns EMPLotti ttLAfinus PURCHAllWG &

ADNittlitAllvt SilvlCll

- Position Descriptions

- fretnint becortes hkh4 Git.

DECORDS NAhAGEMENT

- Document Control

- Recortes management FIGJRE 1.48 B&W NILEAR SERVICE COMPANY (ORGANIZATICNS SUPPORIDC BWFC)

Page 6 of 6

1 l

B&WFUEL COMPANY QUAUTY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

2 QUALITY ASSURANCE PAOGRAM 2

2m 1 SCOPE This Quality Assurance Program (QAP) takes into account the prerequisites for achieving

quality, such as the need for specialized equipment and skills; use of suitable administrative, process, and environmental controls; training and indoctrination of personnel performing activities affecting quality; and the need for verification of quality by inspection and test.

It also provides for the development, control and use of computer programs.

The classification of items and services as safety related is made and documented by the responsible engineering and project management functions.

The criteria for determining this classification is defined in Appendix C and is contained in a BWFC procedure which is based on Regulatory Guide 1.26 and which makes allowances for consideration of other criteria that

..ay be specified by contract.

The criteria for classification corresponds to DOE Documents DOE /RW-0032 and DOE /RW-0103 as follows:

(a)

Safety related (DOE Quality Levels 1 & 2):

Items or services that have significant potential impact on public radiological healch and safety; and/or potential impact on public and/or occupational radiological health as required by 10CFR20; public and occupational

safety, and/or the attainment of other major programmatic objectives (e.g. cost-benefit optimization, schedule maintenance, environmental protection, etc.) are classified as safety related and are controlled under the provisions of this Manual.

(b)

Non Safety related (DOE Quality Level 3):

i Items or services that have minor or no potential impact on the factors identified above for the safety related l

classification are classified as non-safety related and are, as a minimum, controlled by assurance measures in accordance with good management, engineering, or laboratory practices e s

(

discussed in Addendum A to this Manual.

{

Page 1 of 5

B&WMlEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEh 4 WASTE TECHNOLOGY SERVICES SEC180N SUBJECT l REVISION i

NO.

NO.

2 QUALITY ASSURANCE PROGRAM 2

The safety /non-safety related classification of an item or service is included in the design and procurement documents discutsed in Sections 3 and 4 of this Manual.

f 2.2 OAP REOUIREMENTS This QAP is organized and administered to comply withs (a) 10CFR Part 50:

Appendit A - General Design Criteria I (1);

Appendix B; 50.55 (a); and 50.55 (e).

(b) 10CFR Part 21 and 10CFR Part 71.

(c)

Quality Assurance related !;RC Regulatory Guide commitments as described in Appendix A of this manual.

(d)

ANSI /ASME N45.2 and its daughter standards and/or ANSI /ASME NQA-1 (as specified by contract).

(e)

NRC accepted BWFC QA Topical Report 10096A.

(f) other quality requirements as may be imposed oy contract such as DOE documents DOE 5700.6b, DOE /RW-0032 & DOE /RW-0103.

2.3 OAP IMPLEMENTATLQli This QAP establishes and maintains standards of quality through the development and use of quality engineering and manut'acturing practices, which are documented by written policies, procedures, l

an'_ instructions. These policies, procedures, and instructions are l

controlled as described in Sections 5 and 6 and they have been coordinated with and are mandatory for each of the organizations within BWFC.

Typical policies, procedures, and instructions that implement this QAP are referenced in Appendix B.

BWFC may add, modify, and/or delete the referenced policies, procedures, and instructions without changing the intent of the QAP.

Therefore, the Manual references should only be considered as representative and they l

will be updated, as necessary during subsequent revisions of this l

Manual.

The requirements of this QAP are implemented by CNFP through separate QA plans for its manufacturing and field operations.

Page 2 of 5

B&W FUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION

$UBJECT REV ION NO.

2 QUALITY ASSURAWCi; PROGRAM 2

These QA plans are approved by the Managers of Quality & Safety, and Quality Assurance, and the CNFP Plant Manager.

Field operations may be performed in accordance with the customer's site QA program or under the CNFP QA plan or a combination of both as may be required by the customer.

QA personnel are charged with escalating to the Manager of QA, for resolution, any quality related problems that cannot be resolved at their level.

In turn, the Manager of QA will escalate to the President any quality related problems that he cannot satisfactorily resolve.

Authority to temporarily deviate from this QAP or from any referenced policy, procedures, or instruction is reserved for the President.

Such deviation shall be documented and approved by the President and distributed to affected organizations.

2.4 OAP ASSESSMENT Assessments of the scope, status, adequacy, and compliance of this QAP with Appendix B of 10CFR50 and other QAP commitments are performed by BWFC staff management in several ways.

This Manual is evaluated once every calendar year by the Manager of QA and updated to incorporate any administrative or operational changes necessary to ensure that it accurately describes the QAP.

During this evaluation, the Manager of QA solicita input from affected staff managers as to the

status, adequacy, and effectiveness of that part of the QA Program for which they have been designated responsibility.

In addition, at the direction of the President, an independent audit of the functions of BWFC QA is performed by qualified auditors once each calendar year and the results of this audit are provided to the President and to the Manager of QA.

The. President also conducts staff meetings periodically, during which each staff manager, including the Manager of QA, presents the status of activities within his organization and any problems that require resolutions by BWFC management.

In addition, written monthly reports are made by each staff manager describing their significant activities and problems during the month.

The President also receives copies of the results of internal audits performed by QA.

Page 3 of 5

B&W FUEL COMPANY QUALITY ASSURANCE PROGkAM ADDENDUM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REW810N NO NO 2

QUALITY ASSURANCE PROGRAM 2

The President, through customer feedback, personal observations, staf f meetings, monthly reports, annual evaluations, and audit reports, assures himself of the adequacy and effectiveness of this QAP.

1 2.5 OAP INDOCTRINATION AND_ TRAINING 2.5.1 BWFC Personnel Indoctrination and tra.

Ag in the requirements of this QAP are provided to all affectv.1 personnel.

This indoctrination and training is conducted 14 accordance with written procedures and includes instruction as to the purpose, scope, and implementation of the quality related

manuals, policies, procedures, and instructions.

2.5.2 OA Personnel In addition to the indoctrination and training described above, personnel performing inspection, surveillance, and audit activities are qualified and this qualification is conducted and documented in accordance with the applicable requirements of the codes, standards, and regulatory requirements listed in Section 2.2.

2.6 Ouality Assurance Manaaement Information The QA Manager, othcr involved Staff Managers provide the following information, as appropriate, to the President and other involved managers through their Monthly Activities Reports:

(a)

Status of development of QA plans and procedures.

(b)

Significant qual: ty problems and unusual occurrences and their resolution status.

(c)

QA management practices and improvements l

(d)

Quality verification results, including significant findings l

and their resolution.

(e)

Quality performance trend analysis results (f)

Status of holds.

QA management information, including the interpretation of QA requirements, exemplary and innovative QA practices, and lessons to be learned from significant quality problems and unusual occurrences are, as appropriato, disseminated by the QA Manager to all affected organizations.

Page 4 of 5

BBW RIEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT RE 10N NO.

2 QUALITY ASSURANCE PROGRAN 2

The Manager of STWTS provides the following information, based upon input from the QA Manager, and other involved managers, to the Customer.

(a)

Controlled copy of this OA Manual when requested.

Referenced procedures are available for review at BWFC offices.

(b)

Copies of QA audit schedules, audit reports, and related correspondence are available for review at BWFC offices.

(c)

Copies of summary reports on significant quality problems, unusual occurrences,

issues, and their resolution or corrective action status.

(d)

Reports on the status, adequacy, and effectiveness of the QA program are available for review at BWFC offices.

This information may be included in monthly activities reports, audit reports, or management assessment reports.

Page 5 of 5

B&W FUEL COMPANY QUALITY ASSURANCE PROGRAM i

l SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REvist0N 1

NO.

NO 3

DESIGN CONTROL 2

3.1 SCOPE Design control measures are applied to all items and services as defined in written procedures and instructions.

3.2 DESIGN DOCUMENTS J

Procedures have been established for the preparation and review of design documents, including the correct translation of applicable Regulatory requirements and design bases into

design, and procurement documents.

Included are such activities as

physics, seismic,
stress, thermal, hydraulic, radiation, and accident analyses; associated computer programs; compatibility of materials; accessibility for in-service inspection, maintenance, and repair; and quality standards.

As determined by the cognizant Project Manager, engineering units within a project or functional organization are responsible for the preparation,

review, approval, and verification of design documents.

Design documents include such documents as system descriptions, drawings, analyses, computer program documentation, and specifications.

These documents specify technical and quality requirements appropriato.to the activities they cover.

They are independently reviewed for completeness and technical accuracy as i

described in Section 3.4.1.

Quality Assurance provides an overview of design documents during QA audits, and reviews design documents such as drawings and specifications used as procurement documents or as CNFP manufacturing requirements for the inclusion of appropriate QA requirements.

Errors and deficiencies in approved design documents, including design methods such as computer programs that could adversely affect safety related items and services, are documented and corrected.

Deviations from specified quality standards are identified and controlled in accordance with written procedures.

3.3 DESIGN INTERFACES l

Procedures establish methods for the identification and control of design interfaces and for their coordination among participating design organizations.

These 7rocedures establish methods for 1

Page 1 of 4 i

l~

B&WFUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUdJECT REVISION I I

NO.

NO.

3 DESIGN CONTROL 2

review, approval, release, distribution, and revision of documents in accordance with contract terms.

The Project Managers coordinate design interfaces with the Customer.

3.4 DESIGN VERIFICATION Procedures are provideu to assure verification of designs.

Verification methods include independent review of design documents, design analyses (calculations), design review boards, and design verification testing.

The design organization determines design verification methods to be used.

3.4.1 Indeoendent Review of Desian Documents l

All design documents are independently reviewed for completeness and technical accuracy.

The reviewer may be any technically qualified indP";ual other than the preparer of the document.

In certain instances, the reviewer may be the preparer's supervisor or manager as explained in the BWFC position on Regulatory Guides 1.28 (Rev 3) and 1.64 (Rev 2) contained in Appendix A.

3.4.2 Desian Analysag Design analyses (calculations) are used to establish design requirements or to verify the design.

The analyst is required to I

document the calculations as to purpose, assumptions, method, input data, results, and conclusions in such a manner that an independent reviewer can verify its cechnical accuracy independent of the analyst.

Design analyses are checked by independent reviewers who are competent in the particular type of analysis being checked.

Computer programs used for design analyses are verified and certified for use.

3.4.3 Desian Review Boards (DRB)

DRBs are convened and conducted in accordance with written procedures which define the conditions under which DRBs are held and the topics to be considered.

They are convened for new designs and major changes to existing designs as determined by responsible Engineering and Project Managers.

Page 2 of 4

B&W MML COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REV ION NO 3

DESIGN CONTROL 2

DRBs consist of a Chairman and othcr members, as required, who are technically competent but are independent of ths design under review.

QA representation on DRBs is optional and is at the discretion of the Manager of QA.

A DRB verifies the adequacy of a design by assuring that it is based on sound technical principles and that it meets specified requirements.

DRBs may be conducted at the conceptual, preliminary, and/or final design stages.

In any event, they are completed, as appropriate, prior to release for procurement, manufacture, shipment, or to another organization for use in other design activities.

In those cases where this timing cannot be met, completion of portions of the DRB may be deferred, provided that the justification for this action is documented and the unreviewed portions of a design are identified and controlled.

Results of DRBs are documented and the responsible engineering manager must resolve DRB comments, as necessary, to close out the DRB.

3.4.4 Desian Veri fication Testina Design verification by testing is used whenever engineering judgment leads to the conclusion that design analyses or previous experience cannot substantiate a design or design feature.

It includes testing under the design conditions as described in Regulatory Guide 1.64 (see Appendix A).

Design verification testing is conducted by the test organization using written test procedures which incorporate the requirements of design specifications that establish the design limits of the items or features being tested.

If verification of a design or design feature is solely by test, the testing is conducted under the most adverse design conditions as determined by analysis.

Test results are reviewed by the responsible engineering organization to determine if they verify the design or design feature tested.

3.5 DESIGN CHANGES Design changes, including field changes, are subject to the same design controls that were applicable to the original design and they are documented, reviewed, approved and incorporated into the design documents as described in written procedures.

Page 3 of 4

j B&WFLJEL COMPANY o

QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISIGN NO.

NO 3

DESIGN CONTROL 2

3.6 RELEASE OF DESIGN DOCUMENTS Design documents such as drawings, specifications, and calculations i

are released for use via Document Release Notices (DRN) or Applice.ble Documents Lists (ADL).

DRNs and ADLS are prepared by designated personnel as prescribed by written procedures. Computer programs are released for use upon completion of their certification process as defined in written procedures.

Release Authorizations are used to release CNFP for procurement, manufacturing, and field operations and to define the drawings, specifications, and other information applicable to such operations.

Release Authorizations are prepared by designated personnel, reviewed by Project QA, and approved by the appropriate Project Manager.

l I

l l

l Page 4 of 4 l

1

B&WFUEL CEMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

4 PROCUREMENT DOCUMENT CONTROL 2

4.1 GENERAL i

Procedural controls are established to assure that procurement documents contain appropriate quality, technical, and manufacturing requirements.

4.2 PROCUREMENT PROCESS The technical, manufacturing,

quality, and other requirements prescribed in approved
drawings, specifications, and other documents are transferred into procurement documents by inclusion in or reference on Procurement Authorizations (pas) and CNFP Purchase (Material) Requisitions (prs).

pas and prs are prepared, reviewed, and approved as stipulated in procedures.

Project Managers are authorized to procure items and services directly from other B&W organizations using the PA as the contract with these organizations.

Orders to be placed with all other suppliers are processed through Purchasing.

Purchasing converts the PA or PR into a Purchase Order (PO) or Change Order (CO).

The PO/CO is then sent to the supplier.

