Monthly Operating Rept for Nov 1993 for Oyster Creek Nuclear Generating Station
ML20058L571
Person / Time
Site: Oyster Creek
Issue date: 11/30/1993
From: J. J. Barton, Krall J
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
C321-93-2297, NUDOCS 9312170088
Download: ML20058L571 (7)


Text

.. o'

.. e t

GPU Nuclear Corporation O'.il Nuclear

e;;;==

o Forked River. New Jersey 08731-0388 609 971-4000 Writer's Direct Dial Number:

C321-93-2297 December 9,1993 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555

Dear Sir:

Subject:

Dyster Creek Nuclear Generating Station Docket No. 50-219

-Monthly Operating Report In accordance with the Oyster Creek Nuclear Generating Station Operating License No. DPR-16, Appendix A, Section 6.9.1.C, enclosed are two (2) copies of the Monthly Operating Data (gray book information) for the Oyster Creek Nuclear Generating Station.

If you should hava any questions, please contact Brenda DeMerchant, Dyster Creek Licensing Engineer at (609) 971-4642.

/

Sin

rely,

/

)

1 s

1. J. lard I

li

' resident ind Director Dys r Creek

~JJB/BDEM: jc Attachment (MOR-RPT.Nov) cc:

Administrator, Region 1 Senior NRC Resident Inspector Dyster Creek NRC Project Manager 17004A 9312170088 931130 PDR ADOCK 05000219

((M R

PDR GPU Nuclear Corporation is a subsidiary of General Pubhc Ubbties Corporation -

//j

SUMMARY

NOVEMBER. 1993 Oyster Creek entered November operating at full power.

Full power operation continued until November 20,1993, when power was manually reduced to 40% in order to perform the quarterly Main Steam Isolation Valve full closure test.

The plant maintained full power operation for the remainder of the month and generated 446,311 net electric megawatt hours for the month.

t 1

MONTHLY OPERATING REPORT LICENSEE EVENT REPORTS The following Licensee Event Report was submitted during the month of November, 1993:

LER 93-006 On September 5,1991, Technical Specification Amendment 153 became effective requiring a Maximum Average Planar Linear Heat Generation Rate (MAPLHGR) reduction to less than 90% if one Core Spray loop / component becomes inoperable.

On October 21, 1993, it was identified that several. Core Spray' System surveillance procedures have both main pumps or main discharge valves of either loop disabled. 0n four occasions the MAPLHGR exceeded 90% during the execution of these procedures, thus placing the system outside of its design basis.

The cause of this event was the omission of the above mentioned procedures to be revised subsequent to the issuance of the Technical Specification Amendment 153.

Safety Significance is minimal since'the design basis conservatism exceeds'the amount by which the plant operated above the Technical. Specification. limits.

for MAPLHGR.

In addition, operator actions could have brought the disabled Core Spray loop to full operating status, had'an accident occurred..

Interim corrective action was taken to ensure.that-MAPLHGR does not exceed 90%

during the execution of the subject-procedures. A supplement to'.this report-will provide the resulting corrective actions.once a full review is completed.

\\

+

s' Oystar' crook u ation #1 I

Docket No. 50-219 a

REFUELING INFORMATION - NOVEMBER, 1993

\\

Name of Facility: Oyster Creek Station #1 Scheduled date for.next refueling shutdown: Currently projected for-September,1994 Scheduled date for restart following refuelings.' currently-projected for December, 1994 Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

No Important licensing considerations associated. with. refueling, e.g.,. new or different fuel design or supplier, unreviewed design' or performance analysis methods, significant changes in fuel design, new operating procedures:

1.

General Electric Fuel Assemblies '- Fuel design and. performance analysis methods have been approved by'the NRC.

b The number of fuel assemblies (a) in the cors

-560

=

.(b) in the spent. fuel storage pool 1882-

=

(c) in dry storago 8

=

The present licensed spent fuel pool' storage capacity. and the - size of any increase in licensed storage capacity that has been requested or is' planned, in.

number of fuel assemblies:

Present Licensed Capacity: 2600 The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

Full core discharge capacity to the ' spent fuel pool will be available through the 1996 refueling outage.

NRC_RPT.WPD/105

= = _ = = = _ =_:=__ _- -=------ _ _ - -.

^

AVERAGE DAILY POWER LEVEL NET MWe DOCKET #.

.50-219 UNIT.

OYSTER CREEK #1 REPORT DATE.

12-06-93 COMPILED BY

. JIM KRALL TELEPHONE #.

