ML20057E821

From kanterella
Jump to navigation Jump to search
Advises That Inspector follow-up Items 93-201-02 & 93-201-03 Do Not Require Changes to Fnmc Plan Per 930924 Memo
ML20057E821
Person / Time
Site: Framatome ANP Richland
Issue date: 10/08/1993
From: Pierson R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Casey Smith
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20057E822 List:
References
NUDOCS 9310130195
Download: ML20057E821 (1)


Text

!

=

j.n.

a.

OCT 8 B93 MEMORANDUM FOR:

C. N. (Mike) Smith, Chief Operations Branch Division of Fuel Cycle Safety and Safeguards, NMSS FROM:

Robert C. Pierson, Chief Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS

SUBJECT:

MATERIAL CONTROL AND ACCOUNTING LICENSING CONCERNS AT SIEMENS POWER CORPORATION In your memorandum to me dated September 24, 1993, you refer to three Inspector Follow-up Items (IFIs) (i.e., 93-201-03, 93-201-04, and 92-201-02)

{

that involve changes to the Siemens Fundamental Nuclear Material Control (FNMC) Plan.

Richard Milstein, the MC&A license reviewer for Siemens, has been in contact with the licensee regarding IFIs requiring FNMC Plan changes.

It should be noted, however, that two of the items, IFI 93-201-03 and 92-201-t 02, do not require changes to the FNMC Plan.

ORIGINALSIGNEDBY l

s Robert C. Pierson, Chief Licensing Branch Division of Fuel cycle Safety and Safeguards, NMSS Distribution: w/ incoming l

Docket 70-1257 PDR NRC File Center FCSS R/F FCLB R/F FCLS2 R/F NMSS R/F Region V ETenEyck Madams OFC FCLB E

FCLB dr FCLB

[

FChB, E

i 3

kfkRMilstein Ide MT61fj7#of RPihson NAME DATE 10/f/93 10/ 6 /93 10/4 /93 10/k/93 0 = COVER E = COVER & ENCLOSURE N = NO COPY G:\\0PER104 120032 M

9310130195 931008 i

i PDR ADOCK 07001257 0

'l C

PDR il i

,_.