4.3 PROCUREMENT DOCUMENT CONTENT Procurement documents include or reference the following information and requirements, as applicable:

(a)

Scope - Statement of the work to be performed.

(b)

Technical Requirements - Drawings, specifications, regulatory requirements,

codes, standards, test and inspection requirements including acceptance criteria and equipment to be used, and special process instructions for such activities as fabrication, inspection, cleaning, packaging, handling, shipping, and storage.

(c)

Documentation Requirements Identification of supplier documents and records to be prepared, maintained, submitted, and made available for BWFC review and/or approval.

Such documents and records include:

drawings, specifications, procedures, inspection and fabrication plans, inspection and test records, personnel and procedure qualifications, material chemical and physical test results, and product certificates of conformance.

Page 1 of 2

B&W FUEL COMPANY QUAUTY ASSURANCE PROGRAM I

SPENT FUEL & WASTE TECHNOLOGY SERVICES l

SECTION SU3 JECT REVISION NO.

NO.

4 PROCUREMENT DOCUMENT CONTROL 2

I

(

(d)

QA Program Requirements - Identification of the requirements of the BWFC quality specifications such as Specification 09-1212 to be met by the supplier.

These quality specifications address all 18 criteria of 10CFR50 Appendix B.

1 Identification of source (e)

Source Inspection Audit inspection and audit requirements including right of access to the supplier's (and his subtiers) facilities and records for source inspection and audit.

Extension of applicable procurement (f)

Subtier Procurements l

document requirements to lower tier procurenents.

(g)

Nonconformances - Requirements for the reporting to BWFC and l

approval of supplier nonconformances by BWFC.

4.4 PROCUREMENT DOCUMENT REVIEW Procedures are established for the review of procurement documents i

l by the appropriate quality organization to determine that quality requirements are correctly stated, inspectable, and controllable; l

that there are adequate acceptance and rejection criteria; that the procurement documents have been prepared, reviewed, and approved in accordance with QAP requirements; and that the supplier has. been evaluated as specified in Section 7.

l l

The quality organizations have the responsibility and authority to order termination or suspension of procurrament sctions when procurement documents conflict with the requirements of the QAP.

l Such orders will indicate the action to be taken to allow resumption or reinstatement of the procurement activity.

t 4.5 CHANGES TO PROCUREMENT DOCUMENTS Changes to procurement documents are processed in th9 same manner as the original procurement documents.

1

't Processing and approval of supplier nonconformance that deviate from the procurement document requirements is described in Section 15.

I t

Page 2 of 2 L

B&W FUEL CTMPANY QUALITY ASSURANCE PROGRAM ADDENDUM I' INT FUEL & WASTE TECHNOLOGY SERVICES

~

I SECTION SUBJECT REVISION NO.

NO.

5 INSTRUCTIONS, PROCEDURES, AND DRAWINGS 2

5.1 GENERAL Activities affecting quality are prescribed by documented instructions, procedures, or drawings appropriate to the circumstances and accomplished accordingly.

Procedures are established to assure that instructions, procedures, and drawings include or reference adequate quantitative or qualitative criteria for determining that important activities have been satisfactorily accomplished.

5.2 ADMINISTRATIVE POLICIE

S. PROCEDURE

S, AND INSTRUCTIONS The QAP is implemented through this Manual, CNFP QA Plans, and written adminLstrative policies, procedures, and instructions.

These policios, procedures, and instructions are prepared by responsible personnel, reviewed by other organizations to whom they apply, and then reviewed and approved by the responsible quality organizations for the application of appropriate QA requirements before the documents are approved and distributed for use.

Approved policies, procedures, and instructions are published in manuals maintained current by Quality Assurance.

The manuals are kept at manual stations located throughout BWFC.

Administrative procedures and instructions which pertain only to CNFP are prepared, reviewed, and apprcved as described above.

However, they are controlled, distributed for use, and maintained current by the issuing CNFP organization.

5.3 DRAWINGS AND SPECIFICATIONS Drawings, specifications, and other documents are released for use by CNFP in procurement, manufacturing, and field operations as described in Section 3.6.

Drawings and specifications for CNFP Specialty Manufacturing activities may be included in direct orders from customers.

5.4 MANUFACTURING AND INSPECTION PROCEDURES Manufacturing Engineering and Quality & Safety are responsible, respectively, for the preparation, issuance, distribution, and control of manufacturing process procedures and inspection procedures for items fabricated by CNFP.

These procedures are Page 1 of 2

B&W FUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECil0N SUBJECT REVISION NO.

NO.

5 INSTRUCTIONS, PROCEDURE 8, AND DRAWINGS 2

approved by the Mr.nagers of Fuel Operations and Quality & Safety and by Fuel Engineering, if required by Release Authorizations, i

content of inspection procedures is defined in Section 10.

5.5 MANUFACTURING. INSPECTION. AND TEST PLANS Route Cards are prepared as described Section 14 to define the manufacturing and inspection sequences for items and the applicable drawings, specifications, and procedures to be used in performing the sequences.

Test plans are addressed in Section 11.

l l

l i

l l

Page 2 of 2

-~..

t

..r B&W FUEL COMPANY.

QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION f40.

NO.

6 DOCUMENT CONTROL 2

6.1 GENERAL The following types of documents are prepared, reviewed, approved, and issued in accordance with procedures or.insttJations:

(a)

Design documents (e.g. calculations, drawings, specifications, analyses) including documents related to computer codes, as described in' Sections 3 and 5.

.. )

Procuremon'. documents, ar described in Section 4.

(c)

Instructions and proccuuNs, including Administrative Manuals, this Manual, and procar.ures describing activities affecting quality, as described in Sections 0 and 5.

(d)

Manufacturing and !.nspection procedures and documents, as described in Section 5.

(m)

Reports of nonconformances, as described in Section 15.

Established procedures assure technical adequacy of, and inclusion of appropriate requirements in, the above documents by requiring review by_ qualified reviewers prior to their implementation.

In addition, changes to these documents are processed in the same manner as the original documents and are reviewed / approved by the same organizations or by other qualified organizations when the original organizations no longer exist or are no longer responsible.

6.2 DOCUMENT CONTROL SYSTEM BWFC operates a document control system that identifies and reports the status of contract documentation that is originated by BWFC or received from suppliers and/or customers.

Documents are received, reviewed, assigned an approval status, released, and distributed by authorized personnel to individuals and locationis requiring the documents in the execution of their assigned responsibilities.

Written procedures provide for the preparation of master lists identifying the current revision numbers of approved and released documents.

These lists are updated by the controlling organizations and distributed to user organizations on an as needed basis.

l Page 1 of 2 i

l l

l

\\

\\

~

a B&WFUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

- NO.

6 DOCUMENT CONTROL 2

The use of obsolete or superceded documents is controlled by requiring personnel to refer to the document master lists to determine the current revisions of documents applicable to their work.

6.3 DOCUMENT SUBMITTAL pONTROL Project Managers reviaw customer contracts for any customer required document submittals.

The required documents are produced by the responsible organizations and transmitted to the customers l

by the Project Managers.

t Specification and drawings released (See Section 5) to-CNFP for fabrication of items or supply of services are reviewed by Q&S for required document submittals and Q&S identifies such submittals in Contract Submittal Requirements.

The required documents are produced by the responsible organizations and transmitted to the requesting organizations via Concurrence Requests.

Required supplier documentation submittals are identified in procurement documents (Refer to Section 4).

t

)

Page 2 of 2 1

BSW FUEL COMPANY

- QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION '

NO.

7 CONTROL OF PURCHASED ITEMS & SERVICES 2

1 7.1 GENERAL As a function of the overall QA Audit Program, QA avaluat:s the

[-

capability of suppliers of safety related items and services and maintains a list of approved suppliers.

The list is supported by pre-award evaluations and periodic supplier quality program audits.

BWFC exercises control over each supplier by (1) imposing QA program requirements on the supplier through the procurement documents, (2) performing QA audits of the supplier's QA Program, (3) monitoring of the procurement process for compliance with L

procedures, (4) source inspection or surveillance at the supplier's facility (as deemed necessary or appropriate), and (5) receiving inspection at CNFP (for items to be used by CNFP).

7.2 SUPPLIER EVALUATION AND SELECTION When soliciting bids, Purchasing reviews the approved supplier list (See Section 7.3) for possible suppliers to whom an inquiry will be forwarded, as necessary; taking into consideration the supplier's past performance and quality history.

Supplier responses to requests for bids are reviewed to determine overall acceptability of the supplier.

Exceptions to QA requirements are reviewed by QA.

In the event an inquiry is sent to a supplier that has not been approved by QA, QA will be advised of this and a pre-award audit may be required.

Purchasing will not place a safety related-order with a supplier until such supplier has been evaluated by QA and approved for order placement.

The evaluation of suppliers before the award-of a contract and during contract performance is accomplished in accordance with Section 18.

The acceptability of suppliers of safety related items and/or services is based on one or more of the following items:

(a)

The current ability of the supplier to comply with _ QA requirements applicable to the type of items and/or services being procured.

(b)

A review of previous records and performance of suppliers 4 c have supplied items and/or services similar to the type being procured.

(c)

A survey / audit of the supplier's facility and/or an evaluation of their QA program, when no previous quality records are Page 1 of 5

==

m E-6

H

'a 4

B&W FUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

7 CONTROL OF PURCKASED ITEMS & SERVICES 2

available, to determine the capability to supply items and/or services meeting all procurement document requirements.

In addition, suppliers approved by companies or divisions within B&W may be accepted by QA as a supplier of safety related items and/or services.

In this case, QA reviews the audit checklist, auditor qualifications, and audit reports to assure conformance with BWFC requirements.

QA also verifies that the audit covered the scope of work required by BWFC ar i that the supplier was approved with any findings resolved.

A copy of the audit report, audit checklist, and auditor qualification is maintained in the QA audit files.

7.2.1 Dedication of Commercial Grade Items and/or Services Commercial grade items and/or services for use in safety related applications may be procured from suppliers where specific quality controls for nuclear applications cannot be imposed in a

practicable ' manner.

In these instances, an evaluation of the suitability of the item or service for nuclear applications is performed by the responsible engineering organizations and/or QA.

The critical characteristics of the item or service are also determined and documented as part of this evaluation.

Special methods may be needed for verification of these critical characteristics and they may be established by QA to provide assurance that the item or service specified is the item or service received.

If needed, these special quality verification methods may include inspections, tests, or commercial grade surveys or evaluations of the supplier.

Suppliers of commercial grade items and/or services need not appear on the approved supplier list.

7.3 APPROVED SUPPLIER LIST Suppliers meeting the criteria described in Section 7.2 are included in the Supplier Status List issued by the Quality Performance Administrator or in the Approved Supplier List issued by the Manager of Project Quality assurance.

Purchasing must select suppliers from these lists for placement of orders that impose safety related requirements on the suppliers.

The particular buyer will assure that the selected supplier is approved for the quality requirements specified in the procurement documents, and for the types of items and/or services to be supplied.

Page 2 of 5

.. ~

B&W FUEL COMPANY QUALITY ASSURANCE PROGRAM l

SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

7.

CONTROL OF PURCHASED ITEMS & SERVICED 2

These lists are updated quarterly to include 'new suppliers considered to be approved or to delete any supplier considered to be disapproved or inactive.

Interim changes are made by memo or copy of audit reports to appropriate personnel.

Suppliers of items and services remain on these lists as long as they maintain an acceptable quality of performance and they.

continue to satisfy the criteria of audits.

7.4 PROCUREMENT PROCESS MONITORING Procurement documents are reviewed by quality organizations as descJibed in Section 4.

In addition, periodic internal audits of the procurement process are performed as described in Section 18.

7.5 SOURCE INSPECTION OR SURVEILLANCE Source inspection or surveillance requirements are established by the responsible quality organization using written criteria during-the review of procurement documents.

The degree of inspection or surveillance depends upon the importance and complexity of an item, past supplier performance, and practicality of receipt inspection.

L The source inspection or surveillance requirements for an item are documented and transmitted to a supplier as part of the procurement documents.

The inspection / surveillance requirements for an item I

indicate the BWFC inspection, witness, anofor hold points, as kell as any customer designated points.

Visits to the supplier by quality representatives are made to carry out the inspection / surveillance requirements.

An inspection report, prepared in accordance with written procedures, is made for i.

each visit.

Nonconformances detected during an inspection /

surveillance visit are described in the inspection report.

If the L

supplier elects to disposition a nonconformances by rework or L

replacement, this is so noted in the inspection report, and the l

supplier documents the nonconformances as prescribed by his. QA l

program.

For those nonconformances where the supplier chooses to disposition by repair or use-as-is, this is so noted in the i

inspection report, and the supplier submits a written request to BWFC for spproval of such disposition as described in Section 15.4(a).

Re-inspection or retest by the supplier may be required when inspection or test results appear questionable or additional data are required.

Re-inspection / test may be observed by the quality Page 3 of 5

BGWFUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVIStON NO. -

NO.

7 CONTROL OF PURCHASED ITEMS & SERVICES 2

representative to clear a nonconformance.

Re-inspections / tests are conducted in accordance with the original inspection / test requirements.

7.6 RECEIVING INSPECTION Incoming items received at CNFP or at suppliers for use in safety related applicat!

"s undergo a receiving inspection by inspection personnel prior the release of such items for further processing.

Rece.

'w inspections may be conducted on an individual item or san + 'ng basis.

Sampling for receiving inspection operations may be performed in accordance with MIL-STD-105D or alternate written sampling plans.

l Receiving inspections are conducted as specified in written procedu'.ss or instructions which cover the type of test. or inspection (i.e.,

visual, dimensional,
chemical, physical) applicable to the item or lot being received.

The choica nf the type of inspection or test and the data to be generated is made based upon the procurement document requirements and the requirements of applicable drawings and specifications.

In l

addition, received items are inspected for shipping damage, proper identification, and appropriate cleanliness.