.609-971-4115 MONTH:

NOVEMBER, 1993 EAX E

D3.1 E

1.

627 16.

624 2.

628 17.

625 3.

627 18.

626 4.

627 19.

625 5.

626 20.

451 6.

625 21.

609 7.

628 22.

627 8.

629 23.

626 9.

628 24.

626 10.

628 25.

628 11.

629 26.

628 12.

627 27.

617 13, 628 28.

622 14.

626 29.

627 15.

625 30.

628 NRC_RPT.WPD/106

OPERATING DATA REPORT

. OPERATING STATUS

.1.

DOCKET:

50-219

2. REPORTING PERIOD:

11/93

3. UTILITY CONTACT:

JIM KRALL (609)971-4115

4. LICENSED THERMAL POWER (MWt):

1930

5. NAMEPLATE RATING (GROSS MWe):

687.5 x-0.8 = 550~

6. DESIGN ELECTRICAL RATING (NET MWe): '650
7. MAXIMUM DEPENDABLE CAPACITY (CROSS MWe):

632

8. MAXIMUM DEPENDABLE CAPACITY (NET MWe):

610

9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:

NONE

10. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

NONE

11. REASON FOR RESTRICTION, IF ANY:

NONE MONTH XEAR CUMULATIVE

12. REPORT PERIOD HOURS 720.0 8016.0 209856.0
13. HOURS RX CRITICAL 720.0 6946.6 138855.0.

0

14. RX RESERVE SHUTDOWN HRS 0.0 0.0

'918.2

15. HRS GENERATOR ON-LINE 720.0 6910.4 135457.7
16. UT RESERVE SHTDWN HRS 0.0 0.0 0.0
17. GROSS THERM ENERGY (MWH) 1373772 13171183 231679937
18. GROSS ELEC ENERGY (MWH) 463048 4364759-

.77760897

19. NET ELEC ENERGY (MWH) 446311 4197929 74581553
20. UT SERVICE FACTOR

'100.0' 86.2 64.5.

21. UT AVAIL FACTOR 100.0 86.2 I64.5
22. UT CAP FACTOR (MDC NET) 101.6 85.9 58.0.
23. UT CAP FACTOR (DER NET) 95.4 80.6 54.7
24. UT FORCED OUTAGE RATE 0.0 0.0 10.5.
25. FORCED OUTAGE HRS 0.0 0.0 15957.3:
26. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATO, DURATION):

NONE

27. IF CURRENTLY SHUTDOWN,' ESTIMATED STARTUP DATEi N/A NRC_RPT.WPD/107

I lll

.1 ml al y

e u l o tf S

l t S

T a

e N

u1 nv.

E n0 i l M

a4 aat M

m eMvs EO oh e

VC st t ynt I /

a l o TS wd s rie t

CN e r et r EO rcot au RI euf rl s RT wd r aoo OC oeeusl CA P r pqI c 3

9 9

R 1

n GO) a N

2 k

E TO e

r I R(

e 6

r TTR C

r 8

UCE e M 1

HAW 9

r b 8

SEO 1

1 e

m d 4

RP 2

t e

i F

s c v 1

OEG 0

v e

a 7

HN 5

O D D

9 DTI O

C HNU TWD EOE OE:

B :

MDR Y

E NM DN A

O E

'T H TN LP m)

)

KTEPE an CI TML 1

ri

(

ONAOE mca S

DUDCT aSl N

N r

p O

O b

ccx S

I SiE T

A t(

E C

D ll a U

R f

aamr 0

D i

uuoe E

T nnth R

E a a ut MMMAO REW

)

O 21234.

P

(

DN N

A 0 )s 1

r 5

1 u

0 M

A o

W R h O

U D

D(

m T

a. )

JP x

n I

E i

S a

e l

T i

p I

L x

NU

& ' E

(

g r

n o

i r) ner n i vEi ai a

d rtll E

e T aap P

l 5

rnx Y d u rt oE T ed osi(

c e ti t rh a na r oc rire FS emeh pd pt OAOO FS ef 3h

)n 3

0 i

9 E

2 a

9 T

1 l

1 A

1 p

n D

3 x

o r

9 E

. i e

( t t

b s

c m

ee e

. i rT r

v u

t o

l r. s N

i o e

a R

F ec y

t ngr naao H

enl t T

mel a N

3 N

p ael o

O N

O i

t uu M

S utf g TA qae e T

RE EMRR R

AR O

M P

M)

E U1 ab. cd.

R S(

l!lll!