Ack Receipt of 931008 Request That NRC Suspend Review of Amend Application for Modifying Gadolinia Scrap Recovery Process Until Notification of Schedule for Resumption
ML20058P899
Person / Time
Site: Framatome ANP Richland
Issue date: 10/21/1993
From: Pierson R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Maas L
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
References
TAC-L30506, TAC-L30591, NUDOCS 9310250290
Download: ML20058P899 (4)


Text

{{#Wiki_filter:,.. ] ) s. Docket 70-1257 License SNM-1227 .j OCT 211993 Mr*. Loren J. Maas Manager, Regulatory Compliance Siemens Power Corporation ) 2101 Horn Rapids Road Richland, WA 99352-0130 l

SUBJECT:

1) GAD 0LINIA SCPAP REC 0VERY PROCESS (TAC NO. L30506) l
2) UF FACILITY RELOCATION (TAC NO. L30591) l 6

We have received your letter dated October 8,1993, requesting that the 1 Nuclear Regulatory Commission suspend review of your amendment application for modifying the gadolinia scrap recovery process, until you notify us of your schedule for resumption. i As you know we have already expended significant effort on this review. We estimate that to complete the review and issue a decision on the amendment would require less than 2 weeks of staff tirne. le suspend the review for 6 months or more, as your letter suggests, and then resume the review will require additional time for the staff to refamiliarize themselves with'the amendment application, the request for additional information (RAI), and your response to the RAI. This delayed effort will therefore be potentially more costly to Siemens. Your response to the RAI for the UF cylinder storage relocation amendment 6 request was due October 15, 1993; as of now, we have not received a response to this RAI. Because of other scheduling commitments which will impact our ability to review this at a later date we will inform you of our expected completion date following receipt of your response to the RAI. If you have questions regarding these amendments or our plans to address them, please contact me at 301-504-3493 or Mary Adams at 301-504-2505. Please i reference the above TAC Nos. in future correspondence related to these requests. SNf6MlE61GNED BY i Robert C. Pierson, Chief Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS DISTRIBUTION: (Control No. 5B05 and 1C05) Docket 70-1257 PDR NRC File Center Region V NMSS r/f FCSS r/f FCLB r/f FCLS2 r/f ETenEyck CHooker, RV [G:\\ POSTPONE.SPC]

  • See previous concurrence I 0FC FCLB*

E FCLB* E FCLB* E FCLB E NAME-Madams VTharpe MTokar RPierbfn { t i DATE 10/19/93 10/19/93 10/19/93 10/b/93 i / n c y'n b .I h Il 9310250290 931021 s h4 PDR ADOCK 07001257 1 C PDR J j I

g_ w .i Docket 70-1257 License SNM-1227 1 Mr. Loren J. Maas Manager, Regulatory Compliance / Siemens Power Corporation /- i / 2101 Horn Rapids Road Richland, WA 99352-0130

SUBJECT:

1) GAD 0LINIA SCRAP REC 0VERY PROCESS (TAC NO. d O506) 1
2) DF FACILITY RELOCATION (TAC NO. L30591) 6 We have received your letter dated October 8,1993,, requesting lthat the _ _