Concurrent with the receiving inspection, the quality organization "arifies that all supplier documentation required by the procurement documents to be submitted has been reviewed by the appropriate organizations for completeness and compliance with l

requirements.

l l

Accepted items are identified as to their inspection status and I

released by the quality organization for further processing.

Nonconforming items are clearly identifie.1 and are segregated or otherwise controlled until proper disposit. ion is made as described in Section 15.

7.7 CERTIFICATES OF CONFORMANCES/OA DATA PACKAGES For items designed by BWFC and manufactured within BWFC by CNFP or i

by suppliers, the Project Manager furnishes the customer with a QA l

Data Package that provides objective evidence that the items meet the requirements of the customer's order.

As a minimum, the QA Data Package consists of a Certificate of Conformance signed by

'the Manager of Project QA.

Other supporting documentation may be included as required by the customer's order.

Page 4 of 5 l

l 1

B&WFUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SEC110N SUBJECT REVISION NO.

NO.

7 CONTROL OF PURCHASED ITEMS & SERVICES' 2

'I 1

For items manufactured by CNFP to the requirements of direct customer orders, the 2ht:a information is supplied to the customer by the Manager of_Q&s, F

l j

l' l

i l'

l Page 5 of 5

BSW FUEL 90MPANY c

- QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECil0N SUBJECT REV SION NO.

S IDENTIFICATION AND CONTROL OF ITEMS 2

8.1 GENERAL Procedures are established by BWFC for the identification and control of items to assure that:

(a).Only correct and accepted items are used. Nonconforming items are identified and segregated from acceptable items.

(b)

Identification and traceability of items is maintained from receipt through storage, processing, and assembly to final acceptance of complete items.

(c)

Correct identification of items is verified and documented prior to release for fabrication, assembly, or shipment.

(d)

Identification of items can be traced to applicable documentation such as drawings, specifications, procurement documente, manufacturing and inspection documents, nonconformance

reports, and physical and chemical test reports.

(e)

Items are identified by heat number, part number, serial number, lot number, or other means either on the item or on records traceable to the item.

(f)

Identification methods used are not detrimental to the item.

(g)

Physical identification is used 'whenever possible.

Where physical identification is either impractical or insuf ficient, phycical separation, procedural controls or other means is employed.

Task, group, and sequence numbers as well as part numbers are assigned by the responsible BWFC organizations to all items supplied by BWFC.

Theso numbers are used to identify the items and for the association of documents to the items for which they are applicable.

8.2 IMPLEMENTATION The identification of items manufactured by CNFP is established using the identification requirements contained in Release Authorizations, direct customer

orders, and/or in internal procedures.

Control and traceability are maintained by means of Page 1 of 2

_....__...__.,...___..._.i

_~

B&W FUEL COMPANY.

QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION t

' NO.

NO.

8 IDENTIFICATION AND CONTROL OF ITEMS 2

documentation covering the manufacturing and inspection operations' in accordance with the requirements of Section 8.1.

CNFP operates under a-Release ' Point System that provides a continuous audit of the various materials and components from their initial receipt, processing through the plant, and finally through a QA hold and requires a release ~ Each release point is in effect release for packaging and storage.

document from Data Evaluation prior to continuation of processing or shipment.

Stppliers may use the BWFC assigned identification numbers in co1 junction with their own identification system during design, procurement, fabrication and shipping.

If the supplier uses his identification and control system, he must be able to demonstrate traceability of his number to the BWFC assigned identification number.

i i

l' 1

i Page 2 of 2

m CGNilFUEL COM2'ANY QUALITY ASSURANCE. PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO:

9 CONTROL OF PROCESSES 2

9.1 GENERAL Written-procedures and procurement documents establish the requirements for-the control of special processes used in the manufacture or inspection of items.

Special processes as defined In Appendix C include welding, heat treating, and nondestructive examination.. Cleaning is considered to be a special process when exceptional and unusual care in cleaning is necessary as defined 3

in the applicable drawings and specifications.

l Special processes are controlled to ensure the following:

(a)

Special process procedures (including changes) are approved l

by the responsible engineering and quality organizations when required by the applicable drawings, specifications, and procurement documents.

(b)

Special process precedures incorporate applicable codes,-

standards, and other regulatory requirements.

l (c)

Special processes are performed in accordance with qualified, approved procedures using apprcved methods and materials, j

utilizing personnel and equipment qualified in accordance with

(-

applicable codes or standards.

4

.(d)

Records of-procedure,

process, operator, and equipment-qualification and-approval are maintained and available for l

review.

(e).Special processes are accomplished with written process y

sheets, shop procedures, checklists, travelers, or equivalent that provide adequate space for recording evidence of l

verification.

L L

9.2 IMPLEMENTATION 1

Q&S and Manufacturing Engineering are responsible for the preparation of special process procedures and their related j

qualification procedures including the qualification of personnel L

and equipment.

Qualification is performed when it is required by l.

the applicable drawings and specifications or when deemed necessary l

by Q&S or Manufacturing Engineering.

l L

Page 1 of 2 L

u C&W FUEL dOMPANY QUALITY ASSURANCE PROGRAM ADDENDUM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION 4

NO.

NO.

9 CONTROL OF PROCESSES 2

Special process proceduros and their related qualification procedures encompass the requirements of Section 9.1 and are reviewed and approved by the Manager of Q&S and Fuel Operations and by the responsible engineering organization as required by Rclease Authorizations.

l i

l.

1 i

l Page 2 of 2 1

o.

BSIAf FUEL COMPAniY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

10 INSPECTION 2

10.1 GENERAL Inspect'ons of items for acceptability are performed.

The i

inspection functions operate in accordance with written procedures and utilize personnel trained and qualified in accordance with applicable standards.

Program procedures provide criteria for determining the accuracy requirements of inspection equipment and criteria for determining when inspections are required or define how and when inspections are performed.

In

addition, the inspection programs provide for the following:

(a)

The cognizant quality organization participates in the establishment and implementation of inspection programs for specific items.

(b)

Inspection personnel are independent from the individual or group performing the activity being inspected and have no

-co'..flict of interest with cost and schedule.

(c)

Inspection procedures or instructions are available for use, along with necessary drawings and specifications, prior to each inspqction operation.

In addition, inspection equipment is within calibration prior to an inspection'vecration.

(d)

Reworked, repaired, and replacement - items are inspected in accordance with the original inspection requirements or acceptable alternatives.

(e)

Inspection results are documented, evaluated.

and their acceptability determined by.

the cognizr..t quality organization.

(f)

Mandatory inspection hold points beyond which work may not proceed until inspected by a

designated inspector are

-identified in pertinent documents.

(g)

Indirect control (by monitoring processing methods, equipment, and personnel) is provided when inspection of processed items-is impractical or disadvantageous.

Both inspection and process monitoring are provided when control is inadequate without both.

Inspection procedures, instructions, and/or checklists are provided and contain or reference the following items:

Page 1 of 2 1

y, B&WFUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

10 INSPECTION 2

(a)

Identification of characteristics-and activities to be inspected 4

including acceptance and rejection criteria.

(b)

A descriptic, of the method of inspection. along with any.

sequential t arations such as operational checks or.

preliminary calibration of setup to be performed by the inspector.

(c)

Identification of the organization / individual responsible for performing the inspection and identification of the required, l

procedures, drawings, and specifications including revisions.

1:

(d)

Types of data to be recorded and number / frequency of measurements to be made along with types of measuring and test equipment to be used including accuracy requirements.

(e)

Conditions to be maintained during the inspection.

(f)

Provisions' for evidence of comparison and: acceptability of each inspection operation including provisions for a record of the results of each inspection operation along with inspector identification and date of inspection.

ll 10.2 IMPLEMENTATION L

l-The CNFP Inspection Program utilizes personnel ' trained and qualified-in accordance with applicable standards and is conducted I

in accordance with documented procedures which incorporate the quality requirements defined in applicable specifications and l

drawings. The procedures and inspection forms encompass receiving, L

in-process and final inspection of items.

These procedures and j

forms include the requirements of Section 10.1.

1 i

l l:

Page 2 of 2

B&W FUEL COMPANY

~

QUAUTY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION

- NO.

NO.

11 TECT CONTROL 2

11.1 GENERAL When engineering

judgment, codes, standards, regulations, or specifications indicate that testing is required, a written test-program is established via test requirements documents by.the responsible engineering organization to ensure conformance with those requirements.

In those cases where design is the responsibility of BWFC suppliers, the requirements for written test programs are imposed on those suppliers through procurement documents.

The test programs describe all required tests, such as prototype

(

qualification tests or design verification tests, to demonstrate-l-

that the items will perform satisfactorily in service.

Whenever i

engineering judgment leads to the conclusion that design analysis i

or previous experience cannot substantiate a design or design l.

feature, design verification testing is conducted as described in l

this section and Section 3.4.4.

[

11.2 IMPLEMENTATION l-Tests may be conducted at CNFP or by BWFC suppliers.

The requirements for such tests are included in test requirements documents prepared by the responsible engineering organization.

These test requirements documents include, as appropriate, the requirements of this section, scope of the test effort, technical requirements, and QA requirements. The test requirements documents are transmitted to CNFP via Release Authorizations or to suppliers i

by the. procurement documents.

l l

The test requirements documents require testing to be performed in j

accordance with written test plans and/or procedures that incorporate or reference the design requirements and-acceptance limits contained in the applicable design documents.

The test plans and/or procedures for tests performed at CNFP are prepared by the responsible engineering organization and those for tests at L

suppliers are prepared by the supplier and approved by the responsible engineering organization.

These plans or procedures provide instructions for performing.the test and include provisions for ensuring that prerequisites for the given test are complied with; that testing methods are provided; that adequate instrumentation is available and used; that testing is performed under suitable environmental conditions; and that necessary monitoring is performed.

l j

Page 1 of 2

B&W FUEL COMPANY

. QUf.i.lTY ASSURANCE PROGRAM.

SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

11 TEST CONTROL 2

Test prerequisites include such items as provisions for hold and notification points for witness by the responsible engineering or quality organizations, the

customer, or authorized agents; calibrated instrumentation; adequate and.

appropriate test equipment-acceptance and' rejection criteria;'use of~ trained and qualified personnel; the condition of test equipment and

. preparation, condition and completeness of the item to be tested; suitable environmental conditions; and provisions for data acquisition, collection, and storage.

The methods of. documenting or recording the test data is indicated.

Test results are documented, evaluated, and their acceptability-determined by the responsible enginearbag or anization to ensure-that the design requirements have been cot, I

Page 2 of 2

~

lX i

B&WFUEL COMPANY

^

QUALITY ASSURANCE PROGRAM.

SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

12 CONTROL OF MEASURING AND TEST EQUIPMENT 2

12.1. GENERAL Ef fective and operational systems for the control, selection, calibration, and maintenance of measuring and test equipment (M&TE) are provided.

Internal procedures and procurement document requirements unsure inclusion of the following in these systems, as appropriate:

(a)

Methods of selection, calibration and control of M&TE.

(b)

Culibration schedules and intervals.

(c)

Availability of procedures and instructions describing the calibration techniques, calibration f requency,. maintenance and control of M&TE, tools, gages,-fixtures, reference standards, transfer standards, and nondestructive test equipment.

(d)

M&TE in' the system is processed through a mechanical, electrical, or optical calibration facility.

'(e)

Reference standards used are calibrated by equipment traceable to the ~ National Institute of Standards and Technology (formerly the National Bureau of Standards) where such standards exist or, where non-existent, provisions are established to document the basis for calibration.

(f)

Standards have an accuracy adequate to verify that the M&TE being calibrated are within the tolerance requirements for which they are being used.

M&TE are calibrated against reference standards having an accuracy at least four (4) times greater than the required accuracy of the M&TE.

Greater uncertainty is acceptable when limited by the accuracy of commercially available standards, provided the standards have an accuracy that assures the equipment being calibrated will be within required tolerance and that the basis of acceptance is. documented and authorized by responsible management.

(g)

Working standards are either marked with calibration labels to indicate the next due date for calibration or the calibration information is contained in records traceable to the working standard.

(h)

M&TE instruments are uniquely identified and traceable to calibration records.

Records are maintained' indicating the last calibration date and the due date.

The calibration due date is displayed on or attached to each item or on records traceable to each item.

(1)

Provisions for ensuring and documenting the validity of previously performed inspections or tests and the acceptability of items inspected or tested since the last Page 1 of 2

B&W FUEL COMPANY i

QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES t

SECTION SUBJECT REVISION NO.

NO.

(

12 CONTROL OF MEASURING AND TEST EQUIPMENT 2

calibration when M&TE is found to be out of calibration, including identification of M&TE used.

12.2 IMPLEMENTATION The CNFP system for the control of M&TE encompasses ' the above requirements.

It is the responsibility of Q&S to assure-that M&TE used in activities affecting quality are properly controlled, calibrated, and adjusted to maintain accuracy within necessary limits.

It-is also their responsibility to assure that proper procedures are followed for active gages, measuring devices and inspection fixtures used to verify and certify item conformance with specified requirements.

If production tooling or fixtures are used as an accessory inspection medium, such items are also subject to the control program for M&TE.

Suppliers of M&TE and of calibration services for M&TE or reference standards are required by the procurement documents to have effective system for the calibration of M&TE.

Manufacturers of M&TE or calibration service suppliers utilized to calibrate M&TE or reference standards are audited and approved by QA to appropriate standards such as MIL-STD-45662, " calibration System Requirements."

State and federal agencies such as the National Institute of Standards and Technology are exempted from this requirement.

Alternatively, the acceptability of calibration services performed by'an unaudited supplier may be confirmed / verified by having the-same item, prior to use, calibrated by another supplier.

If the other supplier finds the item-to be within calibration, then the item is acceptable for use.

This comparison of calibrations is

' documented by Q&S and neither supplier need be audited and approved by QA.

Page 2 of 2

B&WFUEL COMPAnW QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICC SECTION SUBJECT REV S10N NO 13 HANDLING, STORAGE, AND SHIPPING 2

13,i r;ENERAL Internal procedures require that the responsible engineering organization identify in drawings, specifications, or procurement documents items that have specific

cleaning, handling, preservation, storage, and shipping requirements.

They must also specify. that such operations be performed on those items by qualified individuals in accordance with written instructions or procedures.

13.2 IMPLEMENTATION 13.2.1 Cleanliness cleaning operations are performed by appropriately trained personnel in accordance with written procedures which incorporate the requirements of applicable drawings and specifications.

Measures are taken during fabrication and storage to preclude damage, loss, or deterioration by environmental conditions such as temperature and humidity.

Final assembly operations are carried out in areas which are adequate to permit the attainment of the final cleanliness level specified in the applicable drawings and specifications.

After completion of final inspections, the cleanliness of accepted items is maintained by suitable means to ensure compliance with the applicable cleanliness requirements.

13.2.2 Storace of Accentable Items After the completion of final inspection, acceptable items-are tagged and placed, as necessary, in designated storage areas.

Items in long term storage areas are periodically inspected for an indication of damage to the item or its packaging for storage.

13.2.3 Packaaina of Accentable Items Packaging of acceptable items for shipment is performed as required by the applicable drawings and specifications.

The completed packaging condition of items is checked against the applicable documents and verified for compliance by the responsible quality organization.

Page 1 of 2

..s C&W FUEL C(jikPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

13 HANDLING, STORAGE, AND SHIPPING 2

13.2.4 Handlina of Maior Items Major items are handled in.such a manner as to preclude damage..

Handling devices such as cranes, slings, and other devices used for lif ting or transporting major items are subject to periodic dynamic load tests as prescribed in written procedures.

The dynamic load tests include lowering and traversing the load.

j 1

Page 2 of 2

w.

B&WFUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES

' SECTION-SUBJECT REV SiON NO.

14 INSPECTION, TEST, AND OPERATTNG STATUS 2

14.1 GENERAL Systems for the control of inspection, test,-and operating status of items are established and implemented.

The systems contain provisions for:

(a)

Documenting and identifying items that have satisfactorily passed required inspections and tests.

(b)

Precluding inadvertent bypassing of inspection and test requirements.

(c)

Providing inspection and test status using positive means such as stamps, tags, labels, route cards, and shop travelers.

(d)

Controlling the application and removal of status indicators and identifying the source of authority required for such actions.

(e)

Controlling and documenting the bypassing of required inspections, tests, or other critical operations when dictated by circumstances.

(f)

Ensuring that personnel concerned with production or cost control will not exercise control over the application or removal of status indicators.

14.2 IMPLEMENTATION 34.2.1 Route Cards The status of manufacturing and inspection operations for items supplied by CNFP are indicated in Route Cards.

Route Cards define the chronological sequence of manufacturing and inspection operations and list the appropriate drawings, specifications, or procedures applicable for each operation.

Route Cards are prepared by Manufacturing Engineering and reviewed by Q&S to verify that the appropriate inspection operations, sequences of.such operations, and procedures for performance of the inspection operations are properly noted.

Page 1 of 2 1

B&WFUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

14 INSPECTION, TEST, AND OPERATING STATUS 2

Each performer of a manufacturing or inspection operation signifies completion of that operation by initials and date on the Route Card.

Inspectors verify that operations subsequent to the last inspection operation have been properly initialed as completed.

14.2.2 Status Indication by Taas Suitable tags are attached by the inspector to items or their containers to indicate-their successful completion of receiving or final inspection operations.

Items found to be acceptable during in-process inspection are so noted on the Route Card and tags are not used.

Any item found to be nonconforming during inspection operations, will have a " Hold" tag attached to it by the Inspector indicating a deviation which may require a repair or rework, reject, or use-as-is disposition.

Once the nonconformance is'dispositioned as described in Section 15i the " Hold" tag is removed by the inspector and a " Rework", " Reject", or " Accepted" tag is attached depending upon the-disposition of the nonconformance.

-Any item with a

" Reject" tag is separated from conforming items, i

l-l V

L l

l.

Page 2 of 2 l

{

COWFUEL COMPANY c

QUALITY ASSURANCE PROGRAM ADDENDUM J

SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

15 CONTROL OF NONCONFORMING ITEMS 2

i 15.1 GEh?JAL Measures are established-to control the quality of documentation and items that do not conform to specified requirements.

These measures addross deficiencies of characteristics, documentation, L

or procedures that render an item or activity unacceptable or l-indeterminate.

.They include procedures for controlling the iuentification, documentation, and segregation of nonconforming items pending notification of affected individuals and/or l

organizations, review of the nonconformance, and approval of disposition.

l-l 15.2 INTERNAL NONCONFORMANCES Certain nonconformances may be generated within BWFC as a result of internal audits, customer audits, customer problems, or other deficiencies.

These nonconformances are documented and resolved through the use of the following reports:

15.2.1 Ouality Action ReDorts Quality Action reports may be initiated, as appropriate, by QA, Q&S, or other BWFC personnel, during the normal exercise of their i

duties to highlight deficiencies noted in quality related activities such'as methods, procedures, policies, standards, and proposals. In addition, Quality Action Reports are used internally to obtain responses and document cause and corrective action related to customer audit findings or other customer identified problems.

They may also be used to document findings resulting from internal audits of BWFC activities.

Quality Action Reports are approved by the Manager of QA.

The recipient is Icquired to reply to the Quality Action Report within the number of days specified on the Quality Action Report.

The reply is reviewed by the Quality Performance Administrator and approved by the Manager of QA.

15.2.2 Safety Concerns Nonconformances which may constitute potential significant I

deficiencies or substantial safety hazards are processed as L

preliminary safety concerns in accordance with written procedures.

I Safety concerns are processed to the requirements of 10CFR21 and 10CFR50.55(e).

Page 1 of 5 I

BSW FUEL COMPANY QUAUTY ASSURANCE PROGRAM-SPENT FUEL & WASTE TECHNOLOGY SERVICES li SECTION SUBJECT REVISION NO.

NO.

15 CONTROL OF NONCONFORMING ITEMS 2

15.2.3 Desian Deficiency Reoort (DDR)

DDRs are initiated by BWFC personnel with the concurrence of the cognizant manager to report an error discovered in any issued BWFC

[

prepared design document.

DDRs define the cause of the error, the action to correct the error and any subsequent corrective action.

The responsible project manager concurs with the action outlined by the DDR.

15.3 CNFP MANUFACTURING NONCONFORMANCES

[

Nonconforming items detected during receiving, in-process, or final d

inspections are tagged as described in Section 14 and documented on a Component Discrepancy Report (CDR).

Nonconforming items are not processed past the next release point until proper disposition of the nonconformance.

For those manufacturing operations where the nonconformance condition can be corrected by a continuation of the original manufacturing process or where it is suitable to define the rework and subsequent reinspection between release points on the Route Card, a CDR is not required.

The in-process nonconformance is noted on the inspection report and the rework and reinspection are documented on the Route Card.

CDRs are submitted to Manufacturing Engineering for review and determination of cause, corrective action, and a recommended disposition.

Data Evaluation reviews the recommended disposition and final disposition is rendered by the Manager of Data Evaluation.

Disposition and subsequent actions may be as follows:

rework, restricted use, return to supplier, repair, scrap, or submit to the responsible design organization for approval via a Contract Variation Approval Request (CVAR).

Definition of rework, repair,

='

and scrap are contained in Appendix C.

Restricted use disposition limits the use of the nonconforming item to special applications or situations.

Rework or repair activities are performed in accordance with approved methods or procedures and reinspected to the original criteria or to criteria established for the acceptability of the rework or repair.

If the nonconformance is a violation of requirements imposed by the responsible design organization, a CVAR or customer equivalent document must be prepared and submitted to the responsible design organization for approval to repair, use the item as is, or for e

restricted use of the item (See Section 15.5).

If repair Page 2 of 5

L B&WFUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES-SECTION SUBJECT REVISION NO.

NO.

15 CONTROL OF NONCONFORMING ITEMS 2

0 procedures for the particular nonconformance type have been preapproved by the responsible design-organization, the submittal-of a CVAR for the repair is not necessary.

15.4 SUPPLIER NONCONFORMANCES Supplier nonconformances enter the BWFC system in one of three

~

ways:

r (a)

By the submittal of a written request by a supplier for approval of nonconformances that violate requirements of BWFC procurement documents or BWFC approved supplier drawings, specifications, or procedures and the supplier wishes to repair the nonconforming item or use-as-is.

This request L

takes the form of a CVAR as described in Section 15.5 for procurement initiated by BWFC Old Forest Road personnel and o

for procurement initiated by CNFP personnel, it is converted l-into a CDR and processed as described in Section 15.3.

(b)

By audit findings initiated by QA to identify nonconformances found during supplier audits as described in Section 18.

(c)

By nonconformance reports issued by QA/Q&S to document nonconformances detected during source inspections or surveillance as described in Section 7.

Resolution of (b) and (c) may result in the submittal of supplier requests for approval of the nonconformances as described in- (a) above.

15.5 CONTRACT VARIATION APPROVAL REOUEST (CVAR) 15.5.1 _CNFP CVARs CVARs may result from the processing of CDRs as described in Section 15.3.

CVARs are prepared by Data Evaluation using-the relevant CDR as a base and evaluated by Manufacturing Engineering.

The completed CVAR, which describes the nonconformance, cause, corrective action, and recommended disposition is submitted to the responsible design organization for review and evaluation.

CVARs dispositioned as repair must either have the repair procedures attached or indicate that the repair will be performed in l

accordance with a procedure approved by the responsible design organization.

When the responsible design organization is a BWFC organization, the CVARs are evaluated for acceptability as described in Section 15.5.3.

Page 3 of 5 E

F

C&WFUEL COMPANY QUALITY ASSURANCE PROGRAM-SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

15 CONTROL OF NONCONFORNING ITEMS 2

Upon ' receipt of the dispositioned CVAR, Data Evaluation will initiate appropriate actions consistent with the disposition, i.e.,

disapproved, approved for use-as-is, approved for repair using a repair procedure approved by the responsible design organization, or approved for restricted use.

The disposition of a CVAR may be transmitted, as the need dictates, by oral communication to Data Evaluation.

In such cases, the communication is documented by Data Evaluation with a copy to the design organization representative who verbally authorized the CVAR disposition.

This verbal disposition -is considered as proper authorization for Data Evaluation to proceed in accordance with the instructions of the disposition.

An item will not be certified until a final copy of the dispositioned CVAR is received.

15.5.2 SuDolier CVARs CVARs may result from supplier nonconformances as discussed in Section 15.4.

The CVAR (or equivalent supplier document) is prepared by the supplier and includes his determination of cause, corrective action, and recommended disposition, i.e.,

repair or use-as-is.

Repair disposition must be accompanied with a repair procedure or indicate the repair will be performed in accordance with a BWFC approved repair procedure.

The supplier trancmits the completed CVAR to BWFC for evaluation by the responsible BWFC design organization as described in Section 15.5.3.

Upon receipt of the dispositioned CVAR, the supplier will-initiate

-appropriate actions consistent with the BWFC disposition.

15.5.3 BWFC Desian Oraanization Evaluation of CVARs CVARs which do affect interface, function, or interchangeability are evaluated by the responsible engineer.

CVARs which do affect these parameters are also evaluated by the cognizant project manager for possible notification to the customer or submittal for acceptance as prescribed in the customer's contract.

BWFC disposition of a CVAR may be either approved or disapproved.

Approval of use-as-is dispositions must be justified by the responsible engineering organization either by attaching to or referencing on the CVAR such justification.

Disapproved CVARs may L

indicate the reasons for disapproval or alternate dispositions.

Page 4 of 5

y COW FUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SCVICES SECTION SUBJECT -

REVISION NO.

NO.

15 CONTROL OF NONCONFORMING ITEMS 2-The. dispositioned CVAR is entered into the Records Management System and returned to the supplier or CNFP, as the case may be.

15.6 FIELD OPERATIONS NSNCONFORMANCES Field Operations Problem Reports are used to report nonconforming or problem conditions encountered on site during the performance of field service tasks.

This Problem Report documents the particular condition and specific action taken to resolve or correct it.

In addition, cause and longer tern corrective action to preclude recurrence of the problem is def f.ned on this report when the problem is classified as a nonconformance.

Field Operations Problem Reports are prepared by Field Operations personnel; concurred with by the customer as required; and reviewed / approved by the Manager of Field operations.

The Manager of Quality & Safety revieks and approves Problem Reports when the problem is classified as.a nonconformance.

i I

Page 5 of 5

B&WFUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

16 CORRECTIVE ACTION 2

16.1 GENERAL Procedures are established by BWFC to ensure prompt identification and correction of conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances during the design, procurement, fabrication, inspection, and testing of items.

These procedures require assurance that:

(a)

Nonconformances and failures are evaluated to determine the need for corrective action, and that such action is taken as necessary.

(b)

The cause of the nonconformance or failure is determined and action is taken to preclude recurrence.

(c)

Appropriate levels of management are informed of significant conditions adverse to quality, the cause of the conditions, the action taken, and the corrective action taken to preclude recurrence.

(d)

Follow-up is conducted to verify proper implementation of both corrective and preventive actions and to close out the rurrective action documentation.

16.2 IMPLEMENTATIOl{

Reports of nonconformances are generated / received by BWFC as l

described in Section 15.

They are analyzed by QA to determine whether.more e:: tensive actions are required in_ addition to any l

corrective action applied to the specific nonconformance._

The stated cause of the nonconformance is reviewed by QA to determine the following:

(a)

Whether there may have been previous occurrences-.

(b)

Whether the root cause may result in subsequent nonconformances if not corrected.

(c)

Whether the cause indicates a defect or a correctable trend in design, fabrication, processing, personnel training, etc.

i l

l Page 1 of 2 1

03W FUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT PEVISION NO.

NO.