Nuclear Regulatory Commission suspend review of your amendment application for modifying the gadolinia scrap recovery process, u 'til you notify us of your schedule for resumption. Since we have already expended significant eff rt on the review, we would prefer to complete it, rather than to set th ' amendment aside and then restart 9 at some undetermined future date. We estimate that to complete the review and issue a decision on the amendment will req ' ire less than 2 weeks of staff time. To suspend the review for 6 months r more, as your letter suggests, would require additional time for the stp f-to refamiliarize themselves with the amendment application, the request for additional information (RAI), and your response to the RAI when the review is resumed. This would not be an efficient use of staff resources, wou 6 have an adverse impact on other work, and be potentially more costly to Si ens because of the duplication of effort. i With respect to the UF,, cylinder storage relocation amendment request,:your response to the RAI was due Octob6r 15, 1993; as of now, we have not received. a response to this RAI. Inasmuc,h as we have scheduled staff time within the-next month to review the respor)de and issue a decision on the amendment - ~' application, it is important that the responses be provided within the timeframes specified in the I letter. If you have questions regar ing these amendments or our plans to address them, please contact me at 301-504-3493 or Mary Adams at 301-504-2505. Please reference the above TAC Nds. in future correspondence related to these requests. i Sincerely, t Robert C. Pierson, Chief j Licensing Branch / Division of Fuel Cycle Safety and Safeguards, NMSS DISTRIBUTION: ( ntrol No. 5B05 and ICOS) Docket 70-1257 PDR NRC File Center Region V NMSS r/f FCSS r/f FCLB r/f FCLS2 r/f ETenEyck CHooker, RV [G:\\POSTPONEy PC] 0FC / FCLB b FCLB - 6 FCLB 6 FCLB NAME MAdamsN[I !Vibrpe MToka7 8 RPierson-DATE 10//#l/93 10/1 4/93 10/d/93 10/ /93

j , OCi OS '93 12:48 SPC_ 509-375-8402 P.2 .N SIEMENS \\ O i .b October 8,1993 i U.S. Nuclear Regulatory Comm!ssion Attn: Mr. Robert C. Plcrson, Chief Ucensing Branch Division of Fuel. Cycle Safety and Safeguards, NMSS Washington, DC 20555 Ucense No. SNM-1227 Docket No. 70-1257 f

Dear Mr. Pierson:

Re: 1. Letter, JB Edgar to JWN Hickey, dated January 18,1993 ) 2. Letter, M. Tokar to LJ Maas,

  • Modifications to Gadolinia Scrap Recovery Process l

in El.O Buliding (TAC No. L30506)," dated June 4,1993 3. L6tter, JB Edgar to RC Pierson, dated July 23,1993 i l \\ in reference 1 Siemens Power Corporation (SPC) requested a license amendment addressing modifications to our gadolinia scrap recovery process. References 2 and 3, respectively, are a request for additional Information from the NRC and submittal of that information by SPC. Per recent conversations between Mary Adams of your staff and myself the modification program described in the references has been postponed for at least six months. SPC will notify you within six months of the schedule forlesumption of work on those modifications so that the NRC can resume its review. If you have any questions regarding this project, please call me at 509-375-8663. Very truly yours, James B. Edgar Staff Engineer, Ucensing JBE:pm Siemens Power Corporation RWAX HO. Nuclear Divson Engineering ard Manufactunng Fact:ny PAGE OF d 2101 Horn Rapcs Road. PO Box 130 Richland. WA 993520130 Tel: (509) 3758100 Fax: (509) 375 PA02 f}-{OW

ocT 08 '93 12:47 SPC 509-375-8402 P.1 1 SIEMENS ) W ~ Siemens Power Corporation t FACSIMILE COVER SHEET 10/2 )MP PAess TO FOttOw. I i DATE: rigg in. TO: NAME: % MLAS FIRM: l4SNEf. t f n RECEMNG FAX NO.: Ej-6C)4--2269 or 2260 MAKE EXTRA DISTRIBUTION TO: i MESSAGE: [ h 4 FROM FOR COMMUNICATIONS USE ONLY FAX VERIFICATION NO. FAX MACHINE NO. (509) 375-8484 (509) 375-8402 PHONE NO.: -- bb3 - Mall BOX NOJ OPERATOR; O Sternens Power Corporation l Nuclear DMslon 7g& Engineering and Manufacturing Fac!!!ty L% NO-ME SENT: 2101 Horn Rapids Road, PO Box 130 Richland, WA 99352-0130 SPC ND. 4121.017A rR 2107/02i r

s 'l < TRANSACTION REPORT > 10-08-1993(FRI) 15:32 C RECEIVE J NO. DATE T!r1E DESTINATION STATION PG. DURATION t10DE RESULT

.'262 10-08 15:31 1 509 375 8402 2

0*01'34" tort 1AL OK 2 0*01'34* I I --}}