16

' CORRECTIVE ACTION 2

Potential problems identified by the QA review are reported to the responsible organization for further corrective action. Subsequent review and follow-up is accomplished by - QA to determine the effectiveness of the corrective action taken.

l l

i Page 2 of 2

+

B&W M9EL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVh ;$

SECTION SUBJECT REvtSION NO.

NO.

17 QUALITY ASSURANCE RECORDS 2

17.1 GENERAL Procedures are established by BWFC to collect and retain records which provide evidence that design, procurement, fabrication, inspection, and testing activities are : n accordance with quality requirements.

Requirements and responsibilities for record generation, identification, accumulaticn, transmittal, retention, and maintenance are contained in these procedures.

J' QA records include such documentation as design analysos and i

calculations; design reviews; drawings; specifications; procurenient documents; results of inspections, tests, audits, and waterial analysest mon $toring of work performance; qualificatici, cf personnel, procedures, and equipment; calibration procedures and reports; nonconformance reports; corrective action reports; inspection and test recordst and other documentation required by applicable codes and regulations.

17.2 IMPLEMENTATION Records Management is responsible for the collecting,

filing, transmitting, and/or maintenance and control -of QA records generated by BWFC organizations or submitted by suppliers.

QA records generated by CNFP organizations during manufacturing are collected by Data Evaluation during the performance of contract work.

At the completion of the work specified by the contract, Data Evaluation transfers the records +o Records Management.

The record filing and retention procedures and facilities used by mL Records Management provide for the identification end retrieval of QA records pertinent to a contract and for the protection of these records to prevent deterioration, damage, or loss of the r.ecords.

This records management systems meets the requirements of Regulatory Guides 1.28 (Rev. 3) and 1.88 (Rev. 2) ha stated in Appendix A.

At the completion of a contract, the QA records for the contract will be stored by BWFC and/or provided to the customer as specified in the contractual agreements.

QA records generated by BWFC perconnel during field operations are collected and retained by BWFC or the customer as specified in the contractual agraements.

Page 1 of 1 m

E

-N.-

s B&WFUEL COMPANY QUALITY ASSURANCE PROGRAM i

SPENT FUEL & WASTE TECHNOLOGY SERVICES LEC110N SUBJECT REYlSION j

NO-NO.

18 AUDITS 2

18.1 GENERAL BWFC QA conducts an audit program d6 fined by written procedures providing program definition as well as direction and guidance for audits and the supporting activities concerned.

These procedures establish the scheduljng, preparation, execution, reporting, and follow-up methods to be used in implementing the audit progr,'m.

The audits conducted under the QA audit program include an objective evaluation of quality-related practices, procedures, and instructions; the effectiveness of implementation; conformance with policy directives; work areas, activities, processes, and items;

! idoctrination and training programs; interfaces within BWFC and with the customer; corrective

action, calibration, and nonconformance control systems; calculations and associated computer crdes; and the review of documents and records.

Audits are regularly scheduled based upon the status and safety importance of the act'vities being performed and are initiated early snough to assure effective QA during design, procurement, fabrication, inspection, and testing.

The audits are performed in accordance with pre-established written procedures or checklists and conducted by trained personnel having no direct responsi-bilities in the areas being audited.

Continuing analysis of the audit information is performed by QA to indicate any trend in quality or the effectiveness of the QAP.

The BWFC QA audit program is in compliance with Regulatory Guides 1.28 (Rev. 3) and 1.144 (Rev. 1) as set forth in Appendix A.

QA audit personnel are trained and qualified in accordance with the require.nents of Regulatory Guides 1.28 (Rev. 3) and 1.146 (Rev. 0) as described in Appendix A.

l 1B.'

INTERNAL AUDITS l

Internal audits of BWFC activities are used to evaluate compliance i

with and the effectiveness of the QAP.

These audits are scheduled to cover the quality program elements once each calendar year.

The QA organization is audited by qualified auditors who have no direct i

responsibility for the performance of the QA activities being audited.

Audits of other BWFC organizations' activities are conducted by qualified auditors having no responsibilities in the areas audited.

I i

Page 1 of 2 l

l

B&WFUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

18 AUDITS 2

Reports from the audits of BWFC activities are provided to the managers of the areas audited and to the president of BWFC for review, analysis, and direction.

Managers of the audited areau investigate audit findings; determine cause, schedule corrective

action, including Jr.casures to prevent recurrence; and provide written responses to the findings of the audit.

Follow-up is conducted by QA to ensure implementatic<n of appropriate corrective

]

and preventative actions.

When necessary, follow-up will include reaudit of deficient areas.

18,3 SUPPLIER AUDITS Suppliers of safety related items and services are evaluated or l

audited by QA to determine compliance with procurement document requirements and the effectiveness of their quality programs.

Audit frequency is based upon written criteria that incorporate the safety classification, importance, complexity, and quality requirements of the items or services being procured.

Reports of find'ngs from these audits are provided to the audited supplier, I

and responses (which address cause and corrective action) to the findings are required.

The findings are closed when the supplier can demonstrate effective corrective actions in the areas of the findings.

The audit reports, supplier responses, and their evaluation provide inpuc for the maintenance of approved supplier lists (Refer to Section 7).

18.4 SITE AUDITS Site audits of BWFC field operations will be performed in accordance with customer requirements.

When performed, they will be conducted in the same manner as internal audits and as early in the life of the activity as practical.

In addition, they will be conducted on intervals consictent with the schedule for accomplishing the activity and commensurate with the status and i

importance of the activity.

18.5 AUDIT RECORDS Audit recordr are maintained as permanent QA records.

These records include sudit plans, audit reports, audit findings, audit responses, follow-up actions, and audit personnel qualification records.

Page 2 of 2

1 B&WFUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

COMPLIANCE WITH APPLICABLE WRC APP A QUALITY RELATED REGULATORY GUIDES 2

i A.

BWFC's y '"ons with respect to the NRC Regulatory Guides pertain; g tc quality Assurance as they apply to the BWFC scopt o' cupp, is as follows:

1.

Em J orv Guide 1.26 (Revision 3):

ouality Guide Clas_'.fications and Standards for _ Water.

Steam.

and Radioactive Waste Containina Comoonents of Nuclear Power Plants l

BWFC complies with the provisions of this guide.

BWFC generally classifies nuclear core components as safety related.

2.

Reaulatory_ Guide 1.28 (Revision 25:

Ouality Assurance Erocram Reauirements (Desian and construction)

This guide endorses ANSI N45.2-1977, Quality Assurance Program Requirements for Nuclear power Plants," as an appropriate basis for compliance with Appendix B to 10 CFR 50.

BWFC complies with the provisions of this guide.

l 3.

Reculatory Guide 1.28 (Revision _3):

Quality Assurance Procram (Desian and Construction)

This guide endorses ANSI /ASME NQA-1-1983 and the l

ANSI /ASME NQA-la-1983 addenda as an appropriate basis for l

compliance with Appendix B of 10 CFR 50.

BWFC complies l

with the provisions of this guide with the following clarifications:

a.

Reaulatory Guide 1.28 (Revision 3) Section C.1:

Qualification of Insoection and Test Personnel BWFC follows the regulatory position provided in Section C.1 with the clarifications supplied for Regulatory Guide 1.58 in the Appendix.

b.

Raoulatorv Guide 1.28 (Revision 3) Section C.2:

Ouality Assurance Records BWFC follows the regulatory position provided in Section C.2 with the clarification supplied for Regulatory Guide 1.80 in this Appendix.

Page 1 of 7


+-----r

-r-

-m

.m.- -

m m

B&W FUEL COMPANY QUAUTY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES I

i

$ECTION L SUBJECT REVISION NO.

l NO.

]

COMPLIANCE WITM APPLICABLE NRC APP A QUALITY RELATED REGULATORY GUIDES 2

c.

Reaulatory Guide 1.28 (Revision 3) Section C.3 Audits i

BWFC follows the regulatory position provided in Section C.3 with the clarifications supplied for Regulatory Guide 1.144 in this Appendix.

d.

ANSI /ASME NOA-1 Sucolement 35-1 Section 4.0t Desian Verification The clarifications noted for Regulatory Guide 1.64 in this Appendix, regarding the use of Managers or Supervisors as independent reviewers, applies.

4.

Reculatory Guide 1.29 (Revision 3)! Seismic Desian ClassificatioD BWFC complies with the provisions of this guide.

5.

Reculatory Guide 1.30 (Revision 01:

Oualit.

Assurance Recuirements for Installation.

Insocction, and ~ restina of u

Instrumentation and Electrical Eculoment This guide endorses ANSI N45.2.4-1972 (IEEE Std 336-1971),

" Installation, Inspection, and Testing Requirements of Instrumentation and Electrical Equipment During the Construction i

of Nuclear power Generating Stations," as an adequate basis for compliance with Appendix B to 10 CFR 50.

This standard applies to on-site installation, inspection, and testing of safety-related instrumentation and electrical equipment.

This function is normally the responsibility of the plant owner, and this standard is reflected in the owner's procedures applicable to this work.

BWFC provides appropriate drawings, instructions, and consultation to aid the owner in compliance with this guide.

6.

Reaulatory Guide 1.37 (Revision 0):

Ouality Assurance Recuirements for Cleanina of Fluid Systems and Associated Comoonents of Water-Cooled Nuclear Power Plants This guide endorses ANSI N45.2.1-1973, " Cleaning of Fluid Systems and Associated Components During Construction Phase of Nuclear Power Plants," as an adequate basis for compliance with Appendix B to 10 CFR 50 for on site Page 2 of 7

=

B&WFUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

N O.

CONPLIANCE WITN APPLICABLE NRC APP A QUALITY RELATED REGULATORY GUIDES 2

cleaning.

This function is normally the responsibility of the plant owner, and this standard is reflected in the owner's procedures applicable to this work.

BWFC provides appropriate instructions and consultation to aid the plant owner in compliance with this guide.

BWFC specifies cleanliness requirements during the f abricatic,n and shipment of safety-related components to ensure that these components arrive at the site in satisfactory condition.

These cleanliness requirements include consideration of chemical compounds that are known to co.1 tribute to intergranular cracking or stress corrosion cracking of stainless steel or nickel alloys.

In addition to ASTM A-262, B&W considers ASTM A-393 to be a valid test for the detection of sensitization of austenitic stainless steel.

Recent action by ASTM reinstated ASTM A-393 as ASTM A-708.

7.

Reculatorv Guide 1.38 (Revision 21 Ouality Assurance Reauirements for Packacina. Shionina. Receivina. Storace.

and Handlina of Items for Water Cooled Nuclear Power Plants This guide endorses ANSI N45.2.2-1972,

" Packaging, Shipping, Receiving, Storage, and Handling of Items for Nuclear Power Plants During the construction Phase" with some modifications.

BWFC complies with the provisions of this guide.

8.

Reaulatory Guide 1.58 (Revision 1):

Oualification of linglear Power Plant Insoection. Examination, and Testina Personnel This guide endorses ANSI N45.2.6-1973, " Qualifications of Inspection, Examination, and Testing Personnel for the Construction Phase of Nuclear Power Plants" for use in compliance with Appendix B to 10 CFR 50.

Although ANSI N45.2.6-1973 is applicable only to the construction phase of a nuclear power plant, this Regulatory Guide states that the provisions of ANSI N45.2.6-1973 are " generally applicable during fabrication prior to receipt of items at the construction site. "

BWFC satisfies this guide through ensuring that off-site inspection, examination, or testing is performed and/or monitored by Page 3 of 7

o B&WMML COMPANY QUALITY AS3URANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO NO.

COMPLIANCE WITM APPLICABLE NRC APP A QUALITY RELATED REGULATORY GUIDES 2

l BWFC QA representatives qualified to meet the applicable j

requirements of ANSI N45.2.6.

BWTC ensures that nor. destructive examinations are performed by personN1 certified to SNT-TC-1A in l

compliance with Section 2 of this guide, and that other inspections, examint.ticas or testing is performed by personnel qualifir.d in accordance with applicable requirements.

9.

Reculatory Guide 1.64 (Revision 2):

Ouality Assurance Renuirements for the Desian of Nuclear Power Plants i

This guide endorses ANSI N45.2.11-1974,

" Quality

)

Assurance Requirements for the Design of Nuclear power Plants" as acceptable for compliance with Appendix B to 10 CFR 50 with noted amplifications.

The following BWFC clarification is identified with respect to Section C.2 of this guide regarding the use i

of managers or suparvisors as independent reviewers:

All design documents are independently reviewed for completeness and technical accuracy.

The reviewer may bet i

(a)

Any competent individual other than the preparer of the document as determined by the cognizant manager.

s (b)

The preparer's immediate superviaor provided the supervisor did not prescribe or limit the techniques or inputs used in the design document.

The use of supervisors as reviewers is approved in each instance by the cognizant manager.

i (c)

The preparer's manager provided the manager is.the only technically qualified individuals available.

In this case, the need is documented and approved by the next higher level of management on each l

l occasion.

(d)

QA audits cover the frequency and effective use of supervisors and managers as independent reviewers to guard against abuse.

Page 4 of 7 l'

y BBW RJEL COMPANY QUAUTY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO NO.

COMPLIANCE WITH APPLICABLE NRC APP A QUALITY RELATED REGULATORY GUIDES 2

10.

Reculatory Guide 1.74 (Revision 01 Ouality Assurance Terms and Definitions This guide endorses ANSI N45.2.10-1973,

" Quality Assurance Terms and Definitions," for use in describing and implementing quality assurance programs.

BWFC uses the appropriate definitions of ANSI N45.2.10-1973 and supplements these terms with others considerud necessary to provide a common interpretation of the BWFC QAP.

These provisions satisfy this Regulatory Guide.

11.

Reculatory Guide 1.88 (Revision 2)! Collection. Storace, and Maintenance of Nuclear Power Plant Ouality Assurance Records This guide enforses ANSI N45.2.9-1974, " Requirements for Collection, Storag.*, and Maintenance of Quality Assurance Records for Nuclear Power Plants," for use in compliance with criterion XVII of Appendix B to 10 CFR 50.

The BWFC Records Management Program complies with this Regulatory Guide, effective June 16, 1975.

12.

Reculatorv Guide 1.123 (Revision 1):

Ouality Assurance Reauirements for Control of Procurement of Items and Services for Nuclear Power Plants This guide endorses ANSI N45.2.13-1976,

" Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants."

BWFC complies with the provisions of this guide.

13.

Reculatorv Guide 1.144 (Revision 1): Auditina of Ouality Assurance Procrams for Nuclear Power Plants This guide endorses ANSI N45.2.12-1977, " Requirements for Auditing of Quality Assurance Programs for Nuclear Power Plants."

The standard establishes requirements for conducting audits of quality assurance programs both internally and externally (suppliers).

Page 5 of 7 a

1

c B&WFUEL COMPANY e

quAuTY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REylSION NO.

NO.

COMPLIANCE WITE APPLICABLE NRC APP A QUALITY RELATED REGULATORY GUIDES 2

BWFC satisfies the requirement for internal audits by auditing each applicable element of its Quality Assurance Program at least once during a calendhr year.

External (Supplier) audits are regularly scheduled on the basis of supplier performance, and importance to safety of the activities being performed.

Audit frequency of suppliers, normally between one and three years, may be altered (increased or decrt.ased) based on an annual i

evaluation of the supplier's quality assurance program, L

history of performance, and implementation of that t

program. This evaluation considers the complexity of the i

system or component concerned and the degree of quality and process control required by the manufacturing effort.

i l

14.

Reaulatory Guide 1.146 (Revision 01:

oualification of f

Ouality Assurance Procram Audit Personnel for-Nuclear Power Plants l

This guide endorses N45.2.23-1978,

" Qualification of Quality Assurance Program Audit Personnel for Nuclear l

Power Plants. " BWFC complies with the provisions of this guide.

15.

Reculatorv Guide 7.10 (Revision 11: Establishina Ouality Assurance Procrams for Packacina used in the TransDort of Radioactive Material i

This guide provides guidance in formulating quality I

assurance programs to satisfy Subpart H of 10CFR71.

BWFC complies with the provisions of this guide.

B.

BWFC's review and analysis of the following QA related regulatory guides indicate that they are not applicable to the BWFC scope of supply:

l 1.

Reculatory Guide 1.8 (Revision 21:

Personnel Selection and Trainina This guide endorses ANSI N18.1-1971,

" Selection and Training of Nuclear Power Plant Personnel."

Page 6 of 7

B&W FUEL COMPANY l

i QUAUTY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECll0N SUBJECT REVislON NO.

NO.

COMPLIANCE WITH APPLICABLE NRC APP A QUALITY RELhTED REGULATORY GUIDES 2

BWFC personnel used in the performance of field services will meet the provisions of this guide and associated standard if invoked by a customer.

2.

Reculatory Guide 1.39 (Revision 01:

HousekeeDina Recuirements for Water-Cooled Nuclear Power Plants This guide endorses ANSI N45.2.3-1973,

" Housekeeping During Construction Phase of Nuclear Power Plants."

BWFC will meet the provisions of this guide and associated standard during the performance of field services if invoked by a customer.

3.

Reaulatory Guide 1.94 (Revision 1):

Ouality As su.'an.c3 Recuirements for Installation. InsDection. and Tes*J1DE of Structural Concrete and Structural Steel Durina Qg construction Phase of Nuclear Power Plants This guide is not applicable to the BWFC scope of supply.

4.

Reculatory Guide 1.116 (Revision 0-R) : Ouality Assurance Recuirements for Installation. Insnection, and Testina gf Mechanical EcuiDment and Systems for the Construction Phase of Nuclear Power Plants This guide is not applicable to the BWFC scope of supply.

Page 7 of 7 1

B&W FUEL CEMPANY quAuTY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

QA PROGRAM POLICIES, PROCEDURES, AND APP B INSTRUCTIONS (TYPICAL LISTING) 0

)

APPLICABLE SECTIONS DOCUMENT NO.

DOCUMENT TITLE OF OA MANUAL BWNT-0199-01 Organization Charts 1

CNFP QA Plan for Manufacturing Operations 1-18 CNFP QA Plan for Field Operations 1-18 09-1212 QA Specification 1-18 09-1427 QA Specification (R&D) 1-18 BWNT-0310-47 Release Authorizations 1-18 07-1000584 Quality Classification System 2

BWNT-1702-25 Assignment of Nuclear Safety Classification 2

to Products & Services BWFC-0402 Quality Assurance Program 2

BWNT-1702-22 Employee Training 2

BWNT-1719-23 Qualification of QA Audit Personnel 2,

18 QC-1416 Qualification of CNFP Audit Personnel 2,

18 QC-1407 Indoctrination of CNFP QA Administrative 2

& Clerical Employees QC-1440 Qualification of CNFP Inspection & Test 2,

10, 11 Personnel QC-1449 CNFP QA Program Training 2

OI-1262 Qualification and Certification of QC 2,

7 Surveillance Personnel BWNT-0402-01 Calculations 3,

6 BWNT-0403-11 Technical Document Signatures 3,

6 Page 1 of 5

t.

B&WFUEL COMPANY QUAUTY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REV ION j

QA PROGRAM POLICIES, PROCEDURES, AND APP B INSTRUCTIONS (TYPICAL LISTING) 0 APPLICABLE SECTIONS DOCUMENT NO.

DOCUMENT TITLE OF OA MANUAL

)

BWNT-0405-21 Change Authorization 3,

6 BWNT-0405-22 Jesign Review BoarGs 3

BWNT-0405-30 Design Verification Testing 3-6, 11 BWNT-0408-08 Materials Review & Consultation 3

1 BWNT-0412-55 Design Specifications / Requirements Documents 3-6, 11, 13

.BWNT-0412-57/58 Detail Design Documents 3-6, 11, 13 BWNT-0412-59 Engineering Information Record 3, 5, 6, 11 BWNT-0412-63 Technical Document Format 3,

5, 6

BWNT-0412-66 Release of Product Documentation 3-6 I

BWNT-0412-67 Processing Technical Documents from 3-7 Suppliers & Customers BWNT-0414-12/13 Licensing Documents 3,

6

.BWNT-0902-06 Software Certification 3,

6 BWNT-0902-07 Mathematical, Statistical, & Graphics 3,

6 Software BWNT-0902-10 Software Development 3,

6 t

BWNT-0903-03 Software Documentation 3,

6 BWNT-1212-12 Procurement Documents 4

BWNT-1705-16 QA Review of Procurement Packages 4

QC-1402 Review of CNFP PO/COs 4

Page 2 of 5

1 j

t E

B&W FUEL COMPANY n

1 QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

No.

QA PROGRAM POLICIES, PROCEDURE 8, AND APP B INSTRUCTION 8 (TYPICAL LI8 TING) 0 APPLICABLE SECTIONS DOCUMENT NO.

DOCUMENT TITLE OF OA MANUAL i

PC-1305 Purchase Requisitions (CNFP) 4 BWFC-0501 Policies, Procedures, & Operating Instructions 5,

6 BWNT-1303-07 Administrative Procedures 5,

6 i

BWNT-1303-17 Operating Instructions 5, 6 BWNT-1303-15 Control of Manuals 5, 6 PC-1330 CNFP Administrative & Operating Procedures 5, 6 QC-1410 CNFP Quality Administrative & Operating 5,

6 l

Procedures MA-1206 CNFP Manufacturing Process Procedures 5,

6 MA-1207 CNFP Route Cards 5,

6, 14 QC-1434 CNFP Concurrence Requests 6

i BWNT-0310-38 Historical Documents List 6

BWNT-1708-08 QC Surveillance 7

BWNT-1719-22 QA Audits of Suppliers 7,

18 BWNT-1705-03 BWFC QA Data Packages and Certificates 7

of Conformance QC-1400 Review & Approval of CNFP Vendor QA Manuals 7,

18 QC-1401 Review & Approval of CNFP Vendor QA Plans &

7, 18 Procedures QC-1403 CNFP Supplier Pre-Award Evaluation 7,

18 QC-1437 CNFP Source Inspections 7

QC-1419 CNPP Supplier Status List 7

l Page 3 of 5 1

B&WFUEL CEMPANY QUALITY ASSURANCE PROGRAM ADDENDUM I

SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJEC1 REVISION NO.

NO.

QA PROGRAM POLICIES, PROCEDURES, AND APP B INSTRUCTIONS (TYPICAL LISTING) 0 APPLICABLE SECTIONS DOCUMENT NO.

DOCUMENT TITLE OF OA MANUAL QC-1409 Quality Program Audit for CNFP Vendors 7,

18 QC-1424 CNFP Conformance Certifications 7

j QC-1430 CNFP QA Data Packages 7

QC-1426 Identification and Control of Materials, 7,

8, 10 Parts, & Components by CNFP BWNT-0310-05 Product Numbering 8

MA-1202 Qualification of CNFP Manufacturing Process 9

Procedures MA-1208 Qualification of CNFP Welders / Welding 9

Operators QC-7XX Several Procedures for CNFP NDE Personnel 9

& Equipment Qualification QC-1428 Control of Special Processes by CNFP 9

i QC-1431 CNFP Inspection Program 10 QC-1405 Control of Measuring Equipment by CNFP 12 QC-1408 Control of Inspection, Test, and Operating 14 Status by CNFP BWNT-0405-05 Contract Variation Approval Requests (CVAR) 15, 16 BWNT-1703-71 BWFC Quality Action Reports 15, 1G BWFC-0401 Reporting of Defects & Non-Compliances 15,16 Concerning Substantial Safety Hazards (10CFR21)

BWNT-1707-01 Processing Safety Concerns 15, 16 BWNT-1717-02 Internally Identified Design Deficiencies 15, 16 Page 4 of 5

B&WFUEL COMPANY QUALITY ASSURMCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION

$UBJECT REVISION

~

QA PROGRAM NLICIES, PROCEDURES, AND APP B INSTRUCTIONS (TYPICAL ISTING) 0 APPLICABLE SECTIONS DOCUMENT NO.

DOCUMENT TITL2 OF OA MANUAL t

QC-1413 CNFP Nonconforming Materials, Parts, or 15, 16 Components QC-1423 CVAR Processing by CNFP 15, 16 QC-1447 CNFP Field Operations Problem Reports 15, 16 QC-1412 CNFP Corrective Action 16 1El Records Management Prsgram 17 QC-1414 Retention & Storage of CNFP QA Records 17 BWNT-1719-21 QA Audits of Internal Activities 18 QC-1411 Internal Audits of CNFP Activities 18 i

\\

l l

Page 5 of 5 l

l

B&W FUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO i

NO APP C ACRONYMS / ABBREVIATIONS / DEFINITIONS 0

ACRONYMS / ABBREVIATIONS ADL Applicable Documents List AF Audit Finding ANSI American National Standards Institute ASME American Society of Mechanical Engineers B&W Babcock & Wilcox BWFC B&W Fuel Company BWNS BW Nuclear Service Company CAR Corrective Action Request CDR Component Discrepancy Report CPR Code of Federal Regulations CNFP Commercial Nuclear Fuel Plant CO Change Order COC Certificate of Conformance CVA?

Contract Variation Approval Request DDR Design Deficiency Report DRB Design Review Board DRN Document Release Notice FCA Field Change Authorization HDL Historical Document List NCR Nonconformance Report M&TE Measuring & Test Equipment NDE Nondoctructive Examination NRC Nuclent Regulatory Commission OI OperatAng Instruction PA Procurement Authorization PO Purchase Order L

PR Purchase Requisition QA Quality Assurance QAP Quality Assurance Program QC Quality Control Q&S Quality & Safety RA Release Authorization R&D Research & Development RFQ Request for Quote DEFINITIONS ACCEPTANCE CRITERIA Specified limits placed on charac-teristics of an item, process, or service defined in codes, stds, or other requirements documents and used to determine whether or not an item, process, or service is satisfactory.

Page 1 of 12 I

w -

."w-

B&W MJEL COhtPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REV ION NO.

~

APP C ACRONYMS / ABBREVIATIONS / DEFINITIONS 0

ANNUAL Defined as occurring within a

calardar year, performance of duties shall not be less than 11 months or more than 13 months.

Individual procedures may be more restrictive.

APPROVAL The act of endorsing or assigning positive authorization, or both.

AS-BUILT DATA Documented data that describe the condition actually achieved in an item.

AUDIT A planned and documented activity performed to determine by investigation, examination, or evaluation of objective evidence the adequacy of and compliance with established procedures, instructions,

drawings, and other applicable documents, and the effectiveness of implementation. An audit should not be confused with surveillance or inspection activities performed for the sole purpose of process control or product acceptance.

CERTIFICATE OF CONFORMANCE A

document signed or otherwise authenticated by an a'athorized individual certifying the degree to which items or services meet specified requirements.

CERTIFICATION The act of determining, verifying, and attesting in writing to the qualifications of personnel, processes, procedures, or items in accordance with specified requirements.

CHARACTERISTIC Any property or attribute of an item process, or service that is distinct, describable, and measurable.

Page 2 of 12 i

a.

e i

B&W FilEL COMPANY i

e QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO f

APP C ACRONYM 8/ ABBREVIATIONS / DEFINITIONS 0

CLEANLINESS A state of being clean in accordance, with predeteratined standards, and usually implies freedom from dirt,

dust, rust, oil or other contaminating impurities.

j CRITICAL CHARACTERISTIC Those characteristics that are essential for perforinance of an item's safety related function (s).

Typical critical characteristics are attributes such as

form, fit, dimensions, material including physical and chemical properties, electrical,
thermal, or other functional plt 8 meters.

COMMERCIAL GRADE ITEM An item satisfying (a), (b), and (c) below:

l l

(a) not subject to design or i

specification requirements that are unique to nuclear facilities (b) used in app 1dcations other than nuclear facilities (c) is to be ordered from the r

manufacturer / supplier on the basis of speciftcations set forth in the manufacturer's published product description (for example, catalog) l l

COMPUTER PROGRAM A sequence of instructions suitable (CODE, SOFTWARE) for processing by a

computer.

Processing may include the use of a assembler, a

complier, an interpreter, or a

translator to prepare the program for execution as well as to execute it.

1 i

Page 3 of 12

]

ECWFUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES j

SECTION SUBJECT REVISION NO NO.

APP C ACRONYMS / ABBREVIATIONS / DEFINITIONS 0

i i

CONDITION ADVERSE TO An all-inclusive term used in QUALITY reference to any of the following:

failures, malfunctions, deficiencies, defective items, and nonconformances.

A significant condition adverse to quality is one which, if uncorrected, could have a serious effect on safety or operability.

CORRECTIVE ACTION Measures taken to rectify conditions adverse to quality

and, where necessary, to preclude repetition.

DOCUMENT Any written or pictorial information L

describing,

defining, specifying, reporting or certifying activities, i

I requirements, procedures or results.

DOCUMENT MASTER LISTS Lists of documents -to which an individual may refer to determine the current revisions of documents applicable to an activity, project, or contract. Includes such lists as:

applicable documents list, contract documents list, historical documents

list, procedure manual table of contents or plan list, etc.

DOCUMENTATION A compilation of those documents I

concerning a

specific

function, activity or project.

EXAMINATION An element of inspection consisting of investigation of materials, components, supplies or services to l

determine conformance to those specified requirements which can be determined by such investigations.

Examination is usually nondestructive and includes visual, simple physical I

manipulation, gaging, measurement and written documentation.

l l

l Page 4 of 12 1

l-

R&W FUEL COMPANY i

QUALITY ASSURANCE PROGRAM l

SPENT FUEL & WASTE TECHNOLOGY SERY!Ct3 SECllON SUBJECT REVisl0N NO.

{

NO.

APP C ACRONYMS / ABBREVIATIONS / DEFINITIONS 0

HANDLING An act of physically moving and/or lifting items by hand or mechanical means.

HOLD An action by a quality organization wherein an item is withheld and segregated from further processing until a disposition has been defined and imposed.

HOLDPOINT A

point at which witnessing of examinations is required by the quality organization or customer and beyond which point work shall not proceed without the consent of the 4

i quality organization or customer representative respectively.

l INSPECTION Examination or measurement to verify whether an item or activity conforms to specified requirements.

4 INSPECTION & TEST RECORDS Documents that furnish evidence of the completion of inspections and tests.

They contain the following, where applicable, a description of type of observation; the date and results of the inspection or tests; inspector or data recorder identification; evidence of acceptability of the item inspected or tested; and action taken to resolve any nonconformances noted.

INSPECTOR A qualified individual whose duties include verification of quality related activities and who is independent of the activity being verified.

Page 5 of 12

____m B&W RIEL COMPANY QUALITY AESURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

APP C ACRONYM 8/ ABBREVIATIONS / DEFINITIONS 0

ITEM An all-inclusive term used in place of any of the followingt appurtenance, assembly, component, equipment, material, module, part, structure, subassembly, subsystem, system, or unit.

MEASURING AND TEST EQUIPMENT Devices or systems used to calibrate, measure, gage, test or inspect in order to control or to acquire data to verify conformance to specified requirements.

MONTHLY Defined as within a 30-day period, performance of duties shall not be less than 15 days or more than 45 days.

Individual procedures may be I

more restrictive.

NONCONFORMANCE A

deficiency in characteristic, documentation, performance or procedure which renders the quality I

of an item unacceptable or indeterminate.

Examples of l

nonconformances include physical defects, test failures, incorrect or inadequate documentation, or deviation from design standards, prescribed processing, inspection or test procedures and procurement document requirements.

I NONDESTRUCTIVE EXAMINATION A method of detecting indications of discrepancies without destroying the usefulness of the item or material.

OBJECTIVE EVIDENCE Any statement of fact, information, or record; either quantitative or qualitative pertaining to the quality of an item or service which can be verified by records of

tests, examinations, inspections, measurements, or observations.

Page 6 of 12

. - ~... - _,

^

B&WFUEL COMPANY quAuTV ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECil0N SUBJECT REVISION NO NO.

APP C ACRONYMS / ABBREVIATIONS / DEFINITIONS 0

PROCEDURE A

document which specifies instructions fo; performar. cts of a particular task. It includes methods

+

to be

employed, description of equipment or material to be used, sequence of operations, etc.

PROCESS One or more operations,

methods, functions, procedures or other specified actions, which result in the desired end item or result.

PROCUREMENT AUTHORIZATION A document used to transmit OR PURCHASE (MATERIAL) procurement information/ documents to REQUISITION the procurement function for the purpose of obtaining bids, placing L

orders and change orders, etc.

pas are generated by BWFC engineering and L

project management organizations and prs are issued by CNFP personnel.

l i

PROCUREMENT DOCUMENT A contractually binding document, identifying and defining the requirements which items or services must meet prior to acceptance, Also includes procurement authorizations, purchase requisitions, purchase

orders, contracts,
drawings, specifications, or instructions.

. QUALIFICATION (PERSONNEL)

A demonstration of those characteristics or abilities of an individual, gained through training and/or experience, that enable him I

to perform specific functions.

QUALIFIED EQUIPMENT Equipment which has been evaluated by sufficient testing to assure performance within specified parameters.

QUALIFIED PARTY OR A person or organization competent INDIVIDUAL and recognized as knowledgeable to perform certain functions.

Page 7 of 12

~

B&intFUEL COMPANY

\\

quAuTY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES i

SECTION SUBJECT REVISION NO

_ NO.

APP C ACRONYMS / ABBREVIATIONS / DEFINITIONS 0

i 1

QUALIFIED PROCEDURE A procedure which incorporates all j

applicable code and standard i

requirements, manufacturing parameters and engineering specifications, and which has been proven adequate for the intended purpose.

QUALITY The properties or characteristics constituting those requisites of specifications,

codes, standards, industrial practices, other i

recognized methods and/or acceptance criteria, by which an item is judged.

QUALITY ASSURANCE All those planned and systematic

actions, including quality administration and quality control, which provide adequate confidence that an item will perform satisfactorily in service.

QUALITY ASSURANCE RECORD A completed document that furnishes evidence of the quality of items and/or activities affecting quality.

Records must be validated by stamps, initials, or signatures of authorized personnel or otherwise authenticated.

l QUALITY CONTROL Those quality assurance actions which provide a

means to control and measure the characteristics of an item or process to established requirements.

QUARTERLY Defined as occurring 4 times during the calendar year, ' performance of duties shall not be less than 2 months nor more than 4

months.

Individual procedures may be more restrictive.

Page 8 of 12

2,

B&WFUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

APP c ACRONYMS / ABBREVIATIONS / DEFINITIONS 0

REJECT A disposition which may be imposed i

on a nonconforming item providing for its withdrawal and isolation from further processing pending an evaluation to repair, rework, use-as-is, or scrap.

RELEASE AUTHORIZATION A document used to release CNFP for procurement, manufacturing, and fleid operations and to define and transmit the drawings, specifications, and other information applicable to those operations.

ras are generated by BWFC engineering and project management organizations.

REPAIR The process of restoring a

nonconforming characteristic to a condition such that the capability of an item to function reliably and safely is unimpaired, even though the item still may not conform to the original requirement in every aspect.

REVIEW / APPROVAL Acceptance indicated by signature /

initials and date.

REWORK The process by which a nonconforming item is made to conform to a prior specified requirements by completion, remachining, reassembling or other remedial means.

(Cutting off excess metal is rework; welding on an extension is repair).

SAFETY RELATED ITEMS Safety related items are those items that prevent or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of the public.

Page 9 of 12

l s

msWFUEL COMPANY l

QUALITY ASSURANCE PROGRAM f

SPENT FUEL & WASTE TECHNOLOGY SERVICES i

4 SECTION SUBJECT REVISION e

NO.

NO f

APP C ACRONYNS/ ABBREVIATIONS / DEFINITIONS 0

SAFETY RELATED SERVICES Safety related services are those services associated with the determination or verifications of one or more characteristics of a safety related item.

SERVICE The performance of activities such as engineering; inspection; test; i

nondestructive examination; destruc-tive examination; qualification of personnel, procedures, and equipment; audits; and calibration of measuring and test equipment.

SCRAP A disposition which may be imposed upon a nonconforming item when it has been established that the discrepancy renders the item unfit for its intended use and it is not economically or otherwise feasible to repair or rework it.. Scrap may also be excess material or damaged material remaining from fabrication operations which is unsuitable for further use.

SOURCE INSPECTION OR A review, observation or inspection SURVEILLANCE for the purpose of verifying that an action has been accomplished as specified at the location of item procurement or manufacture.

SPECIAL PROCESS A process, the results of which are highly dependent on the control of the process or the skill of the operators, or both, and in which the specified quality cannot be readily determined by inspection or test of the product.

SPECIFICATION A concise statement of a set of requirements to be satisfied by a

product, material, or process indicating, whenever appropriate, the Page 10 of 12

I;

'.(

Beinf FUEL COMPANY b

f QUALITY ASSURANCE PROGRAM i

SPENT FUEL & WASTE TECHNOLOGY SERVICES SF.CTION SUBJECT REVISION NO.

i NO.

APP C ACRONYNS/ ABBREVIATIONS / DEFINITIONS 0

means by which it may be determined whether the requirements given are satisfied.

SUPPLIER Any individual or organization who furnishes items or services in I

accordance with a

procurement document. An all inclusive term used in place of any of the following:

{

vendor, seller, contractor, subcontractor, fabricator, consultant, and their subtier levels.

SUPPLIER (SUBCONTRACTOR, An organization that performs part SUBTIER, LOWER TIER) of a contract for a supplier or contractor who has originally been awarded a contract.

SURVEILLANCE The act of monitoring or observing to verify whether an item or activity conforms to specified requirements.

TESTING An element of verification for the determination of the capability of an item to meet specified requirements by subjecting the item to a set of physical,

chemical, environmental, or operating conditions.

l TRACEABILITY The ability to trace the history, application, or location of an item and like items or activities by means of recorded identification.

USE-AS-IS A

disposition permitted for a

nonconforming item when it can be established that the item is satisfactory for its intended use.

VERIFICATION The act of reviewing, inspecting, I

testing, checking,
auditing, or otherwise determining and documenting whether items, processes, services Page 11 of 12

+d ae

-,m

B&W RIEL COMPANY QUALITY ASSURANCE PROGRAM c

i SPENT FUEL & WASTE TECHNOLOGY SERVICES SUBJECT REV 10N SECTION NO.

APP C ACRONYMS / ABBREVIATIONS / DEFINITIONS 0

or documents conform to specified requirements.

WAIVER Documented authorization to depart from some specified requirements.

WITNESS To observe performance.

WITNESS POINT A step in a process for which the quality organd.zation or customer has requested ncdification.

An organization may proceed cast a

witness point if the quality organization or customer representative are not present at the appointed time.

Page 12 of 12

1 is.

B&W FUEL COMPANY QUALITY ASSURANCL PROGRAM ADDENDUM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVi$l0N NO NO.

ADDENDUM A FOR NON-SAFETY RELATED ADD. A PRODUCTS AMD SERVICES 0

o Section No. A-O!

Introduction This Manual Addendum describes the Quality Asst rance Program (QAP) for 'the non-safety related products and services supplied by the B&W Fuel Company (BWFC) Spent Fuel & Waste Technology Services Product Line except for ASME Section III items which are covered by separate QA manuals.

o Section No. A-1:

Oraanization i

Same as Manual Section No.

1.

o Section No. A-2:

Ouality Assurance Procram A-2.1 Scone This QAP for non-safety related products and services takes into account the prerequisitos for achieving quality, such as the need for specialized equipment and skills; use of suitable l

administrative, process, and environmental controls; training l

and indoctrination of personnel performing activities affecting quality; and the need for verification or quality by inopection and test.

The classification of items and services as non-safety related is made and documented by the responsible engineering and project management functions.

The criteria for dctermining this classification is contained in a

BWFC procedure.

Essentially, any item or cervice that does not meet the safety related definition in Appendix C of this Manual is considered to be non-safety related.

As discussed in Manual Section 2.1, the non-safety related classification corresponds to DOE Quality Level 3.

l A-2.2 OAP Recuirements This QAP for non-safety related products and services is L

organized and administered to comply with the Statement of Policy and Authority in the front of this Manual.

It also l

allows for taking into account quality requirements as may be imposed by contract.

Page 1 of 9

.O,,.

t BBWFUEL COMPANY QUALITY ASSURANCE PROGRAM ADDENDUM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION

$UBJECT REVISION NO.

NO.

ADDENDUM A FOR NON-SAFETY RELATED ADD. A PRODUCTS AND SERVICES 0

k A-2.3 OhP_ Imolementation

_E Samt as Manual Section 2.3-with the exception that only the policies, procedures, and instructions identified in Appendix A-A to this Addendum apply.

A-2. (_I1AP__bssesement same as Manual section 2.4.

A-2.5 OAP Indoctrination and Trainina Same as Manual section 2.5 except that personnel performing inspection, surveillance, and audit activities need not be 1

formally qualified and certified, o

Section No. A-3:

Desian Control A-3.1 ScoDe Design control measures are applied to all non-safety related items and services as defined in written procedures and instructions.

A-3.2 Desian Documents g.

As may be determined by the cognizant Project Manager, engineering units within project or functional organizations are responsible for the preparation, review, and approval of design documents.

Design documents include such documents as specifications,

drawings, and analyses.

These documents specify technical.and quality requirements appropriate to the activities they cover.

Design documents'Ere reviewed for completeness and technical accuracy.

The reviewer may be any technically qualified individual other than the preparer of the document.

A-3.3 Desian Interfaces The preparers / reviewers of design documents are responsible to assure the consideration of design interfaces. The Project Managers coordinate design interfaces with the customer.

}

Page 2 of 9

e

. =.

C&W FUEL COMPANY

+

I QUALITY ASSURANCE PROGRAM ADDENDUM SPENT _ FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION i

NO.

NO.

ADDENDUM A FOR NON-BAFETY RELATED ADD. A PRODUCTS AND SERVICES 0

A-3.4 Desian Verification The responsible Engineering and Project Managers determine the a

need for_ design verification.

Verification methods include t

design analyses -(calculations), design review boards, and testing.

A-3.4.1 Desian Analyses Design analyses (calculations) may be used to establish design requirements or to verify a

design.

Calculations are documented and reviewed for technical accuracy.

The reviewer may be any technically qualified individual other than the preparer of _ the calculation.

Computer programs used for

_ design analyses are verified to the extent necessary to assure that-they perform their intended functions.

A-3.'4.2 Deslan Review Boards Same as Manual Section 3.4.3.

I A-3.4.3 Testina Testing may be used to demonstrate that designs or design features are suitable for their intended applications.

The criteria for such testing is determined and documented by the responsible engineering organization.

Test results are reviewed by the responsible engineering organisation against this criteria.

A-3.5 _Desian Chances Design changes are subject to the same design controls that were applicable to the original design.

A-3.6 Release of Desian Documents Same as Manual Section 3.6 with the exception that release of Equipment Engineering Design documents may be as specified in CNFP procedures.

Page 3 of 9

B&WFUEL COMPANY

(

QUALIN ASSURANCE PROGRAM ADDENDUM SPENT FUEL & '#ASTE TECHNOLOGY SERVICES SECTION SUBRCT.

REVISION NO.

NO.

ADDENDUM A FOR NON-8AFETY RELATED ADD. A PRODUCTS AND-SERVICES 0

o Section No. A-4:

Procurement Document Control A-4.1 General controls are establirhed to assure that procurement documents contain appropriate

quality, tecanical, and manufacturing requirements.

A-4.2 Procurement Process Procurement Authorization (pas) or CNFP Purchase Requisitions (prs) are used to identify the technical, manufacturing, quality, and other requirements applicable to the items and/or services to be procured.

pas and prs are prepared, reviewed, and approved as prescribed in procedures.

Project Managers are authorized to procure items and/or services directly from other B&W organizations using the PA as the contract with these organizations.

Orders to be placed with all other suppliers are processed through Purchasing.

Purchasing converts the PA or PR into a Purchaser Order (PO) or Change Order (CO).

The PO/CO is then sent to the supplier.

A-4.3 Procurement Document Review Procurement documents are reviewed by the appropriate quality organization to determine that requirements are correctly stated and that the procurement is properly classified as non-safety related.

The quality organizations have the responsibility and authority to order termination or suspension of procurement activities when procurement documents conflict with the requirements of this QAP.

Such orders will indicate the action to be taken to allow resumption or reinstatement of the procurement activity.

A-4.4 Chances to Procurement Documents Changes to procurement documents are processed in the same manner as the original procurement documents.

Page 4 of 9

4

.C

/

B&WFUEL COMPANY

, *~

i QUALITY ASSURANCE PROGRAM ADDENDUM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT -

1 REVISION ADDENDUM A FOR NON-8AFETY RELATED ADD. A PRODUCTS AND SERVICE 8 0

o Section No. A-5:

Instructions. P'gocedures, and Drawinas i

A-5.1-General All activities affecting quality are prescribed by instructions, procedures, or drawings appropriate to the circumstances and accomplished accordinaly.

Instructions,

cedures, and drawings include or reference adequate iM:etitative or qualitative criteria for determining that W avtant activities have been satisfactorily accomplished.

A-5.2 Administrative Policies. Procedures, and Instructions i

l' l

This QAP is implemented through this Manual Addendum, CNFP QA l

plans, and written administrative policies, procedures, and instructions.

These policies, procedures, and instructions are prepared by responsible personnel.

reviewed by other.

organizations to whom they apply, and then reviewed and-approved by the responsible quality organizations before they are approved and distributed for use.

A-5.3 Drawinas and Soecificationg Drawings, specifications and other documents are released for use by CNFP in procurement, manufacturing, and field operations as described in Section A-3.6.

Drawings and specifications for CNFP Specialty Manuf acturing activities may be included in direct orders from customers.

A-5.4 Manufacturina. Inspection, and Test Plans l-Suitable methods, including verbal instructions by responsible personnel, are used to define the manufacturing and inspection sequences for.non-safety related items and to prescribe the applicable drawings, specifications, and procedures to be used in performing the sequences. The manufacturing and inspection procedures need not be written procedures.

o Section No. A-6:

Document Control A-6.1 General The following types of documents are prepared, reviewed,

approved, and issued in accordance with procedures or instructions:

Page 5 of 9

p m.

'l.c W

B&W FUEL COMPANY QUALITY ASSURANCE PROGRAM ADDENDUM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

i ADDENDUM A FOR NON-SAFETY RELATED ADD. A PRODUCTS AND SERVICES.

0 (a)

Design documents (calculations, drawings, specifications) as described in Sections A-1 and A-5.

(b)

Procurement documents as des ribed in Section A-4.

(c)

Instructions and procedures ab described in Section A-5.

l (d)

Manufacturing and inspection documents as described in p

Section A-3.

l (e)

Nonconformance reports as described in Section A-15.

Established procedures assure technical adequacy. of, and inclusion of appropriate requirements.in the above documents by requiring review by qualified reviewers prior to their implementation.

Changes to these documents are processed in the same manner as the original documsnts.

)

l_

A-6.2 Dogment Control System l

Same as Manue.1 Section 6.2.

l A-6.3 Document Submitta1 Control l;

Same as Manual Section 6.3.

o Section No. A-7:

Control of Purchasei Items and Services-Same as Manual Section No. 7 with the following exceptions:

-(a)

The requirements of Manual Sections 7.2

" Supplier Evaluation",

7.3

" Approved Supplier List",

and 7.5

" Source Inspection or Surveillance" do not apply unless specifically requested by the organization requisitioning the product or service.

It:is the responsibility of the requisitioning organization and/or purchasing to assure that non-safety related items and services are procured from reputable suppliers with known capability of providing the items or services being purchased.

Page 6 of 9

. ~. -

B&WFUEL COMPANY QUALITY ASSURANCE PROGRAM ADDENDUM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO:

NO-ADDENDUN A FOR NON-SAFETY RELATED ADD. A PRODUCTS AND SERVICES 0

(b)

The requirements of Manual Section 7.6 " Receiving Inspection" are replaced by the following:

Incoming items-received at CNFP for use in non-eafety related applications, at least,-

undergo a visual inspection for shipping damage and vel;'ication that-the items received were the items ordered.

(c)

Certificates of Conformance/QA Data Packages per Manual Section 7.7 are not furnished for non-safety related items or services unless

' quested by the customer.

o Section No. A-8 Identificat u and Control of Items Same as Manual Section No. 8 with the exception that the L,

Release Point System-described in Manual Section 8.2 does not apply to non-safety related items.

It is the responsibility of the manufacturing organizations to ' assure that they are l

using the proper items and maintaining the necessary traceability during the fabrication and assembly of non-L safety related items, o

Section No. A-9:

Control of Processes Same as Manual Section No.

9 when special processes are specified by the responsible engineering organization, o

Section No. A-10:

Insoection Inspections of non-safety related items for acceptability are performed and documented as specified by the responsible engineering and/or manufacturing organizations.

Inspections may be. performed by any competent individual using measuring and test equipment calibrated and controlled in accordance with Section A-12.

Any nonconformances found during inspections are processed as-described in Section A-15.

o-Section No. A-11:

Test Control Tests of non-safety related items are performed and documented

-as specified by the responsible engineering and/or l

manufacturing organizations.

Measuring and test equipment used during the performance of tests is calibrated and controlled.as specified in Section A-12.

Page 7 of 9

B&WFUEL COMPANY QUALITY ASSURANCE PROGRAM ADDENDUM SPENT FUEL & WASTE TECHNOLOGY SERVICES

~ SECTION SUBJECT REVISION NO.

NO.

ADDENDUM A FOR WON-SAFETY RELATED ADD. A PRODUCTS AND SERVICES 0-o Section No. A-12:

Control of Measurina and Test Eauinmerit (M&TE)

Same as Manual Section No.

12.

However, the following exceptions may be utilized provided M&TE for non-safety related items is segregated from M&TE for safety related items:

(a)

M&TE may be calibrated against reference standards having an accuracy at least that of the M&TE be3ng calibrated.

(b)

Suppliers of calibration services for M&TE need not be QA audited and approved suppliers, o

Section No. A-13:

Handlino, Storace, and Shineina Same as Manual Section No. 13.

o Section No. A-14:

Insoection. Test, and Operatina Status Same as-Manual Section No. 14 with the following. exceptions:

(a)

Route Cards are not required (See Section A-5).

(b)

Any competent individual may perform the functions of an inspector (See Section (A-10).

o Section No. A-15 L Control of Nonconformances Same as Manual Section No. 15 except the use of CDR's at CNFP is not mandatory, o

Section No. A-16:

Corrective Action Same as Manual Section No. 16.

o Section No. A-17:

Ouality Assurance Records Same as Manual Section No. 17.

Page 8 of 9 l

[

~

B&W FUEL COMPAntY QUALITY ASSURANCE PROGRAM ADDENDUM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

ADDENDUM A FOR NON-SAFETY RELATED ADD. A PRODUCTS AND SERVICEb 0

o Section No. A-18:

Audits Same as Manual Section No. 18 with the following exceptions:.

(a)

Auditors need not be formally qualified and certified as described in Manual Section 18.1.

(b)

Internal audits need only be performed once every two calendar years.

(c)

Supplier audits are not required.

Page 9 of 9

i B&WFUEL COMPANY QUALITY ASSURANCE PROGRAM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION

,'i NO.

NO.

QA PROGRAM POLICIES, PROCEDURES, APP.A-A AND INSTRUCTIONS (TYPICAL LISTING)

-0 Applicable Sections i

Document No.

_ Document Title gf_Er.nual Addendum l

BWNT-0199-01 Organization Charts A-1 CNFP-QA Plan for Non-Safety A-1 to'A-18 Related Mnnufacturing Operations CNFP QA Plan for Non-Safety A-1 to A-18 Related Field Operations

'BWNT-0310-47 Release Authorisations A-1 to A-18 07-1000584 Quality Classification System A-2 i

BWNT-1702-25 Assignment of Nuclear Safety A-2 l

Classification to Products &

Services BWFC-0402 Quality Assurance Program A-2 BWNT-1702-22 Employee Training A-2 QC-1449 CNFP QA Program Training A-2 BWNT-0402-01 Calculations A-3, A-6 BWNT-0403-11 Technical Document Signatures A-3, A-6 BWNT-0405-22

-Design Review Boards A-3 BWNT-0412-57/58 Detail Design Documents A-3 to A-6, A-11, A-13'

.BWNT-0412-59 Engineering Information Record A-3,A-5,A-6, A-11 BWNT-0412-63 Technical Document Format A-3, A-5, A-6 BWNT-0412-66 Release of Product Documentation A-3 to A-6 BWNT-0412-67 Processing Technical Documents from A-3 to A-7 Suppliers & Customers BWNT-0902-10 Software Development A-3, A-6 Page 1 of 3

B&WFUEL COMPANY QUALITY ASSURANCE PROGRAM ADDENDUM SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

-NO QA PROGRAM POLICIES, PROCEDURES, APP.A-3 AND= INSTRUCTIONS (TYPICAL LISTING) 0 Appliccble sections Document No.

Document Title of Manual Addendum BWNT-0903-03 Software Documentation A-3, A-6 BWNT-1212-12 Procurement Documents A-4 BWNT-1705-16 QA Review of Procurement Documents A-4 QC-1402 Review of CNFP PO/COs A-4 PC-1305 Purchase Requisitions (CNFP)

A-4 BWFC-0501 Policies, Procedures & Operating A-5,-A-6

' Instructions BWNT-1303-07 Administrative Procedures A-5, A-6 BWNT-1303-15 Control of Manuals A-5, A-6 BWNT-1303-17 Operating Instructions A-5, A-6 QC-1410-CNFP Quality Administrative &

A-5, A-6 Operating Procedures QC-1434 CNFP Concurrence Requests A-6 BWNT-0310-05 Product Numbering A-8 QC-1405 Control of Measuring Equipment by CNFP, A-12 BWNT-0405-05 Contract Variation Approval Request A-15, A-16 (CVAR)

BWNT-1703-71 BWFC Quality Action Reports A-15, A-16 BWNT-1717-02 Internally Identified Design A-15, A-16 Deficiencies QC-1413 CNFP Nonconforming Materials, Parts, A-15, A-16 or Components QC-1423 CVAR Processing by CNFP A-15, A-16 Page 2 of 3

n-(

B&WFUEL COMPANY QUALITY ASSURANCE PROGRAM J

SPENT FUEL & WASTE TECHNOLOGY SERVICES 1

SECTION SUBJECT REVISION NO.

NO.

QA PROGRAM POLICIES, PROCEDURES, APP.A-A AND-INSTRUCTIONS (TYPICAL LISTING) 0 l

Applicable Sections Document NrA Docuinent Title of Manual Addendum QC-1447 CNFP. Field Operations Problem Reports A-15, A-16 l-

.QC-1412 CNFP Corrective Action A-16 1El Records Management Program A-17 QC-1414 Retention &~ Storage of CNFP QA Records A-17 b

l

.BWNT-1719-21

'QA Audits of Internal Activities A-18 QC-1411 Internal Audits of CNFP Activities A-18 l

l L

i

't l

r 6

Page 3 of 3 i:

I

e

,,,.7 CGWFUEL COMPANY QUALITY ASSURANCE PROGRAM j

SPENT FUEL & WASTE TECHNOLOGY SERVICES SECTION SUBJECT REVISION NO.

NO.

APP.A-B ACRONYNS/ ABBREVIATIONS / DEFINITIONS 0

w..

r Same as Manual Appendix C.

I 4

l L

ll.

3

.